Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Imran Masood

Lok SabhaINCSaharanpur · Uttar Pradesh

MP score64/100162nd of 542 in the 18th Lok Sabha
34th of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

68%

₹10.04 Cr recommended · 115 works
Below median (76%)

Paid to vendors

₹7.99 Cr

54% of allocation
Above median (37%)

Works completed

51

44% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP115 works

    ₹10.04 Cr · 68% of the ₹14.70 Cr allocated

  2. Sanctioned by the district115 works

    100% sanctioned · took 24 days on average (due within 45 days)

  3. Completed51 works

    ₹4.21 Cr final cost · 8.0 months from recommendation on average

In plain words

What the numbers say

  • Recommended 115 works worth ₹10.04 Cr, a fund utilisation of 68%, higher than 38% of 18th Lok Sabha MPs.
  • The district has sanctioned 115 of them, taking 24 days on average.
  • ₹7.99 Cr has been paid to vendors, 54% of the allocation.
  • 51 works are complete, typically 8.0 months after recommendation. 50 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 14 vendors. The largest received 18%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 64/100: finishing works counts most

  1. Works completed 30%44Completed ÷ recommended works.
  2. Spending efficiency 20%53Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%68Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%98Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%54Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AHTESHAM CONTRACTOR, 18% of payments across 14 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

115 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Gram Sherpur Pelon me Mitthu ki Baithak se Mustkeem ke Makan tak CC Road vai Nali Nirman karye 75 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309589

    ₹6.4 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Salempur Gada me main Road se Mustkeem ke Makan tak CC Road vai Nali Nirman karye 130 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309590

    ₹5.5 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Khedi Ahatmal ka Majra Dabha khedi me asraf ke makan se akhtar ke makan tak CC Road vai Nali Nirman karye 95 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309591

    ₹6.1 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Nasratpur me Dheer singh ke makan se ramkumar ke makan tak CC Road vai Nali Nirman karye 80 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309592

    ₹5.2 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Bhaupur me Gulzar ke makan se waseem ke farm ki or CC Road vai Nali Nirman karye 205 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309593

    ₹15.0 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Gagalheri me muntzeer ke dukan se Zinda ke makan tak CC Road vai Nali Nirman karye 135 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309594

    ₹8.5 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Manani me main road highway se Shamshan Ghat ke or CC Road Nirman karye 110 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309595

    ₹8.9 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Redi mohiddinpur me Naseem ke makan se mohto wali Masjid tak CC Road vai Nali Nirman karye 190 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309596

    ₹13.1 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Kendki me pappu ke makan se akram ke makan ki or CC Road vai Nali Nirman karye 170 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309597

    ₹12.7 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Sakatpur me haripal ke makan se mansingh ke makan tak CC Road vai Nali Nirman karye 230 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309598

    ₹16.6 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Datoli ranghad me ramkumar ke dukan se vinod sharma ke makan se hote hue ek sambhandhit gali shahit ravikant sharma ke makan tak CC Road vai Nali Nirman karye 185 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309599

    ₹12.7 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Gram Shajawa me kanwarsingh ke ghar se rajendra ke ghar ki or CC Road vai Nali Nirman karye 40 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309600

    ₹1.2 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • Ward 13 Nagar palika Devband ke Mohh khankhah me irfan ke makan purani cc se ushuf masjid ke or CC Road vai Nali Nirman karye 150 Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #309601

    ₹19.6 L Sanctioned · 23 Sept 2026Rec. 29 Aug 2026
  • ward 31 Garam khatri wala prathmik vidhyalye ke gate se ashok ke makan tak cc road via nali nirman karye. 70 meter

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #276389

    ₹4.6 L Sanctioned · 23 May 2026Rec. 27 Mar 2026
  • ward 32 Khanaalampura me suleman waqeel ke makan se ayyub ke makan vai shajad ke makan tak cc road vai nali nirman karye. 110 meter

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Saharanpur· #276390

    ₹8.0 L Sanctioned · 23 May 2026Rec. 27 Mar 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.