Works waiting for sanction
100 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
72%
₹10.54 Cr recommended · 231 works
Below median (76%)
Paid to vendors
₹7.99 Cr
54% of allocation
Above median (37%)
Works completed
95
41% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP231 works
₹10.54 Cr · 72% of the ₹14.70 Cr allocated
- Sanctioned by the district131 works
57% sanctioned · took 3.8 months on average (due within 45 days)
- Completed95 works
₹6.30 Cr final cost · 13.0 months from recommendation on average
100 works are still awaiting sanction, 100 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 231 works worth ₹10.54 Cr, a fund utilisation of 72%, higher than 42% of 18th Lok Sabha MPs.
- The district has sanctioned 131 of them, taking 3.8 months on average.
- ₹7.99 Cr has been paid to vendors, 54% of the allocation.
- 95 works are complete, typically 13.0 months after recommendation. 90 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 21 vendors. The largest received 19%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 68/100: finishing works counts most
- Works completed 30%41Completed ÷ recommended works.
- Spending efficiency 20%79Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%72Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%54Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: ANUJ INTERLOCKING, 19% of payments across 21 vendors.
District sanction speed
67/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%67Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
231 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Ch chransingh kragar me bandiyo ke leya Bakre unite
Electricity & lightingPurchase of non-conventional energy system and devices for community use· Meerut· #279623
₹20.2 L Completed 12 Oct 2026Rec. 5 May 2026Paid ₹20.2 Lward 59 me rilience jwellers se kanwarpal balle waloki or tiles
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #143079
₹5.9 L Completed 24 Sept 2026Rec. 24 Sep 2024Paid ₹5.9 Ldevlok colony me k c block me rajesh se gujjan tak cc
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #143083
₹7.3 L Completed 24 Sept 2026Rec. 24 Sep 2024Paid ₹7.3 L?????? ????? ?????? ????? ??? ??? ????? ?? ???? ?? ??? ??? ?? ?? ??0??0 ??? ?????? ??? ??????? ??????
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #162075
₹5.7 L Completed 24 Sept 2026Rec. 28 Dec 2024Paid ₹5.7 LC 2 rohit house to B 38 Gaurave(A.D.M) ke makan tk dens dwara road work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #214890
₹10.0 L Completed 24 Sept 2026Rec. 4 Jul 2025Paid ₹10.0 LGarh road smrate pless C 71 se C 84 tk road work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #214891
₹10.0 L Completed 24 Sept 2026Rec. 4 Jul 2025Paid ₹10.0 LGanpati vihar Gali no 4 vijnder deshwal house to Ansh chohan house tilss work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #248649
₹9.9 L Completed 24 Sept 2026Rec. 17 Nov 2025Paid ₹9.9 LKankher khera me narender Foji ke dukan se Sanjeev ke maken ke aur C.C road woark
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #248654
₹8.4 L Completed 24 Sept 2026Rec. 17 Nov 2025Paid ₹8.4 LKnkerkhera me sanjey yadev ke makan se ramkishor ke maken ke aur C.C road Woark
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #248658
₹9.9 L Completed 24 Sept 2026Rec. 17 Nov 2025Paid ₹9.9 LHapur Nager ke Prbha vihar Gali no1 me Ram ke ghar se Yshpal ke ghar ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252835
₹25.0 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹25.0 L. Hapur Nager ke Prbha vihar Gali no3 me Jagveer ke ghar se CH Harvinder ke ghar ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252836
₹8.7 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹8.7 L. Hapur ke Muredepur Nai mande Hapur me Nabu ke ghar se Suresh ke ghar ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252837
₹2.4 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹2.4 L. Hapur Gram Shyampur me Satish ke ghar se Ramshwarup ke ghar ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252838
₹8.5 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹8.5 L. Hapur Gram Kathi khera me Ved Parkesh ke ghar se Chandi Mata Mandir ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252839
₹14.0 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹14.0 L. Hapur Gram Humypur me Mhaish ke ghar se Radhe Sharma ke ghar ke thref Interloking road and nail work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hapur· #252840
₹10.2 L Completed 24 Sept 2026Rec. 8 Dec 2025Paid ₹10.2 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.