Re-elected to the 18th Lok Sabha Then: 64% utilisation, 77 works completed, score 70.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

95%

₹9.36 Cr recommended · 123 works
About the median

Paid to vendors

₹8.82 Cr

90% of allocation
About the median

Works completed

112

91% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP123 works

    ₹9.36 Cr · 95% of the ₹9.81 Cr allocated

  2. Sanctioned by the district118 works

    96% sanctioned · took 9.4 months on average (due within 45 days)

  3. Completed112 works

    ₹8.64 Cr final cost · 13.4 months from recommendation on average

5 works are still awaiting sanction, 5 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 123 works worth ₹9.36 Cr, a fund utilisation of 95%, higher than 33% of 17th Lok Sabha MPs.
  • The district has sanctioned 118 of them, taking 9.4 months on average.
  • ₹8.82 Cr has been paid to vendors, 90% of the allocation.
  • 112 works are complete, typically 13.4 months after recommendation. 45 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 76 vendors. The largest received 6.0%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 86/100: finishing works counts most

  1. Works completed 30%91Completed ÷ recommended works.
  2. Spending efficiency 20%98Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%95Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%40Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%90Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: COLLECTOR CHAIRMAN DRDA, 6.0% of payments across 76 vendors.

District sanction speed

60/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%60Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

123 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing CC footpath at Nondimedu near Stephens House in Udhagamandalam Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #59263

    ₹2.0 L Sanctioned · 22 Sept 2026Rec. 8 Dec 2023
  • Construction of PDS shop at Pudupalayam of Pasur Panchayat of Annur Block

    Community buildings & public spacesConstruction of community centers and community halls· Coimbatore· #55534

    ₹9.3 L Completed 19 Aug 2026Rec. 2 Dec 2023Paid ₹9.3 L
  • Providing Grave Yard Shleter at Nerkombai at Kookal Panchayat H O Udhagai Block

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· The Nilgiris· #245174

    ₹5.0 L Completed 18 Aug 2026Rec. 8 Mar 2024Paid ₹5.0 L
  • Providing CC Road in Nethaji Nagar at Karumapalayam Panchayat H O Avinasi Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tiruppur· #245172

    ₹13.0 L Physical Inspection · 14 Aug 2026Rec. 8 Mar 2024Paid ₹12.5 L
  • Construction of Bus Shelter at Veerapandi pirivu Ward No.4 infront of Lakshmi Theater

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Coimbatore· #59183

    ₹7.5 L Vendor Identification · 19 May 2026Rec. 8 Dec 2023Paid ₹5.9 L
  • Construction of 30000 Litre OHT and pipe line extension at Kunnathurampalayam H/o Annur Town Panchayat

    Drinking waterConstruction of water tanks· Coimbatore· #59174

    ₹12.5 L Completed 25 Feb 2026Rec. 8 Dec 2023Paid ₹12.5 L
  • Providing CC Footpath near Sunny Bungalow at Lovedale in Udhagamandalam Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #59265

    ₹2.0 L Completed 10 Feb 2026Rec. 8 Dec 2023Paid ₹2.0 L
  • Construction of 30000 litre OHT at Goundampalayam of Annur Town

    Drinking waterConstruction of water tanks· Coimbatore· #51443

    ₹13.0 L Completed 22 Jan 2026Rec. 21 Nov 2023Paid ₹13.0 L
  • Construction of Anganwadi at Thirumuruganpooni of Avinashi Town

    Education & librariesConstruction of buildings for crèches and anganwadies· Tiruppur· #51456

    ₹13.0 L Completed 17 Dec 2025Rec. 21 Nov 2023Paid ₹13.0 L
  • Providing CC Road from Casino Junction to Cash Bazaar H/O Ooty Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· The Nilgiris· #55535

    ₹5.3 L Completed 24 Nov 2025Rec. 2 Dec 2023Paid ₹5.3 L
  • Construction of Retaining wall at Kil Koddappamund in Udhagamandalam Municipality

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· The Nilgiris· #59257

    ₹1.0 L Completed 24 Nov 2025Rec. 8 Dec 2023Paid ₹1.0 L
  • Providing CC footpath SC Colony at Elkhill in Udhagamandalam Municipality

    Roads & bridgesConstruction of footpaths and pedestrian ways· The Nilgiris· #59262

    ₹2.0 L Completed 24 Nov 2025Rec. 8 Dec 2023Paid ₹2.0 L
  • Providing Drain with Coverslab from Moorthi House to Ramesh Hoyuse at Jegathala TP

    Sanitation & drainageProviding drains and gutters for public drainage· The Nilgiris· #51525

    ₹5.0 L Completed 1 Sept 2025Rec. 21 Nov 2023Paid ₹5.0 L
  • Construction of Multipurpose Building at Yedakadu Naduhatty of Bikkatty TP

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· The Nilgiris· #51527

    ₹10.0 L Completed 1 Sept 2025Rec. 21 Nov 2023Paid ₹10.0 L
  • Construction of PD Shop at Neithalapuram (Neithalapuram Panchayat)

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Erode· #51437

    ₹14.7 L Completed 18 Aug 2025Rec. 21 Nov 2023Paid ₹14.7 L

17th Lok Sabha MPs from Tamil Nadu

Ranked by MP score

#MPUtilisationSpentCompletedScore
1A Ganeshamurthi · Erode100%100%10199
2Ganesan Selvam · Kancheepuram100%97%20697
3Dhanush M Kumar · Tenkasi100%99%21197
4S Gnanathiraviam · Tirunelveli97%94%9397
5Kanimozhi Karunanidhi · Thoothukkudi99%96%6297
6Thirumaa Valavan Thol · Chidambaram99%96%8196
7S Venkatesan · Madurai97%96%16596
8Kalanidhi Veeraswamy · Chennai North99%98%3296
9AKP Chinraj · Namakkal98%98%9396
10MK Vishnu Prasad · Arani100%100%10295
11TRVS Ramesh · Cuddalore96%89%11495
12M Selvaraj · Nagapattinam99%99%7695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.