Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Dr.Mallu Ravi

Lok SabhaINCSC seatNagarkurnool · Telangana

MP score68/100115th of 542 in the 18th Lok Sabha
3rd of 17 from Telangana

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

75%

₹11.07 Cr recommended · 237 works
About the median

Paid to vendors

₹6.20 Cr

42% of allocation
Above median (37%)

Works completed

143

60% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP237 works

    ₹11.07 Cr · 75% of the ₹14.70 Cr allocated

  2. Sanctioned by the district203 works

    86% sanctioned · took 34 days on average (due within 45 days)

  3. Completed143 works

    ₹3.52 Cr final cost · 3.2 months from recommendation on average

34 works are still awaiting sanction, 31 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 237 works worth ₹11.07 Cr, a fund utilisation of 75%, higher than 49% of 18th Lok Sabha MPs.
  • The district has sanctioned 203 of them, taking 34 days on average.
  • ₹6.20 Cr has been paid to vendors, 42% of the allocation.
  • 143 works are complete, typically 3.2 months after recommendation. 129 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 27 vendors. The largest received 22%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 68/100: finishing works counts most

  1. Works completed 30%60Completed ÷ recommended works.
  2. Spending efficiency 20%57Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%75Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%90Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%42Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    98
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Mohammed Hassan Ahemed, 22% of payments across 27 vendors.

District sanction speed

93/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%93Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

237 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Compound Wall Northside for ZPHS Boys High School Nagarkurnool

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nagarkurnool· #324847

    ₹10.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of Toilets and Compound wall at back side for ZPHS BOys High School Nagarkurnool

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Nagarkurnool· #324848

    ₹5.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of 2nd Floor of Community Building at Begumbazar Hyderabad

    Community buildings & public spacesConstruction of community centers and community halls· Hyderabad· #2343

    ₹40.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • CC Road from Dastagiri House to Nakka Sudhakar House at Tummapally Weaver Colony

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jogulamba Gadwal· #277606

    ₹5.0 L Work partially Completed · 3 Oct 2026Rec. 8 Apr 2026Paid ₹5.0 L
  • Laying of CC Road from Shashi House to Kanike Raju House via Mala Govindamma House in weavers colony

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jogulamba Gadwal· #277611

    ₹5.0 L Work partially Completed · 3 Oct 2026Rec. 8 Apr 2026Paid ₹5.0 L
  • Laying of CC Road from H Beechpally House to CHurch

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jogulamba Gadwal· #277609

    ₹5.0 L Work partially Completed · 29 Sept 2026Rec. 8 Apr 2026Paid ₹4.8 L
  • Balance Work of Sagara Sangam Hall

    Community buildings & public spacesConstruction of community centers and community halls· Wanaparthy· #309658

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Upgradation of road from Ankoor to Narsaipally Anjaneyaswamy Temple Bit-I

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Wanaparthy· #309659

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Upgradation of road from Ankoor to Narsaipally Anjaneyaswamy Temple Bit-II

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Wanaparthy· #309660

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Construction of Community Building

    Community buildings & public spacesConstruction of community centers and community halls· Wanaparthy· #309661

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Construction of Youth Building

    Community buildings & public spacesConstruction of community centers and community halls· Wanaparthy· #309662

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Formation of Gravel road from R and B Road to Creamtorium

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Wanaparthy· #309663

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Formation of Gravel road to Gutta

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Wanaparthy· #309664

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Contruction of Bridge back side of Chennakeshava Temple

    Roads & bridgesConstruction of culverts and bridges· Wanaparthy· #309665

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Laying of CC Platform near temple

    Roads & bridgesConstruction of footpaths and pedestrian ways· Wanaparthy· #309666

    ₹5.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026

18th Lok Sabha MPs from Telangana

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Balram Naik Porika · Mahabubabad74%50%23975
2Chamala Kiran Kumar Reddy · Bhongir64%45%41771
3Dr.Mallu Ravi · Nagarkurnool75%42%14368
4Arvind Dharmapuri · Nizamabad97%57%48065
5Sanjay Kumar Bandi · Karimnagar97%41%21761
6Kadiyam Kavya · Warangel74%24%7660
7Konda Vishweshwar Reddy · Chelvella64%29%18256
8Aruna. D. K · Mahabubnagar87%34%12956
9Godam Nagesh · Adilabad73%25%8155
10Madhavaneni Raghunandan Rao · Medak82%25%4150
11Eatala Rajender · Malkajgiri77%13%3447
12Suresh Kumar Shetkar · Zahirabad71%27%6539

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.