Payments concentrated with one vendor
86% of vendor payments went to SRIJAN CONSTRUCTION.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
97%
₹14.19 Cr recommended · 108 works
Above median (76%)
Paid to vendors
₹9.51 Cr
65% of allocation
Above median (37%)
Works completed
33
31% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP108 works
₹14.19 Cr · 97% of the ₹14.70 Cr allocated
- Sanctioned by the district98 works
91% sanctioned · took 37 days on average (due within 45 days)
- Completed33 works
₹4.61 Cr final cost · 11.0 months from recommendation on average
10 works are still awaiting sanction, 10 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 108 works worth ₹14.19 Cr, a fund utilisation of 97%, higher than 86% of 18th Lok Sabha MPs.
- The district has sanctioned 98 of them, taking 37 days on average.
- ₹9.51 Cr has been paid to vendors, 65% of the allocation.
- 33 works are complete, typically 11.0 months after recommendation. 33 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 6 vendors. The largest received 86%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 57/100: finishing works counts most
- Works completed 30%31Completed ÷ recommended works.
- Spending efficiency 20%49Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%65Paid to vendors ÷ allocated limit.
- Vendor diversity 10%17How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SRIJAN CONSTRUCTION, 86% of payments across 6 vendors.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
108 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Sr.No 01 Interlocking work spanning a length of 325 meters, extending from Sundar Yadavs field in Kudarha (Gram Sabha Asratha), passing by Angnus house, and reaching the PWD road.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302618
₹17.2 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 02 Interlocking work over a length of 300 meters on the Barauli-Nanhu Chaubepurwa connecting road, starting from the Maa Barahi Banua main road, in Gram Sabha Barauli.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302619
₹15.8 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 03 Interlocking work spanning a length of 230 meters from the unpaved road to Sitasharan Mishras house in Atibalpurwa, Gram Sabha Kindhaura.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302620
₹12.2 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 04 Interlocking work spanning a length of 250 meters from Ram Dayals house to the Composite Primary School in Gram Panchayat Rampur Kharhata.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302621
₹13.2 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 05 Interlocking work spanning a length of 300 meters in Gram Sabha Paraspatti Purwar, extending from Banshi Yadavs house (Vishva Bank) to the Hariram Mairwa Baba shrine.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302622
₹15.9 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 06 Interlocking work spanning a length of 250 meters in Gram Sabha Sakipur, extending from Bale Yadavs house to Angad Yadavs house via Jagdamba Yadavs house.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302623
₹13.3 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 07 Interlocking work spanning a length of 125 meters in Gram Sabha Raghunathpur, from the house of Sambhupurva Bhagwati Mishra to the house of Diwakar Mishra.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302625
₹6.6 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 08 Interlocking work spanning a length of 100 meters from Ram Biharis house to Chamaran Tola in Gram Sabha Semra Sheikhpur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302626
₹5.3 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr. No 09 Interlocking work spanning a length of 200 meters in Gram Sabha Semra Sheikhpur, extending from Matadins field to Budhrams field along the paved road.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302627
₹10.5 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 10 Interlocking work over a length of 300 meters from Bagiyapurwa to Kangali Bagiya in Gram Sabha Lauvvavirpur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302628
₹15.7 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 11 Interlocking work over a length of 200 meters from the Tulsipur Dhemwaghat road to Ram Prakash Singhs house in Gram Sabha Tulsipur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302629
₹8.7 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 12 Interlocking work over a length of 220 meters at Katra Pathakpurwa on the Gram Panchayat Chaukhadiya-Dhemwaghat road.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302630
₹11.5 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 13 Construction of a CC road, including a culvert and approach, to the west of Rakesh Pandeys field in Gram Sabha Devarda.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302631
₹11.7 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 14 Interlocking work over a length of 100 meters in Gram Sabha Paras Patti Majhwar, extending from the paved road to Dinesh Singhs house via Atul Singhs house.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302632
₹5.3 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026Sr.No 15 Interlocking work spanning a length of 325 meters in Gram Sabha Paraspatti Purwar, from the Amdahi-Bahadurpur road to Sushil Babas Madha.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gonda· #302633
₹17.3 L Sanctioned · 2 Sept 2026Rec. 13 Aug 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.