Allocated limit
₹14.94 Cr
Median ₹14.70 Cr
Fund utilisation
95%
₹14.21 Cr recommended · 156 works
Above median (76%)
Paid to vendors
₹7.26 Cr
49% of allocation
Above median (37%)
Works completed
76
49% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP156 works
₹14.21 Cr · 95% of the ₹14.94 Cr allocated
- Sanctioned by the district110 works
71% sanctioned · took 8.3 months on average (due within 45 days)
- Completed76 works
₹6.43 Cr final cost · 7.6 months from recommendation on average
46 works are still awaiting sanction, 29 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 156 works worth ₹14.21 Cr, a fund utilisation of 95%, higher than 83% of 18th Lok Sabha MPs.
- The district has sanctioned 110 of them, taking 8.3 months on average.
- ₹7.26 Cr has been paid to vendors, 49% of the allocation.
- 76 works are complete, typically 7.6 months after recommendation. 74 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 38 vendors. The largest received 12%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 76/100: finishing works counts most
- Works completed 30%49Completed ÷ recommended works.
- Spending efficiency 20%89Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%95Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%49Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SAI IT SYSTEMS, 12% of payments across 38 vendors.
District sanction speed
58/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%58Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
156 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Purchase of Punga Equipments in Devanallur Panchayat union Primary School in Kalakadu panchayat Union. (1.Slide (6FT) FRP, 2.Jungle Jim, 3. Swing (2 Seats), 4. SEE-SAW (2 Sets), 5. Duck Spring Rider.
Sports & fitnessDevelopment of playground· Tirunelveli· #254405
₹1.3 L Completed 12 Oct 2026Rec. 17 Dec 2025Paid ₹1.3 LProviding 12 Meter High-mast Light pole with 200W LED Dimmable light arrangements Near Keeraikaranthattu bus stop Thisayanvillai Townpanchayat.
Electricity & lightingStreet lights· Tirunelveli· #179429
₹7.8 L Sanctioned · 9 Oct 2026Rec. 5 Mar 2025Providing 12 Meter High-mast Light pole with 200W LED Dimmable light arrangements Sampuruthipilliyar street, Aravalartha Amman Kovil Street Manikkavathiyar steet Mealpakkam in ward No.10 at Thisayanvillai Townpanchayat.
Electricity & lightingStreet lights· Tirunelveli· #179430
₹7.8 L Sanctioned · 9 Oct 2026Rec. 5 Mar 2025construction of paver block road in an area of 100 meter wide on ambedkar street near rc school 13 ward cheranmahadevi town panchayat
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirunelveli· #195458
₹7.0 L Sanctioned · 9 Oct 2026Rec. 3 May 2025Construction of flood protective wall in palayam channel LS 19300 in tirunelveli coporation area
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tirunelveli· #216865
₹19.9 L Completed 9 Oct 2026Rec. 11 Jul 2025Paid ₹19.9 LConstruction of Community Building at Itteri Panchayat in Palayamkottai Panchayat Union.
Community buildings & public spacesConstruction of community centers and community halls· Tirunelveli· #225332
₹30.0 L Work partially Completed · 9 Oct 2026Rec. 6 Aug 2025Paid ₹29.7 LConstruction of Bridge across LS.3300 at Nanguneriyan Kalvoy in Moonkiladi Village of Nanguneri Taluk in Tirunelveli District.
Roads & bridgesConstruction of road under bridge· Tirunelveli· #228414
₹28.4 L Completed 9 Oct 2026Rec. 22 Aug 2025Paid ₹28.4 LProviding of BT Road at Soorankudi Village Cross road in Soorankudi Panchayat at Kalakadu Panchayat Union.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirunelveli· #246647
₹31.7 L Completed 9 Oct 2026Rec. 7 Nov 2025Paid ₹31.7 LConstruction of Toilet in Burkitmanagaram Govt.Hr.sec.school in Palayamkottai Panchayat Union.
Sanitation & drainageConstruction of toilet blocks· Tirunelveli· #246654
₹8.0 L Sanctioned · 9 Oct 2026Rec. 7 Nov 2025Construction of Community hall at Nehru National Higher Secondary School Vadakankulam Panchayat Valliyur Panchayat Union Tirunelveli District
Community buildings & public spacesConstruction of community centers and community halls· Tirunelveli· #247567
₹10.0 L Sanctioned · 9 Oct 2026Rec. 12 Nov 2025Construction of a small bridge in the Pasukidaivilai Road area of V.K.Puram Municipality 16th Ward.
Roads & bridgesConstruction of culverts and bridges· Tirunelveli· #247569
₹6.0 L Sanctioned · 9 Oct 2026Rec. 12 Nov 2025Tirunelveli District Palayankottai Thiruvananthapuram Road VOC Ground in front of the freedom fighter martyr Thiru VOC statue erected with steps and a shade over the statue
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tirunelveli· #247571
₹12.0 L Sanctioned · 9 Oct 2026Rec. 12 Nov 2025Construction of Kalayarangam in Chittarchathiram village Paruthikulam in Manur Panchayat Union.
Community buildings & public spacesConstruction of community centers and community halls· Tirunelveli· #247572
₹10.0 L Sanctioned · 9 Oct 2026Rec. 12 Nov 2025Providing of New Borewell and Mini Power pump at Mutharamman kovil ward No.7 in Veeravanallur Townpanchayat.
Drinking waterProviding supply pipelines for drinking water· Tirunelveli· #247577
₹3.0 L Sanctioned · 9 Oct 2026Rec. 12 Nov 2025Construction of 30000Litres Capacity Service Reservoir (12.00 M Staging Height), Borewell and Extension of Pipeline at Nakkaneri Village in Dhanakkarkulam Panchayat,Valliyoor Panchayat Union.
Drinking waterConstruction of water tanks· Tirunelveli· #247579
₹22.1 L Physical Inspection · 9 Oct 2026Rec. 12 Nov 2025Paid ₹22.1 L
18th Lok Sabha MPs from Tamil Nadu
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr Rani Sri Kumar · Tenkasi | 88% | 66% | 117 | 83 |
| 2 | V S Matheswaran · Namakkal | 79% | 62% | 150 | 82 |
| 3 | Tharaniventhan M S · Arani | 94% | 67% | 203 | 81 |
| 4 | Manickam Tagore B · Virudhunagar | 65% | 63% | 69 | 80 |
| 5 | Ganesan Selvam · Kancheepuram | 91% | 59% | 278 | 80 |
| 6 | CN Annadurai · Tiruvannamalai | 71% | 62% | 175 | 79 |
| 7 | K Subbarayan · Tiruppur | 94% | 57% | 65 | 76 |
| 8 | Gopinath K · Krishnagiri | 57% | 34% | 67 | 76 |
| 9 | Robert Bruce C · Tirunelveli | 95% | 49% | 76 | 76 |
| 10 | K E Prakash · Erode | 78% | 59% | 141 | 75 |
| 11 | M.K. Vishnuprasad · Cuddalore | 70% | 53% | 74 | 74 |
| 12 | Murasoli S · Thanjavur | 97% | 54% | 48 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.