This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Gyaneshwar Patil

Lok SabhaKhandwa · Madhya Pradesh

MP score84/100276th of 539 in the 17th Lok Sabha
9th of 29 from Madhya Pradesh
Re-elected to the 18th Lok Sabha Then: 87% utilisation, 233 works completed, score 73.
  • Payments concentrated with one vendor

    77% of vendor payments went to KPL Equipments Pvt Ltd bhopal mp.

Allocated limit

₹6.98 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹6.91 Cr recommended · 169 works
About the median

Paid to vendors

₹6.56 Cr

94% of allocation
Above median (88%)

Works completed

140

83% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP169 works

    ₹6.91 Cr · 99% of the ₹6.98 Cr allocated

  2. Sanctioned by the district166 works

    98% sanctioned · took 4.3 months on average (due within 45 days)

  3. Completed140 works

    ₹5.88 Cr final cost · 8.7 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 169 works worth ₹6.91 Cr, a fund utilisation of 99%, higher than 60% of 17th Lok Sabha MPs.
  • The district has sanctioned 166 of them, taking 4.3 months on average.
  • ₹6.56 Cr has been paid to vendors, 94% of the allocation.
  • 140 works are complete, typically 8.7 months after recommendation. 135 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 49 vendors. The largest received 77%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 84/100: finishing works counts most

  1. Works completed 30%83Completed ÷ recommended works.
  2. Spending efficiency 20%89Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%94Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    29
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: KPL Equipments Pvt Ltd bhopal mp, 77% of payments across 49 vendors.

District sanction speed

86/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%86Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

169 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Extension work of motor pump pipe line for drinking water in village Sahejla

    Drinking waterProviding supply pipelines for drinking water· Khandwa· #249447

    ₹50,000 Sanctioned · 13 May 2026Rec. 31 Jul 2023
  • gram panchyat - netangaon janpad panchayat - punasa mai shree ram mandir ke pas 2 kilo watt off grid solar power plant instalation work

    Electricity & lightingSetting up public non-conventional energy plants· Khandwa· #107094

    ₹2.5 L Completed 23 Apr 2026Rec. 16 Feb 2024Paid ₹2.5 L
  • Construction of community hall for public use in Bhilal Darbar locality, village Kelvakhurd

    Community buildings & public spacesConstruction of community centers and community halls· Khandwa· #249453

    ₹2.0 L Completed 23 Apr 2026Rec. 31 Jul 2023Paid ₹2.0 L
  • Pipeline extension work for drinking water in village Barud

    Drinking waterProviding supply pipelines for drinking water· Khandwa· #249451

    ₹2.0 L Vendor Identification · 15 Apr 2026Rec. 31 Jul 2023Paid ₹2.0 L
  • Construction of platform shed for public use in village Bhuifal

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Khandwa· #249474

    ₹90,000 Sanctioned · 15 Apr 2026Rec. 31 Jul 2023
  • Construction of platform shed for public use near Abhimanyu house in village Kaldakhedi

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Khandwa· #249475

    ₹92,000 Vendor Identification · 25 Feb 2026Rec. 31 Jul 2023Paid ₹92,000
  • Construction of platform shed for public use Ward No. 47 Rameshwar Ward near Balli Mishra house Khandwa

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Khandwa· #249465

    ₹50,000 Sanctioned · 28 Jan 2026Rec. 31 Jul 2023
  • Construction of platform shed for public use Ward No. 47 Rameshwar Ward Sethi Nagar Khandwa

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Khandwa· #249469

    ₹50,000 Sanctioned · 28 Jan 2026Rec. 31 Jul 2023
  • Construction work of platform with shed for public use near Navgrah Hanuman Temple Chirakhadan Ward No. 7 Khandwa

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Khandwa· #249471

    ₹50,000 Sanctioned · 28 Jan 2026Rec. 31 Jul 2023
  • gram panchayat hasnapur janpad panchayat burhanpur mai rcc shed construction work

    Community buildings & public spacesConstruction of community centers and community halls· Burhanpur· #31220

    ₹2.5 L Completed 27 Jan 2026Rec. 4 Oct 2023Paid ₹2.5 L
  • gram panchyat - fatepur janpad panchyat - burhanpur mai rokadiya hanuman mandir ke pas pewar block or sondariyakaran ka karya

    Roads & bridgesConstruction of footpaths and pedestrian ways· Burhanpur· #107081

    ₹5.0 L Completed 27 Jan 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • gram panchyat - badel, janpad panchayat - khargone ke sirvi mohhle mai Construction of buildings for community cultural activities

    Community buildings & public spacesConstruction of buildings for community cultural activities· Khargone· #107188

    ₹5.0 L Completed 17 Nov 2025Rec. 16 Feb 2024Paid ₹5.0 L
  • gram panchyat - borsar janpad panchayt - burhanpur mai bitthal mandir ke pas Construction of common work sheds/ common covered sitting area

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Burhanpur· #102869

    ₹7.0 L Completed 14 Nov 2025Rec. 11 Feb 2024Paid ₹7.0 L
  • gram panchyat - adagaon janpad panchayat burhanpur mai 07 solar street light instalation work

    Electricity & lightingStreet lights· Burhanpur· #99900

    ₹0 Completed 30 Oct 2025Rec. 7 Feb 2024
  • gram panchyat - basad janpad panchayat burhanpur mai 05 solar street light instalation work

    Electricity & lightingStreet lights· Burhanpur· #99901

    ₹0 Completed 30 Oct 2025Rec. 7 Feb 2024

17th Lok Sabha MPs from Madhya Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shankar Lalwani · Indore97%97%20196
2Smt Riti Pathak · Sidhi100%100%3094
3Chhatar Singh Darbar · Dhar97%97%39894
4Dhal Singh Bisen · Balaghat100%100%30390
5Vishnu Dutt Sharma · Khajuraho100%91%10688
6Smt Himadri Singh · Shahdol100%99%31588
7Shri Anil Firojiya · Ujjain97%95%21888
8Rajbahadur Singh · Sagar100%96%15485
9Gyaneshwar Patil · Khandwa99%94%14084
10Smt Sandhya Ray · Bhind99%95%16384
11Nakul K Nath · Chhindwara99%85%50483
12Prahlad Singh Patel · Damoh99%86%15283

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.