Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Rajbahadur Singh

Lok SabhaSagar · Madhya Pradesh

MP score85/100261st of 539 in the 17th Lok Sabha
8th of 29 from Madhya Pradesh

Allocated limit

₹10.09 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹10.09 Cr recommended · 214 works
About the median

Paid to vendors

₹9.72 Cr

96% of allocation
Above median (88%)

Works completed

154

72% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP214 works

    ₹10.09 Cr · 100% of the ₹10.09 Cr allocated

  2. Sanctioned by the district199 works

    93% sanctioned · took 2.8 months on average (due within 45 days)

  3. Completed154 works

    ₹8.12 Cr final cost · 16.5 months from recommendation on average

15 works are still awaiting sanction, 15 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 214 works worth ₹10.09 Cr, a fund utilisation of 100%, higher than 86% of 17th Lok Sabha MPs.
  • The district has sanctioned 199 of them, taking 2.8 months on average.
  • ₹9.72 Cr has been paid to vendors, 96% of the allocation.
  • 154 works are complete, typically 16.5 months after recommendation. 133 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 154 vendors. The largest received 11%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 85/100: finishing works counts most

  1. Works completed 30%72Completed ÷ recommended works.
  2. Spending efficiency 20%84Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%83Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%96Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MAHALAXMI INDUSTRIES, 11% of payments across 154 vendors.

District sanction speed

90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

220 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Gravel Road Nirman kary- Kannakhedi se Adiwasi Basti tak gram panchayat devpura

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sagar· #230176

    ₹2.5 L Physical Inspection · 1 Sept 2026Rec. 16 Jan 2024Paid ₹2.5 L
  • Gravel Road Nirman kary- rajaowa noniya PMGSY road se Lidhora tenk tak gram panchayat Samaspur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sagar· #230184

    ₹2.0 L Physical Inspection · 1 Sept 2026Rec. 16 Jan 2024Paid ₹2.0 L
  • CC road nirman kary- hemnat kotwar ke ghar se nannhi bua yadav ke ghar ki or gram panchayat Ratona

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sagar· #230201

    ₹62,339 Completed 27 Aug 2026Rec. 16 Jan 2024Paid ₹62,339
  • Construction of CC Road in Vullage Dhirgarh

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Vidisha· #231468

    ₹1.3 L Sanctioned · 19 Jun 2026Rec. 16 Jan 2024
  • PIPAL KE PED KE PASS SURESH DEVIDEEN VISHKARMA KE SAMNE

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sagar· #121687

    ₹1.0 L Sanctioned · 18 May 2026Rec. 10 Mar 2024
  • BEL KE PED KE PASS DEVI PRASHAD LADIYA KE SAMNE

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sagar· #121688

    ₹1.0 L Sanctioned · 18 May 2026Rec. 10 Mar 2024
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPICITY 5000 LITER WITH FIRE FIGHTING PUMP AND 900X16 NEW TYRES AS PER LIST ATTACHED -VILLAGE KHAJURIYA ,HINGTI

    Drinking waterPurchase of mobile water tankers· Sagar· #98490

    ₹4.0 L Completed 23 Apr 2026Rec. 6 Feb 2024Paid ₹4.0 L
  • SAMSAN GHAT (KHER MATA) SE RAMRAJ THAKUR KE GHAR KI AUR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sagar· #113535

    ₹2.0 L Completed 23 Apr 2026Rec. 23 Feb 2024Paid ₹2.0 L
  • Purchase of mobile water tankers AS PER LIST ATTACHED

    Drinking waterPurchase of mobile water tankers· Sagar· #119462

    ₹2.0 L Completed 23 Apr 2026Rec. 3 Mar 2024Paid ₹2.0 L
  • Purchase of mobile water tankers AS PER LIST ATTACHED

    Drinking waterPurchase of mobile water tankers· Sagar· #119463

    ₹2.0 L Completed 23 Apr 2026Rec. 3 Mar 2024Paid ₹2.0 L
  • Purchase of mobile water tankers AS PER LIST ATTACHED

    Drinking waterPurchase of mobile water tankers· Sagar· #119464

    ₹2.0 L Completed 23 Apr 2026Rec. 3 Mar 2024Paid ₹2.0 L
  • Purchase of mobile water tankers AS PER LIST ATTACHED

    Drinking waterPurchase of mobile water tankers· Sagar· #119465

    ₹2.0 L Completed 23 Apr 2026Rec. 3 Mar 2024Paid ₹2.0 L
  • Purchase of mobile water tankers AS PER LIST ATTACHED

    Drinking waterPurchase of mobile water tankers· Sagar· #119461

    ₹2.0 L Completed 22 Apr 2026Rec. 3 Mar 2024Paid ₹2.0 L
  • MAIN ROAD SE NARENDRA RAI KE MAKAN KI AUR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sagar· #112453

    ₹2.0 L Completed 13 Mar 2026Rec. 23 Feb 2024Paid ₹2.0 L
  • RAMLALA PRAJAPATI KE GHAR KE PASS

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sagar· #112457

    ₹3.0 L Completed 13 Mar 2026Rec. 23 Feb 2024Paid ₹3.0 L

17th Lok Sabha MPs from Madhya Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shankar Lalwani · Indore97%97%20196
2Smt Riti Pathak · Sidhi100%100%3094
3Chhatar Singh Darbar · Dhar97%97%39894
4Dhal Singh Bisen · Balaghat100%100%30390
5Vishnu Dutt Sharma · Khajuraho100%91%10688
6Smt Himadri Singh · Shahdol100%99%31588
7Shri Anil Firojiya · Ujjain97%95%21888
8Rajbahadur Singh · Sagar100%96%15485
9Gyaneshwar Patil · Khandwa99%94%14084
10Smt Sandhya Ray · Bhind99%95%16384
11Nakul K Nath · Chhindwara99%85%50483
12Prahlad Singh Patel · Damoh99%86%15283

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.