Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Chandan Chauhan

Lok SabhaRLDBijnor · Uttar Pradesh

MP score41/100444th of 542 in the 18th Lok Sabha
69th of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

84%

₹12.37 Cr recommended · 140 works
Above median (76%)

Paid to vendors

₹8.22 Cr

56% of allocation
Above median (37%)

Works completed

15

11% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP140 works

    ₹12.37 Cr · 84% of the ₹14.70 Cr allocated

  2. Sanctioned by the district110 works

    79% sanctioned · took 5.1 months on average (due within 45 days)

  3. Completed15 works

    ₹1.20 Cr final cost · 10.1 months from recommendation on average

30 works are still awaiting sanction, 19 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 140 works worth ₹12.37 Cr, a fund utilisation of 84%, higher than 64% of 18th Lok Sabha MPs.
  • The district has sanctioned 110 of them, taking 5.1 months on average.
  • ₹8.22 Cr has been paid to vendors, 56% of the allocation.
  • 15 works are complete, typically 10.1 months after recommendation. 7 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 24 vendors. The largest received 26%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 41/100: finishing works counts most

  1. Works completed 30%11Completed ÷ recommended works.
  2. Spending efficiency 20%15Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%47Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%56Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    92
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SATYAVER SIGH CONTRACTOR AND SUPPLIER, 26% of payments across 24 vendors.

District sanction speed

76/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%76Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

140 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction Work of CC road and Draining Syestem On Pankaj Shoup To Late Shivraj House in village Jhalri

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bijnor· #324297

    ₹12.4 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • Construction work of RCC road with Draining System Rajender house to way Bypass in village Rasulpur Bruki

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #320773

    ₹12.1 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction work of RCC road with Draining System Vimal son of Goverdhan House to Mula House in village Ghatayan Dakshni

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #320774

    ₹11.0 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction work of RCC road with Draining System Karm singh house way to Shiv mandir to Shyodan House in village Dhansri

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #320775

    ₹18.8 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction work of RCC road with Draining System Primary School to Gajender Singh House in village Simbhalki Majra Kolhedi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #320780

    ₹6.1 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction Work of Bhawan Nirmaan in Gujjar Hostal in Rampur Traahe in village Rampu

    Community buildings & public spacesConstruction of community centers and community halls· Muzaffarnagar· #320781

    ₹15.0 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction work of RCC road with Draining System Rajwaahe Nahar pe Masjid ke kinaare se Shiv Mandir in village Dadheru Kalan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #320782

    ₹10.9 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction work of RCC road with Draining System Near Primary School Rajpal Filed to LakhmiChand Fild in village Kundanpur BA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bijnor· #320783

    ₹11.8 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • Construction Work of Community Hall in HS Inter Collage in Village Jhalu Rural

    Community buildings & public spacesConstruction of community centers and community halls· Bijnor· #320785

    ₹15.0 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • construction work of Community hall in Tehsil Prisar in Kasba Chandpur

    Community buildings & public spacesConstruction of community centers and community halls· Bijnor· #317480

    ₹15.0 L Awaiting sanction · 39 daysRec. 23 Sep 2026
  • construction work of Bhawan nirmaan in inter collage village Bhoker heri

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Muzaffarnagar· #317485

    ₹15.0 L Awaiting sanction · 39 daysRec. 23 Sep 2026
  • Construction work of Floor Tiles in Ambedkar Bhawan in Subhash Nagar ward no 35

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #229451

    ₹3.4 L Sanctioned · 8 Sept 2026Rec. 20 Sep 2025
  • Construction work of CC Road and Draning Road system to Sanidev Temple to Deepak House in village Faridpur Bhogi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bijnor· #230822

    ₹6.5 L Completed 7 Sept 2026Rec. 27 Sep 2025Paid ₹6.5 L
  • Construction of CC road and Draining System on Bharav Baba MAndir way in Village Rasulpur Garhi

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #312652

    ₹10.1 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • Construction work of CC road and Draining System on Maharajnagar Main Road to Raj singh House in Village Majilishpur Tofir

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Muzaffarnagar· #312664

    ₹8.3 L Awaiting sanction · 55 daysRec. 7 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.