Harendra Singh Malik

Lok SabhaSPMuzaffarnagar · Uttar Pradesh

MP score51/100340th of 542 in the 18th Lok Sabha
61st of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

92%

₹13.50 Cr recommended · 276 works
Above median (76%)

Paid to vendors

₹5.24 Cr

36% of allocation
About the median

Works completed

32

12% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP276 works

    ₹13.50 Cr · 92% of the ₹14.70 Cr allocated

  2. Sanctioned by the district125 works

    45% sanctioned · took 5.7 months on average (due within 45 days)

  3. Completed32 works

    ₹1.95 Cr final cost · 12.8 months from recommendation on average

151 works are still awaiting sanction, 99 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 276 works worth ₹13.50 Cr, a fund utilisation of 92%, higher than 77% of 18th Lok Sabha MPs.
  • The district has sanctioned 125 of them, taking 5.7 months on average.
  • ₹5.24 Cr has been paid to vendors, 36% of the allocation.
  • 32 works are complete, typically 12.8 months after recommendation. 29 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 20 vendors. The largest received 24%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 51/100: finishing works counts most

  1. Works completed 30%12Completed ÷ recommended works.
  2. Spending efficiency 20%37Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%92Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%91Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%36Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    95
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: A P DEVELOPERS, 24% of payments across 20 vendors.

District sanction speed

62/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%62Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

276 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Gurudwara Ke pas Interlocking Length 12mt Width 16 mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324989

    ₹1.2 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Bhoomiya Kheda Me Interlocking Road Length 40mt Width 26Mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324990

    ₹3.5 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Main Road Se Omkar singh ke Makan tak CC Road Length 42mt Width 450 cms

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324991

    ₹2.3 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Waris Tyagi ke Ghar Se Sanawwar ke Ghar tak Khadanja 100mt Width 4 mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324992

    ₹2.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Taz Mohammad Ke Ghar Se Yameen Nai ke Ghar tak CC Road Length 100mt Width 4mt

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324993

    ₹4.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Muhammed Salim Ke Makaan se Sarafat Ke Makan tak 50mt Khadanja

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324531

    ₹65,000 Awaiting sanction · 6 daysRec. 26 Oct 2026
  • Subrati Ke Makan se Kanya Pathshala tak Lagbhag 100mt Khadanja Nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #324532

    ₹1.3 L Awaiting sanction · 6 daysRec. 26 Oct 2026
  • Vir Singh ki Tyubewell se Upender ke Khet tak 900Mt khadanja

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324533

    ₹10.0 L Awaiting sanction · 6 daysRec. 26 Oct 2026
  • Iqbal Ki Dukan Se Vikki ke Gher Tak Lagabhag 200Mt Length ki CC Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324007

    ₹13.5 L Awaiting sanction · 8 daysRec. 24 Oct 2026
  • Purane Pul se Sarkari Nal tak 50Mt Khadanja Nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324368

    ₹65,000 Awaiting sanction · 8 daysRec. 24 Oct 2026
  • School se Sheeshpal Ke Makan tak 70Mt length aur 13 Feet Chaudai ki Interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324369

    ₹3.5 L Awaiting sanction · 8 daysRec. 24 Oct 2026
  • Paramjeet ke Ghar Se Subhash Amit ke Ghar Tak CC 101mt aur Chaudai 550cm

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324370

    ₹8.3 L Awaiting sanction · 8 daysRec. 24 Oct 2026
  • Budina Kalan Atali Sampark Marg Se Bijlighar se budina Kalan Shamsan Ghaat 100Mt Khadanja

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #324409

    ₹1.8 L Awaiting sanction · 8 daysRec. 24 Oct 2026
  • Gram Kurawa me Mohammadpur Marg se Bijli ke Tyubewell Tak 200Meter Khadanja Marg

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #250027

    ₹4.1 L Vendor Identification · 21 Oct 2026Rec. 22 Nov 2025Paid ₹2.5 L
  • Kallu Pradhan Ke Makan se Umar Jaan Ke Makan tak lagabhag 120 meter naali

    Sanitation & drainageProviding drains and gutters for public drainage· Muzaffarnagar· #231926

    ₹2.0 L Awaiting sanction · 13 daysRec. 19 Oct 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.