Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
64%
₹9.47 Cr recommended · 114 works
Below median (76%)
Paid to vendors
₹7.68 Cr
52% of allocation
Above median (37%)
Works completed
77
68% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP114 works
₹9.47 Cr · 64% of the ₹14.70 Cr allocated
- Sanctioned by the district93 works
82% sanctioned · took 8.5 months on average (due within 45 days)
- Completed77 works
₹6.11 Cr final cost · 8.5 months from recommendation on average
21 works are still awaiting sanction, 21 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 114 works worth ₹9.47 Cr, a fund utilisation of 64%, higher than 30% of 18th Lok Sabha MPs.
- The district has sanctioned 93 of them, taking 8.5 months on average.
- ₹7.68 Cr has been paid to vendors, 52% of the allocation.
- 77 works are complete, typically 8.5 months after recommendation. 45 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 64 vendors. The largest received 7.2%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 70/100: finishing works counts most
- Works completed 30%68Completed ÷ recommended works.
- Spending efficiency 20%80Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%64Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%58Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%52Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: C Chithambaram, 7.2% of payments across 64 vendors.
District sanction speed
57/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%57Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
114 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Passenger Shelter at Sevur Panchayat
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Tiruppur· #197214
₹14.0 L Completed 6 Oct 2026Rec. 24 Jun 2025Paid ₹14.0 LConstruction of Passenger Shelter nearer at Govt Primary Health Centre Barwood at OValley Town Panchayat
Community buildings & public spacesConstruction of bus-sheds or bus-stops· The Nilgiris· #270877
₹6.0 L Physical Inspection · 29 Sept 2026Rec. 25 Feb 2026Paid ₹6.0 LProviding new borewell with 7.5 HP Electric Motor at Kalkadambur at Kuthiyalur Panchayat
Drinking waterInstalling tube-wells and borewells· Erode· #197199
₹3.9 L Completed 21 Sept 2026Rec. 24 Jun 2025Paid ₹3.9 LConstruction of Passenger Shelter at kombaithotti at Koothampalayam at Sathymangalam Block
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Erode· #204011
₹6.0 L Completed 21 Sept 2026Rec. 24 Jun 2025Paid ₹6.0 LConstruction of PD Shop Building at Lingapuram Ward No 2 at Sirumugai Town Panchayat
Community buildings & public spacesConstruction of community centers and community halls· Coimbatore· #140337
₹16.9 L Completed 16 Sept 2026Rec. 11 Sep 2024Paid ₹16.9 LConstruction of 30000 Litres capacity OHT 12M Stage at Alagepalayam AD Colony at Kuppanur Panchayat
Drinking waterConstruction of water tanks· Coimbatore· #140339
₹14.0 L Completed 19 Aug 2026Rec. 11 Sep 2024Paid ₹14.0 LProviding Footpath with side walls at SC Colony at Nadugani (Ward no 21) at Nelliyalam Municipality
Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #219280
₹15.0 L Physical Inspection · 19 Aug 2026Rec. 23 Aug 2025Paid ₹15.0 LProviding CC Road at Rangaiya Gowder Street main Rangaiya Gowder street 1st cut Mallajja gowder main and Street 1st cut Sanjay Gandhi nagar 14th cut Ward No 19 at Karamadai Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Coimbatore· #211760
₹14.8 L Completed 13 Aug 2026Rec. 24 Jun 2025Paid ₹14.8 LProviding Water Doctor 75 Ltr hot and cold at Government Hospital at Gudalur Town
HealthPurchase of hospital equipment· The Nilgiris· #269574
₹45,000 Completed 13 Aug 2026Rec. 25 Feb 2026Paid ₹45,000Providing 20KV UPS for dialysis unit 2hrs backup at Government Hospital at Gudalur Town
HealthPurchase of hospital equipment· The Nilgiris· #269575
₹3.4 L Completed 13 Aug 2026Rec. 25 Feb 2026Paid ₹3.4 LProviding CC Platform at l at Mission Compound at Kotagiri Municipality
Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #204068
₹4.0 L Completed 11 Aug 2026Rec. 24 Jun 2025Paid ₹4.0 LConstruction of Multipurpose Building at Muthugula Village Balacola Panchayat at Udhagai block
Community buildings & public spacesConstruction of community centers and community halls· The Nilgiris· #219241
₹15.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹15.0 LConstruction of Bus shelter at Tehikil village at Kookal thorai Main Road t Kookal Panchayat Udhagai Block
Community buildings & public spacesConstruction of bus-sheds or bus-stops· The Nilgiris· #219242
₹5.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹5.0 LProviding Shelter Near Community Hall at Ithalar Panchayat at Udhagai Block
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· The Nilgiris· #223215
₹7.0 L Completed 11 Aug 2026Rec. 23 Aug 2025Paid ₹7.0 LConstruction of 30,000 Litres capacity OHT (12M stage) at Kuttaipudhur (Ward No.2) H/o Annur Town Panchayat.
Drinking waterConstruction of water tanks· Coimbatore· #160926
₹16.0 L Completed 8 Aug 2026Rec. 11 Jan 2025Paid ₹16.0 L
18th Lok Sabha MPs from Tamil Nadu
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr Rani Sri Kumar · Tenkasi | 88% | 66% | 117 | 83 |
| 2 | V S Matheswaran · Namakkal | 79% | 62% | 150 | 82 |
| 3 | Tharaniventhan M S · Arani | 94% | 67% | 203 | 81 |
| 4 | Manickam Tagore B · Virudhunagar | 65% | 63% | 69 | 80 |
| 5 | Ganesan Selvam · Kancheepuram | 91% | 59% | 278 | 80 |
| 6 | CN Annadurai · Tiruvannamalai | 71% | 62% | 175 | 79 |
| 7 | K Subbarayan · Tiruppur | 94% | 57% | 65 | 76 |
| 8 | Gopinath K · Krishnagiri | 57% | 34% | 67 | 76 |
| 9 | Robert Bruce C · Tirunelveli | 95% | 49% | 76 | 76 |
| 10 | K E Prakash · Erode | 78% | 59% | 141 | 75 |
| 11 | M.K. Vishnuprasad · Cuddalore | 70% | 53% | 74 | 74 |
| 12 | Murasoli S · Thanjavur | 97% | 54% | 48 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.