Payments concentrated with one vendor
69% of vendor payments went to AADI AND RUDRANSH CONSTRUCTION COMPANY.
Allocated limit
₹17.40 Cr
Median ₹14.70 Cr
Fund utilisation
86%
₹15.00 Cr recommended · 114 works
Above median (76%)
Paid to vendors
₹8.39 Cr
48% of allocation
Above median (37%)
Works completed
21
18% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP114 works
₹15.00 Cr · 86% of the ₹17.40 Cr allocated
- Sanctioned by the district47 works
41% sanctioned · took 3.8 months on average (due within 45 days)
- Completed21 works
₹3.24 Cr final cost · 13.7 months from recommendation on average
67 works are still awaiting sanction, 7 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 114 works worth ₹15.00 Cr, a fund utilisation of 86%, higher than 67% of 18th Lok Sabha MPs.
- The district has sanctioned 47 of them, taking 3.8 months on average.
- ₹8.39 Cr has been paid to vendors, 48% of the allocation.
- 21 works are complete, typically 13.7 months after recommendation. 21 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 16 vendors. The largest received 69%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 49/100: finishing works counts most
- Works completed 30%18Completed ÷ recommended works.
- Spending efficiency 20%39Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%86Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%48Paid to vendors ÷ allocated limit.
- Vendor diversity 10%38How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: AADI AND RUDRANSH CONSTRUCTION COMPANY, 69% of payments across 16 vendors.
District sanction speed
86/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%86Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
115 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of an interlocking road on the Bhawanigarh Deeh Link Road, from the Ramlila Maidan to the Kutia of Vindhyasevak Baba, Block Baldirai, District Sultanpur, with a total length of 100 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320813
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road in Village Vishwanathpur from the house of Amar Bahadur Singh up to the Ram Janki Temple, Gram Sabha Uskamau, Block Baldirai, District Sultanpur, with a total length of 100 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320814
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road in Gram Sabha Hasai Mukundpur, from the house of Harun near the mosque up to the Government Tubewell, Block Baldirai, District Sultanpur, with a total length of 100 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320815
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road Under Gram Sabha Sirsira, on the remaining portion from Ichhangoda Marg up to the primary school, Block Salon, District Raebareli, with a total length of 50 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320817
₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road Under Gram Sabha Paksarawan, from Khwajapur Marg to Paksarawan,Block Salon, District Raebareli, with a total length of 120 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320818
₹7.2 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from Pure Kalandar to Pure Sadhai in Gram Thauri, Block Deeh, District Raebareli, with a total length of 200 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320819
₹12.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road near Ramkishan's house up to the house of Jeevan Lal in Gram Sabha Dohari, Block Deeh, District Raebareli, with a total length of 125 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320820
₹7.5 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from the Tiloi Inhauna road up to Sunita Singh's house in Gram Sabha Lodhvariya, Block Tiloi, District Amethi with a total length of 50 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320839
₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road in Village Pure Katariyan, from Mukhtar Ahmad's house up to the mosque, Gram Sabha Bhadmar, Block Tiloi, District Amethi with a total length of 50 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320840
₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from Akbari's house up to Sonu's house, in Gram Sabha Ashapur Ruru. Block Tiloi, District Amethi with a total length of 135 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320841
₹8.1 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road in the Village Dhanuha Pure Katariyan link road from Sukhram House up to the canal, in Gram Sabha Ashapur Gadi, Block Tiloi, District Amethi with a total length of 100 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320842
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from Farooqs house up to Bhondes house in Gram Sabha Mohna, Block Bahadurpur, District Amethi with a total length of 85 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320843
₹5.1 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from the paved road to Hafiz Aas Mohammad's house, in Gram Sabha Kotwarmau, Block Bahadurpur, District Amethi with a total length of 100 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320844
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from Dukhilal's house up to the Nahariya(Canal),in Gram Sabha Khalispur, Block Bahadurpur, District Amethi with a total length of 100 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320845
₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026Construction of an interlocking road from Shankar Ji's temple up to the house of Bhishma Narayan Srivastava, in Gram Sabha Udwa, Block Bahadurpur, District Amethi with a total length of 60 meters.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320846
₹3.6 L Awaiting sanction · 23 daysRec. 9 Oct 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.