Allocated limit
₹15.53 Cr
Median ₹14.70 Cr
Fund utilisation
52%
₹8.06 Cr recommended · 87 works
Below median (76%)
Paid to vendors
₹4.96 Cr
32% of allocation
Below median (37%)
Works completed
46
53% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP87 works
₹8.06 Cr · 52% of the ₹15.53 Cr allocated
- Sanctioned by the district72 works
83% sanctioned · took 2.8 months on average (due within 45 days)
- Completed46 works
₹4.08 Cr final cost · 8.9 months from recommendation on average
15 works are still awaiting sanction, 7 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 87 works worth ₹8.06 Cr, a fund utilisation of 52%, higher than 14% of 18th Lok Sabha MPs.
- The district has sanctioned 72 of them, taking 2.8 months on average.
- ₹4.96 Cr has been paid to vendors, 32% of the allocation.
- 46 works are complete, typically 8.9 months after recommendation. 30 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 20 vendors. The largest received 28%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 62/100: finishing works counts most
- Works completed 30%53Completed ÷ recommended works.
- Spending efficiency 20%82Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%52Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%65Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%32Paid to vendors ÷ allocated limit.
- Vendor diversity 10%89How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Mittal Generator, 28% of payments across 20 vendors.
District sanction speed
90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
87 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of a drain and interlocking tiles from Mir Singh's house to Shyamdatt's house in Ward No. 35, Akbarpur Bahrampur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #286890
₹7.7 L Sanctioned · 24 Oct 2026Rec. 18 Jun 2026Construction of CC road and drain from J-132 to J-979 in J-Block, Chakki Wali Gali, Vijay Nagar (Ward No. 03)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #286892
₹4.6 L Sanctioned · 24 Oct 2026Rec. 18 Jun 2026Work of shifting two transformers to the park towards 12 meter road in Vasundhara Ghaziabad
Electricity & lightingImprovement of electricity distribution infrastructure· Ghaziabad· #263644
₹7.7 L Completed 16 Oct 2026Rec. 30 Jan 2026Paid ₹7.7 LWard No 9 Patel Nagar Me C 16 se C 10 Tak CC road and Side Me interlocking tiles ka nirman Karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #233772
₹6.9 L Completed 24 Sept 2026Rec. 14 Sep 2025Paid ₹6.9 LInterlocking tiles construction work from Brahmpal Singh house to Harimohan Agarwal house and from Ajay Gupta ji house to Pawan Singhal house in Govindpuram Asal Garden
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #256860
₹9.7 L Completed 24 Sept 2026Rec. 3 Jan 2026Paid ₹9.7 Lbaroda hindvan gaon mein nanak ke ghar se rajendra ke ghar tak CC sadak aur naali ka nirman
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #305285
₹6.6 L Awaiting sanction · 38 daysRec. 24 Sep 2026nagla gajju me mandir se kripal ke ghar or C C road evam naali nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #305286
₹10.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026gram sapanvat me mahaveer ki baithak se harendra ke ghar tak tak R C C nala ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #305287
₹9.9 L Awaiting sanction · 38 daysRec. 24 Sep 2026gram badoda hindwan me sanjeev ke ghar se yashpal ke ghar tak C C road va naali ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #305288
₹8.6 L Awaiting sanction · 38 daysRec. 24 Sep 2026Construction of a CC road and drain from the temple to Mukesh house in Village Sukhdevpur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #315240
₹4.5 L Awaiting sanction · 38 daysRec. 24 Sep 2026Construction of a CC road and drain from Rajkumar house to Naresh house in Village Sukhdevpur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #315241
₹9.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Construction of a CC road and drain along the main route from Ajit house to Birju house in village Udayrampur Nagla
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #315242
₹7.7 L Awaiting sanction · 38 daysRec. 24 Sep 2026Construction of a CC road from the Shiva temple to Omi's house in village Girdharpur Tumrail
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #315243
₹9.8 L Awaiting sanction · 38 daysRec. 24 Sep 2026Ward 45 Sadullabad me Vasudev Wali Gali me Nali And interlocking tiles ka nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #233777
₹8.0 L Completed 23 Sept 2026Rec. 14 Sep 2025Paid ₹8.0 LVillage Kotwalpur ke Shamshanghat me interlocking tiles ka nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #233781
₹5.0 L Completed 23 Sept 2026Rec. 14 Sep 2025Paid ₹5.0 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.