Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Godam Nagesh

Lok SabhaBJPST seatAdilabad · Telangana

MP score55/100286th of 542 in the 18th Lok Sabha
9th of 17 from Telangana

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

73%

₹10.71 Cr recommended · 356 works
About the median

Paid to vendors

₹3.62 Cr

25% of allocation
Below median (37%)

Works completed

81

23% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP356 works

    ₹10.71 Cr · 73% of the ₹14.70 Cr allocated

  2. Sanctioned by the district220 works

    62% sanctioned · took 4.9 months on average (due within 45 days)

  3. Completed81 works

    ₹1.80 Cr final cost · 9.1 months from recommendation on average

136 works are still awaiting sanction, 136 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 356 works worth ₹10.71 Cr, a fund utilisation of 73%, higher than 44% of 18th Lok Sabha MPs.
  • The district has sanctioned 220 of them, taking 4.9 months on average.
  • ₹3.62 Cr has been paid to vendors, 25% of the allocation.
  • 81 works are complete, typically 9.1 months after recommendation. 81 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 49 vendors. The largest received 12%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 55/100: finishing works counts most

  1. Works completed 30%23Completed ÷ recommended works.
  2. Spending efficiency 20%50Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%73Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%25Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SK SHUTTERS AND FABRICATORS, 12% of payments across 49 vendors.

District sanction speed

65/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%65Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

356 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Remove of Electrical Loop Lines at L Ramya and Narayana Reddy and Others Agriculture fields

    Electricity & lightingImprovement of electricity distribution infrastructure· Nirmal· #294519

    ₹4.0 L Sanctioned · 23 Oct 2026Rec. 12 Jul 2026
  • Construction of Library Building at RRO Camp Kapuwada in Kagaznagar Town

    Education & librariesConstruction of public libraries and reading rooms· Kumuram Bheem Asifabad· #262008

    ₹50.0 L Sanctioned · 7 Oct 2026Rec. 26 Jan 2026
  • Formation of Gravel Road Fraom R and B Road to SC Colony Pothapally village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kumuram Bheem Asifabad· #257694

    ₹5.0 L Completed 22 Sept 2026Rec. 6 Jan 2026Paid ₹5.0 L
  • Construction of Community hall at BC Colony AP Nagar

    Community buildings & public spacesConstruction of community centers and community halls· Nirmal· #294499

    ₹5.0 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Drilling of Borewell and Installation of Pumpset at Ashta village

    Drinking waterInstalling tube-wells and borewells· Nirmal· #294514

    ₹2.0 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Construction of Reading room at Rajesh Thanda village Narsimha Nagar Thanda GP

    Education & librariesConstruction of public libraries and reading rooms· Nirmal· #294515

    ₹10.0 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Construction of Side drain from Sakaram House to Cattle pond

    Sanitation & drainageProviding drains and gutters for public drainage· Nirmal· #294517

    ₹2.5 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Construction of Side drain and Slab Culvert on Raod from Ramesh House to Renuka Bai House

    Sanitation & drainageProviding drains and gutters for public drainage· Nirmal· #294518

    ₹2.5 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Improvement of road and drain at BC Colony Malegaon

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nirmal· #294520

    ₹3.0 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Streghthing of Road from Thanaji Patel Agriculture field to Ramulu Bandare field

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nirmal· #294521

    ₹5.0 L Sanctioned · 8 Sept 2026Rec. 12 Jul 2026
  • Drilling of Borewell near Andeku Anand(h)

    Drinking waterInstalling tube-wells and borewells· Nirmal· #295513

    ₹1.4 L Sanctioned · 8 Sept 2026Rec. 15 Jul 2026
  • Drilling of Borewell at Bopparapu Vadakattu

    Drinking waterInstalling tube-wells and borewells· Nirmal· #295514

    ₹1.4 L Sanctioned · 8 Sept 2026Rec. 15 Jul 2026
  • Drilling of Borewell at Hanuman Vadakattu

    Drinking waterInstalling tube-wells and borewells· Nirmal· #295516

    ₹1.4 L Sanctioned · 8 Sept 2026Rec. 15 Jul 2026
  • Drilling of Borewell at Kurma Galli

    Drinking waterInstalling tube-wells and borewells· Nirmal· #295517

    ₹1.4 L Sanctioned · 8 Sept 2026Rec. 15 Jul 2026
  • Drilling of Borewell at BC Colony

    Drinking waterInstalling tube-wells and borewells· Nirmal· #295518

    ₹1.4 L Sanctioned · 8 Sept 2026Rec. 15 Jul 2026

18th Lok Sabha MPs from Telangana

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Balram Naik Porika · Mahabubabad74%50%23975
2Chamala Kiran Kumar Reddy · Bhongir64%45%41771
3Dr.Mallu Ravi · Nagarkurnool75%42%14368
4Arvind Dharmapuri · Nizamabad97%57%48065
5Sanjay Kumar Bandi · Karimnagar97%41%21761
6Kadiyam Kavya · Warangel74%24%7660
7Konda Vishweshwar Reddy · Chelvella64%29%18256
8Aruna. D. K · Mahabubnagar87%34%12956
9Godam Nagesh · Adilabad73%25%8155
10Madhavaneni Raghunandan Rao · Medak82%25%4150
11Eatala Rajender · Malkajgiri77%13%3447
12Suresh Kumar Shetkar · Zahirabad71%27%6539

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.