Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Iqra Choudhary

Lok SabhaSPKairana · Uttar Pradesh

MP score65/100150th of 542 in the 18th Lok Sabha
32nd of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

61%

₹8.90 Cr recommended · 106 works
Below median (76%)

Paid to vendors

₹5.62 Cr

38% of allocation
About the median

Works completed

55

52% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP106 works

    ₹8.90 Cr · 61% of the ₹14.70 Cr allocated

  2. Sanctioned by the district84 works

    79% sanctioned · took 54 days on average (due within 45 days)

  3. Completed55 works

    ₹4.31 Cr final cost · 9.5 months from recommendation on average

22 works are still awaiting sanction, 8 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 106 works worth ₹8.90 Cr, a fund utilisation of 61%, higher than 24% of 18th Lok Sabha MPs.
  • The district has sanctioned 84 of them, taking 54 days on average.
  • ₹5.62 Cr has been paid to vendors, 38% of the allocation.
  • 55 works are complete, typically 9.5 months after recommendation. 50 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 9 vendors. The largest received 38%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 65/100: finishing works counts most

  1. Works completed 30%52Completed ÷ recommended works.
  2. Spending efficiency 20%77Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%61Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%91Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%38Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    77
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: M S TRADERS, 38% of payments across 9 vendors.

District sanction speed

95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

106 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • gram gandrav me jinda hasan ki bethak se akhtar pradhan ke makan se hote hue dumanjili masjid tak cc road nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Shamli· #296354

    ₹24.2 L Vendor Identification · 29 Sept 2026Rec. 17 Jul 2026Paid ₹24.1 L
  • gram bunta me badi masjid se sabbir ke makan tak interlocking nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Shamli· #296366

    ₹9.2 L Vendor Identification · 29 Sept 2026Rec. 17 Jul 2026Paid ₹8.8 L
  • GRAM DHAULAPARA ME KHURSHEED KE MAKAN SE KHOOP CHAND KE MAKAN TAK CC ROAD VAI NALI NIRMAN KARYA 80 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299849

    ₹5.8 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM MALAKPUR ME AKARM KE MAKAN SE MURSLEEM KE MAKAN KE OR CC ROAD VAI NALI NIRMAN KARYA 150 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299850

    ₹13.1 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM AURANGZEBPUR ME MASZID SE MAIN ROAD TAK CC ROAD VAI NALI NIRMAN KARYA 40 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299872

    ₹3.5 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM RAWANPUR BUZURG KE MAZRA BAHAADRA ME MAIN ROAD SE KABRISTAAN TAK CC ROAD NIRMAN KARYA 45 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299873

    ₹2.3 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM KATLA KA MAZRA MARODGARH ME PRATHMIK VIDHAYALYA SE ZAKIR KE MAKAN TAK VAI SHEED KE MAKAN SE HAZI MAHBOOB KE MAKAN TAK CC ROAD VAI NALI NIRMAN KARYA 130 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299874

    ₹8.5 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM PARAGPUR ME CHOTI MASZID SE ABDURRAHMAN KE GHAR TAK CC ROAD VAI NALI NIRAM KARYA 90 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299875

    ₹6.4 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM AGWANHERA ME YAMEEN KE BAITHAK SE ZAKIR KE DUKAN TAK CC ROAD VAI NALI NIRMAN KARYA 83 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299876

    ₹5.4 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • GRAM NAYA GAON ME SARSWATI GYAN KALASH VIDHYA MANDIR SE KHURSHEED KE GHER TAK CC ROAD VAI NALI NIRMAN KARYA 90 MTR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #299877

    ₹7.6 L Sanctioned · 23 Sept 2026Rec. 25 Aug 2026
  • Gram Quan khera me shamshan Ghat me shavdhah grah nirman karye. 6.00x6.00mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #315321

    ₹6.5 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Gram Thaska me Kanwarpla ke makan se shamshan ghat tak mitti khadanja vai nali nirman karye. 205mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #315322

    ₹10.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Gram Kalsi me Transformer se mahaksingh ke Ghar tak cc road vai nali nirman karye. 95mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #315323

    ₹6.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Gram Randheri me Bijendra ke Gher se Nakliram ke makan se hote hue suderpal ke makan ki or cc road vai nali nirman karye. 90Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #315324

    ₹8.3 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Gram Daulatpur me Qayyum ke makan se tower ki or cc road nirman karye. 120mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #315325

    ₹9.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.