Kishori Lal

Lok SabhaINCAmethi · Uttar Pradesh

MP score49/100373rd of 542 in the 18th Lok Sabha
64th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    69% of vendor payments went to AADI AND RUDRANSH CONSTRUCTION COMPANY.

Allocated limit

₹17.40 Cr

Median ₹14.70 Cr

Fund utilisation

86%

₹15.00 Cr recommended · 114 works
Above median (76%)

Paid to vendors

₹8.39 Cr

48% of allocation
Above median (37%)

Works completed

21

18% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP114 works

    ₹15.00 Cr · 86% of the ₹17.40 Cr allocated

  2. Sanctioned by the district47 works

    41% sanctioned · took 3.8 months on average (due within 45 days)

  3. Completed21 works

    ₹3.24 Cr final cost · 13.7 months from recommendation on average

67 works are still awaiting sanction, 7 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 114 works worth ₹15.00 Cr, a fund utilisation of 86%, higher than 67% of 18th Lok Sabha MPs.
  • The district has sanctioned 47 of them, taking 3.8 months on average.
  • ₹8.39 Cr has been paid to vendors, 48% of the allocation.
  • 21 works are complete, typically 13.7 months after recommendation. 21 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 16 vendors. The largest received 69%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 49/100: finishing works counts most

  1. Works completed 30%18Completed ÷ recommended works.
  2. Spending efficiency 20%39Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%86Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%48Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    38
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AADI AND RUDRANSH CONSTRUCTION COMPANY, 69% of payments across 16 vendors.

District sanction speed

86/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%86Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

115 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of an interlocking road on the Bhawanigarh Deeh Link Road, from the Ramlila Maidan to the Kutia of Vindhyasevak Baba, Block Baldirai, District Sultanpur, with a total length of 100 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320813

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road in Village Vishwanathpur from the house of Amar Bahadur Singh up to the Ram Janki Temple, Gram Sabha Uskamau, Block Baldirai, District Sultanpur, with a total length of 100 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320814

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road in Gram Sabha Hasai Mukundpur, from the house of Harun near the mosque up to the Government Tubewell, Block Baldirai, District Sultanpur, with a total length of 100 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sultanpur· #320815

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road Under Gram Sabha Sirsira, on the remaining portion from Ichhangoda Marg up to the primary school, Block Salon, District Raebareli, with a total length of 50 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320817

    ₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road Under Gram Sabha Paksarawan, from Khwajapur Marg to Paksarawan,Block Salon, District Raebareli, with a total length of 120 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320818

    ₹7.2 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from Pure Kalandar to Pure Sadhai in Gram Thauri, Block Deeh, District Raebareli, with a total length of 200 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320819

    ₹12.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road near Ramkishan's house up to the house of Jeevan Lal in Gram Sabha Dohari, Block Deeh, District Raebareli, with a total length of 125 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #320820

    ₹7.5 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from the Tiloi Inhauna road up to Sunita Singh's house in Gram Sabha Lodhvariya, Block Tiloi, District Amethi with a total length of 50 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320839

    ₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road in Village Pure Katariyan, from Mukhtar Ahmad's house up to the mosque, Gram Sabha Bhadmar, Block Tiloi, District Amethi with a total length of 50 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320840

    ₹3.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from Akbari's house up to Sonu's house, in Gram Sabha Ashapur Ruru. Block Tiloi, District Amethi with a total length of 135 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320841

    ₹8.1 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road in the Village Dhanuha Pure Katariyan link road from Sukhram House up to the canal, in Gram Sabha Ashapur Gadi, Block Tiloi, District Amethi with a total length of 100 meters

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320842

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from Farooqs house up to Bhondes house in Gram Sabha Mohna, Block Bahadurpur, District Amethi with a total length of 85 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320843

    ₹5.1 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from the paved road to Hafiz Aas Mohammad's house, in Gram Sabha Kotwarmau, Block Bahadurpur, District Amethi with a total length of 100 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320844

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from Dukhilal's house up to the Nahariya(Canal),in Gram Sabha Khalispur, Block Bahadurpur, District Amethi with a total length of 100 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320845

    ₹6.0 L Awaiting sanction · 23 daysRec. 9 Oct 2026
  • Construction of an interlocking road from Shankar Ji's temple up to the house of Bhishma Narayan Srivastava, in Gram Sabha Udwa, Block Bahadurpur, District Amethi with a total length of 60 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Amethi· #320846

    ₹3.6 L Awaiting sanction · 23 daysRec. 9 Oct 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.