Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Sanjay Kumar Bandi

Lok SabhaBJPKarimnagar · Telangana

MP score61/100201st of 542 in the 18th Lok Sabha
5th of 17 from Telangana
Also an MP in the 17th Lok Sabha Then: 99% utilisation, 294 works completed, score 73.

Allocated limit

₹17.28 Cr

Median ₹14.70 Cr

Fund utilisation

97%

₹16.75 Cr recommended · 635 works
Above median (76%)

Paid to vendors

₹7.00 Cr

41% of allocation
Above median (37%)

Works completed

217

34% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP635 works

    ₹16.75 Cr · 97% of the ₹17.28 Cr allocated

  2. Sanctioned by the district442 works

    70% sanctioned · took 4.3 months on average (due within 45 days)

  3. Completed217 works

    ₹5.09 Cr final cost · 7.9 months from recommendation on average

193 works are still awaiting sanction, 188 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 635 works worth ₹16.75 Cr, a fund utilisation of 97%, higher than 86% of 18th Lok Sabha MPs.
  • The district has sanctioned 442 of them, taking 4.3 months on average.
  • ₹7.00 Cr has been paid to vendors, 41% of the allocation.
  • 217 works are complete, typically 7.9 months after recommendation. 126 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Drinking water.
  • Payments went to 67 vendors. The largest received 27%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 61/100: finishing works counts most

  1. Works completed 30%34Completed ÷ recommended works.
  2. Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%58Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%41Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    91
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Ahmed Raza, 27% of payments across 67 vendors.

District sanction speed

72/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%72Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

635 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • B.w C.o P.C Mahalnobis Reading Room besides Film Bhavan, Mukarampura division No. 52 in Karimnagar Municipal Corporation

    Community buildings & public spacesConstruction of community centers and community halls· Karimnagar· #219543

    ₹5.0 L Time Estimation · 30 Oct 2026Rec. 17 Jul 2025
  • C/o. Community Hall in Sy.No 394/5 of Nagampeta Village of Jammikunta Mandal

    Community buildings & public spacesConstruction of community centers and community halls· Karimnagar· #323403

    ₹3.0 L Awaiting sanction · 15 daysRec. 17 Oct 2026
  • C/o. Shed in in Sy.No 142 of Vankyala gudem Village of Shankarapatnam Mandal

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Karimnagar· #323404

    ₹1.5 L Awaiting sanction · 15 daysRec. 17 Oct 2026
  • B/w Roofing and Flooring to Common use Shed-2 for Vegetable Market at Asifnagar village of Kothapally Mandal

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Karimnagar· #323405

    ₹5.0 L Awaiting sanction · 15 daysRec. 17 Oct 2026
  • Drilling of Borewell and Pumpset Near Mahalakshmi Temple in Ward No.4 of Vemulawada Municipality

    Drinking waterInstalling tube-wells and borewells· Rajanna Sircilla· #284475

    ₹2.0 L Sanctioned · 15 Oct 2026Rec. 29 May 2026
  • Drilling of Bore well and Pump in Ward No. 06 beside Dhanya Naik house Malothu thanda, Rangampeta (V) of Veernapalli Mandal

    Drinking waterInstalling tube-wells and borewells· Rajanna Sircilla· #296098

    ₹2.0 L Sanctioned · 15 Oct 2026Rec. 17 Jul 2026
  • Drilling of Borewell and Pumpset Near Sri Krishna yadava Sangham in Lingampeta (V) Chandurthi(M)

    Drinking waterInstalling tube-wells and borewells· Rajanna Sircilla· #318817

    ₹2.0 L Sanctioned · 15 Oct 2026Rec. 28 Sep 2026
  • Drilling of Borewell and Pumpset in Devuni Thanda (V) (Jalapathi Thanda) of Chandurty Mandal

    Drinking waterInstalling hand pumps· Rajanna Sircilla· #318818

    ₹2.0 L Sanctioned · 15 Oct 2026Rec. 28 Sep 2026
  • Drilling of Borewell and Pumpset in Ward No.33 of Siricilla Municipality

    Drinking waterInstalling tube-wells and borewells· Rajanna Sircilla· #319177

    ₹2.0 L Sanctioned · 15 Oct 2026Rec. 30 Sep 2026
  • Construction of boundary walls of existing public and community building in Sy.No.438/A of Kuchanapalli (V) Husnabad (M)

    Community buildings & public spacesConstruction of community centers and community halls· Siddipet· #322162

    ₹3.0 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Drilling of Bore well and Pump set near H.NO 4-93 by2 by1 in Gopalpur (V) of Elkathurthy

    Drinking waterInstalling tube-wells and borewells· Hanumakonda· #188788

    ₹2.0 L Sanctioned · 8 Oct 2026Rec. 2 Apr 2025
  • Drilling of Bore well and Pump set Near H.No. 8-93by3 in Chigurumamidi (V) and (M)

    Drinking waterInstalling tube-wells and borewells· Karimnagar· #219500

    ₹1.9 L Completed 8 Oct 2026Rec. 17 Jul 2025Paid ₹1.9 L
  • Drilling of Bore well and Pump set near H.No. 1-43 in Indurthi (V) of Chigurumamidi (M)

    Drinking waterInstalling tube-wells and borewells· Karimnagar· #219502

    ₹1.9 L Completed 8 Oct 2026Rec. 17 Jul 2025Paid ₹1.9 L
  • Drilling of Bore well and Pump set near H.No. 2-22byB in Peechupalli (V) of Chigurumamidi (M)

    Drinking waterInstalling tube-wells and borewells· Karimnagar· #219503

    ₹1.8 L Completed 8 Oct 2026Rec. 17 Jul 2025Paid ₹1.8 L
  • Drilling of Bore well and Pump set near H.No. 6-99by1 in Rekonda (V) Chigurumamidi (M)

    Drinking waterInstalling tube-wells and borewells· Karimnagar· #219505

    ₹1.9 L Completed 8 Oct 2026Rec. 17 Jul 2025Paid ₹1.9 L

18th Lok Sabha MPs from Telangana

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Balram Naik Porika · Mahabubabad74%50%23975
2Chamala Kiran Kumar Reddy · Bhongir64%45%41771
3Dr.Mallu Ravi · Nagarkurnool75%42%14368
4Arvind Dharmapuri · Nizamabad97%57%48065
5Sanjay Kumar Bandi · Karimnagar97%41%21761
6Kadiyam Kavya · Warangel74%24%7660
7Konda Vishweshwar Reddy · Chelvella64%29%18256
8Aruna. D. K · Mahabubnagar87%34%12956
9Godam Nagesh · Adilabad73%25%8155
10Madhavaneni Raghunandan Rao · Medak82%25%4150
11Eatala Rajender · Malkajgiri77%13%3447
12Suresh Kumar Shetkar · Zahirabad71%27%6539

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.