Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Smt Sandhya Ray

Lok SabhaSC seatBhind · Madhya Pradesh

MP score84/100294th of 539 in the 17th Lok Sabha
10th of 29 from Madhya Pradesh
Re-elected to the 18th Lok Sabha Then: 38% utilisation, 61 works completed, score 51.
  • Payments concentrated with one vendor

    65% of vendor payments went to MP STATE AGRO INDUSTRIES DEV CORP LTD.

Allocated limit

₹6.91 Cr

Median ₹8.60 Cr

Fund utilisation

99%

₹6.84 Cr recommended · 218 works
About the median

Paid to vendors

₹6.54 Cr

95% of allocation
Above median (88%)

Works completed

163

75% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP218 works

    ₹6.84 Cr · 99% of the ₹6.91 Cr allocated

  2. Sanctioned by the district215 works

    99% sanctioned · took 11.9 months on average (due within 45 days)

  3. Completed163 works

    ₹5.74 Cr final cost · 13.6 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 218 works worth ₹6.84 Cr, a fund utilisation of 99%, higher than 60% of 17th Lok Sabha MPs.
  • The district has sanctioned 215 of them, taking 11.9 months on average.
  • ₹6.54 Cr has been paid to vendors, 95% of the allocation.
  • 163 works are complete, typically 13.6 months after recommendation. 161 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Sanitation & drainage.
  • Payments went to 41 vendors. The largest received 65%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 84/100: finishing works counts most

  1. Works completed 30%75Completed ÷ recommended works.
  2. Spending efficiency 20%88Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%95Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    44
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MP STATE AGRO INDUSTRIES DEV CORP LTD, 65% of payments across 41 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

218 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Boundary wall construction work from Radhakrishna Temple to Chillasan Mata Temple at Village and Village Panchayat Bhaunpura Janpad Panchayat Gohad

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bhind· #211871

    ₹43,146 Completed 16 Apr 2026Rec. 25 Sep 2023Paid ₹43,146
  • Boundary wall construction work from Main Gate towards Khatu Shyam Mandir and Village Panchayat Bhaunpura Janpad Panchayat Gohad

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bhind· #211872

    ₹37,950 Completed 16 Apr 2026Rec. 25 Sep 2023Paid ₹37,950
  • Boundary wall construction work from Mata Mandir towards Baba place, Village Pandit. Bhaunpura Janpad Panchayat Gohad

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Bhind· #211873

    ₹43,608 Completed 16 Apr 2026Rec. 25 Sep 2023Paid ₹43,608
  • CC Road construction work from in front of Mangal Bhawan towards Sai Sarovar, Gram Panchayat. Tejpura Janpad Panchayat mehgaon

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #214315

    ₹44,800 Completed 15 Apr 2026Rec. 25 Sep 2023Paid ₹44,800
  • CC Road construction work from SAI campus towards Ramsia Jatav shop at Village Pandit. Tejpura Janpad Panchayat mehgaon

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #214316

    ₹44,511 Completed 15 Apr 2026Rec. 25 Sep 2023Paid ₹44,511
  • CC Road construction work from Jawan Singh door towards Sai Mandir village and Gram Pandit. Tejpura Janpad Panchayat mehgaon

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #214317

    ₹44,914 Completed 15 Apr 2026Rec. 25 Sep 2023Paid ₹44,914
  • Gram Panchayat EtaharTeh. Construction of Woundriwal of Muktidham in Ater District Bhind.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Bhind· #92116

    ₹2.5 L Completed 9 Apr 2026Rec. 30 Jan 2024Paid ₹2.5 L
  • CC Road construction work from Patel Dixit door to Shri Rajaram Dixit door Pali Janpad Panchayat ater

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #211839

    ₹47,068 Completed 24 Feb 2026Rec. 25 Sep 2023Paid ₹47,068
  • CC Road construction work is going from the door of Shri Rajaram Dixit near the house of Shri Suresh Dhobi Village and Panchayt Pali Janpad Panchayat ater

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #211840

    ₹47,383 Completed 24 Feb 2026Rec. 25 Sep 2023Paid ₹47,383
  • CC Road construction work from Suresh Dhobhi door towards Pachira Main Road Village and Panchayat Pali Janpad Panchayat ater

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #211841

    ₹23,795 Completed 24 Feb 2026Rec. 25 Sep 2023Paid ₹23,795
  • From Gauri Singh's House towards Shankar ji's Bhavan in village Amayan tehsil Menhgaon.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhind· #31399

    ₹2.5 L Completed 16 Feb 2026Rec. 4 Oct 2023Paid ₹2.5 L
  • Gram Panchayat Didauna Teh. Beautification and construction of Muktidham for public convenience in Roan

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Bhind· #76335

    ₹2.5 L Vendor Identification · 16 Feb 2026Rec. 6 Jan 2024Paid ₹2.5 L
  • Hand pump mining construction work near the house of Shri Dilip Joshi Village and Village Panchayat Garhi Janpad Panchayat mehgaon

    Drinking waterInstalling hand pumps· Bhind· #211826

    ₹25,000 Sanctioned · 3 Feb 2026Rec. 25 Sep 2023
  • Hand pump mining construction work near Mr Baseer Khan house in village and Gram Panchayat Garhi Janpad Panchayat mehgaon

    Drinking waterInstalling hand pumps· Bhind· #211827

    ₹25,000 Sanctioned · 3 Feb 2026Rec. 25 Sep 2023
  • Hand pump mining construction work near the house of Shri Ramhet Singh Pura Gram Panchayat of village Gyanendra Garhi Janpad Panchayat mehgaon

    Drinking waterInstalling hand pumps· Bhind· #211828

    ₹25,000 Sanctioned · 3 Feb 2026Rec. 25 Sep 2023

17th Lok Sabha MPs from Madhya Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shankar Lalwani · Indore97%97%20196
2Smt Riti Pathak · Sidhi100%100%3094
3Chhatar Singh Darbar · Dhar97%97%39894
4Dhal Singh Bisen · Balaghat100%100%30390
5Vishnu Dutt Sharma · Khajuraho100%91%10688
6Smt Himadri Singh · Shahdol100%99%31588
7Shri Anil Firojiya · Ujjain97%95%21888
8Rajbahadur Singh · Sagar100%96%15485
9Gyaneshwar Patil · Khandwa99%94%14084
10Smt Sandhya Ray · Bhind99%95%16384
11Nakul K Nath · Chhindwara99%85%50483
12Prahlad Singh Patel · Damoh99%86%15283

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.