Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Anil Firojiya

Lok SabhaSC seatUjjain · Madhya Pradesh

MP score88/100207th of 539 in the 17th Lok Sabha
7th of 29 from Madhya Pradesh
Re-elected to the 18th Lok Sabha Then: 68% utilisation, 160 works completed, score 71.

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

97%

₹7.17 Cr recommended · 262 works
About the median

Paid to vendors

₹7.02 Cr

95% of allocation
Above median (88%)

Works completed

218

83% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP262 works

    ₹7.17 Cr · 97% of the ₹7.36 Cr allocated

  2. Sanctioned by the district262 works

    100% sanctioned · took 3.6 months on average (due within 45 days)

  3. Completed218 works

    ₹5.20 Cr final cost · 12.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 262 works worth ₹7.17 Cr, a fund utilisation of 97%, higher than 46% of 17th Lok Sabha MPs.
  • The district has sanctioned 262 of them, taking 3.6 months on average.
  • ₹7.02 Cr has been paid to vendors, 95% of the allocation.
  • 218 works are complete, typically 12.9 months after recommendation. 203 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 133 vendors. The largest received 9.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 88/100: finishing works counts most

  1. Works completed 30%83Completed ÷ recommended works.
  2. Spending efficiency 20%74Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%93Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%95Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: G V INDUSTRIES, 9.2% of payments across 133 vendors.

District sanction speed

90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

262 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • gram sarola me muktidham parisar baundriwall

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ujjain· #120009

    ₹5.0 L Completed 3 Sept 2026Rec. 4 Mar 2024Paid ₹5.0 L
  • gram bhundkhedi me puliya se premsingh ke ghar ki aur cement concrit work second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #19957

    ₹1.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹1.5 L
  • gram noganwa me shamshan shed second installment

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ujjain· #19958

    ₹1.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹1.5 L
  • gram kapeli main road per sanskrutik bhawan second installment

    Community buildings & public spacesConstruction of buildings for community cultural activities· Ujjain· #19959

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram suwagaon me bansilal ke makan se kalusingh ke makan ki aur cement concrit work second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #19968

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram kheda jamuniya sanskrutik bhawan ke samne main road ke pass puliya nirman second installment

    Roads & bridgesConstruction of culverts and bridges· Ujjain· #19969

    ₹1.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹1.5 L
  • gram hasalpur jhirnya me ratanlal ke ghar ke pass sthai shed second installment

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ujjain· #20171

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram umarajhar kalusingh ke ghar se darbarsingh ke ghar ki aur cement concrit work second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20172

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram samgi me shamshan sthal per boundriwall second installment

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ujjain· #20174

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram shekhpur me lakhansingh ke ghar se badrilal ke ghar ki aur cement concrit work second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20175

    ₹1.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹1.5 L
  • gram lalakheda me pappu ke ghar se sandeep ke ghar ki aur cement concrit work second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20176

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram kadhai me sarvajanik parivahan se yatriyo ke liye sthai shed second installment

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Ujjain· #20177

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram limbadit me jairam ji ke phatak se govt.kua ki aur cement concrit road and nali second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20178

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L
  • gram khatikhedi sc basti me cement concrit road second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20180

    ₹1.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹1.5 L
  • gram kankaryamirpur me cc road and nali nanuram ke ghar se hindusingh ke ghar ki aur gp hasalpur jhirnya second installment

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #20181

    ₹2.5 L Completed 22 Apr 2026Rec. 14 Sep 2023Paid ₹2.5 L

17th Lok Sabha MPs from Madhya Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shankar Lalwani · Indore97%97%20196
2Smt Riti Pathak · Sidhi100%100%3094
3Chhatar Singh Darbar · Dhar97%97%39894
4Dhal Singh Bisen · Balaghat100%100%30390
5Vishnu Dutt Sharma · Khajuraho100%91%10688
6Smt Himadri Singh · Shahdol100%99%31588
7Shri Anil Firojiya · Ujjain97%95%21888
8Rajbahadur Singh · Sagar100%96%15485
9Gyaneshwar Patil · Khandwa99%94%14084
10Smt Sandhya Ray · Bhind99%95%16384
11Nakul K Nath · Chhindwara99%85%50483
12Prahlad Singh Patel · Damoh99%86%15283

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.