MP score70/10091st of 542 in the 18th Lok Sabha
15th of 39 from Tamil Nadu
Also an MP in the 17th Lok Sabha Then: 95% utilisation, 112 works completed, score 86.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

64%

₹9.47 Cr recommended · 114 works
Below median (76%)

Paid to vendors

₹7.68 Cr

52% of allocation
Above median (37%)

Works completed

77

68% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP114 works

    ₹9.47 Cr · 64% of the ₹14.70 Cr allocated

  2. Sanctioned by the district93 works

    82% sanctioned · took 8.5 months on average (due within 45 days)

  3. Completed77 works

    ₹6.11 Cr final cost · 8.5 months from recommendation on average

21 works are still awaiting sanction, 21 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 114 works worth ₹9.47 Cr, a fund utilisation of 64%, higher than 30% of 18th Lok Sabha MPs.
  • The district has sanctioned 93 of them, taking 8.5 months on average.
  • ₹7.68 Cr has been paid to vendors, 52% of the allocation.
  • 77 works are complete, typically 8.5 months after recommendation. 45 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 64 vendors. The largest received 7.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 70/100: finishing works counts most

  1. Works completed 30%68Completed ÷ recommended works.
  2. Spending efficiency 20%80Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%64Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%58Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%52Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: C Chithambaram, 7.2% of payments across 64 vendors.

District sanction speed

57/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%57Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

114 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Passenger Shelter at Sevur Panchayat

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Tiruppur· #197214

    ₹14.0 L Completed 6 Oct 2026Rec. 24 Jun 2025Paid ₹14.0 L
  • Construction of Passenger Shelter nearer at Govt Primary Health Centre Barwood at OValley Town Panchayat

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· The Nilgiris· #270877

    ₹6.0 L Physical Inspection · 29 Sept 2026Rec. 25 Feb 2026Paid ₹6.0 L
  • Providing new borewell with 7.5 HP Electric Motor at Kalkadambur at Kuthiyalur Panchayat

    Drinking waterInstalling tube-wells and borewells· Erode· #197199

    ₹3.9 L Completed 21 Sept 2026Rec. 24 Jun 2025Paid ₹3.9 L
  • Construction of Passenger Shelter at kombaithotti at Koothampalayam at Sathymangalam Block

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Erode· #204011

    ₹6.0 L Completed 21 Sept 2026Rec. 24 Jun 2025Paid ₹6.0 L
  • Construction of PD Shop Building at Lingapuram Ward No 2 at Sirumugai Town Panchayat

    Community buildings & public spacesConstruction of community centers and community halls· Coimbatore· #140337

    ₹16.9 L Completed 16 Sept 2026Rec. 11 Sep 2024Paid ₹16.9 L
  • Construction of 30000 Litres capacity OHT 12M Stage at Alagepalayam AD Colony at Kuppanur Panchayat

    Drinking waterConstruction of water tanks· Coimbatore· #140339

    ₹14.0 L Completed 19 Aug 2026Rec. 11 Sep 2024Paid ₹14.0 L
  • Providing Footpath with side walls at SC Colony at Nadugani (Ward no 21) at Nelliyalam Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #219280

    ₹15.0 L Physical Inspection · 19 Aug 2026Rec. 23 Aug 2025Paid ₹15.0 L
  • Providing CC Road at Rangaiya Gowder Street main Rangaiya Gowder street 1st cut Mallajja gowder main and Street 1st cut Sanjay Gandhi nagar 14th cut Ward No 19 at Karamadai Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Coimbatore· #211760

    ₹14.8 L Completed 13 Aug 2026Rec. 24 Jun 2025Paid ₹14.8 L
  • Providing Water Doctor 75 Ltr hot and cold at Government Hospital at Gudalur Town

    HealthPurchase of hospital equipment· The Nilgiris· #269574

    ₹45,000 Completed 13 Aug 2026Rec. 25 Feb 2026Paid ₹45,000
  • Providing 20KV UPS for dialysis unit 2hrs backup at Government Hospital at Gudalur Town

    HealthPurchase of hospital equipment· The Nilgiris· #269575

    ₹3.4 L Completed 13 Aug 2026Rec. 25 Feb 2026Paid ₹3.4 L
  • Providing CC Platform at l at Mission Compound at Kotagiri Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #204068

    ₹4.0 L Completed 11 Aug 2026Rec. 24 Jun 2025Paid ₹4.0 L
  • Construction of Multipurpose Building at Muthugula Village Balacola Panchayat at Udhagai block

    Community buildings & public spacesConstruction of community centers and community halls· The Nilgiris· #219241

    ₹15.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹15.0 L
  • Construction of Bus shelter at Tehikil village at Kookal thorai Main Road t Kookal Panchayat Udhagai Block

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· The Nilgiris· #219242

    ₹5.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹5.0 L
  • Providing Shelter Near Community Hall at Ithalar Panchayat at Udhagai Block

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· The Nilgiris· #223215

    ₹7.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹7.0 L
  • Construction of 30,000 Litres capacity OHT (12M stage) at Kuttaipudhur (Ward No.2) H/o Annur Town Panchayat.

    Drinking waterConstruction of water tanks· Coimbatore· #160926

    ₹16.0 L Completed 8 Aug 2026Rec. 11 Jan 2025Paid ₹16.0 L

18th Lok Sabha MPs from Tamil Nadu

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Dr Rani Sri Kumar · Tenkasi88%66%11783
2V S Matheswaran · Namakkal79%62%15082
3Tharaniventhan M S · Arani94%67%20381
4Manickam Tagore B · Virudhunagar65%63%6980
5Ganesan Selvam · Kancheepuram91%59%27880
6CN Annadurai · Tiruvannamalai71%62%17579
7K Subbarayan · Tiruppur94%57%6576
8Gopinath K · Krishnagiri57%34%6776
9Robert Bruce C · Tirunelveli95%49%7676
10K E Prakash · Erode78%59%14175
11M.K. Vishnuprasad · Cuddalore70%53%7474
12Murasoli S · Thanjavur97%54%4874

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.