Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

K Subbarayan

Lok SabhaCPITiruppur · Tamil Nadu

MP score76/10032nd of 542 in the 18th Lok Sabha
7th of 39 from Tamil Nadu
Also an MP in the 17th Lok Sabha Then: 91% utilisation, 72 works completed, score 94.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

94%

₹13.77 Cr recommended · 116 works
Above median (76%)

Paid to vendors

₹8.34 Cr

57% of allocation
Above median (37%)

Works completed

65

56% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP116 works

    ₹13.77 Cr · 94% of the ₹14.70 Cr allocated

  2. Sanctioned by the district76 works

    66% sanctioned · took 8.0 months on average (due within 45 days)

  3. Completed65 works

    ₹6.79 Cr final cost · 8.4 months from recommendation on average

40 works are still awaiting sanction, 40 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 116 works worth ₹13.77 Cr, a fund utilisation of 94%, higher than 80% of 18th Lok Sabha MPs.
  • The district has sanctioned 76 of them, taking 8.0 months on average.
  • ₹8.34 Cr has been paid to vendors, 57% of the allocation.
  • 65 works are complete, typically 8.4 months after recommendation. 58 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 41 vendors. The largest received 8.1%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 76/100: finishing works counts most

  1. Works completed 30%56Completed ÷ recommended works.
  2. Spending efficiency 20%81Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%94Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%89Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%57Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: EAGGLE EYE INFRASTRUCTURES, 8.1% of payments across 41 vendors.

District sanction speed

52/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%52Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

116 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of high mast light at Kanchikoil four-road junction, Kanchikoil town panchayat.

    Electricity & lightingLighting of public spaces· Erode· #280914

    ₹5.3 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Construction of an Anganwadi center in Sakthi Nagar Colony, Pallapalayam town panchayat.

    Education & librariesPurchase of equipment for crèches and anganwadies· Erode· #286117

    ₹15.0 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Installation of high mast light in K. Pudhur area, Kavundapadi panchayat.

    Electricity & lightingLighting of public spaces· Erode· #287177

    ₹5.3 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Construction of an overhead water storage tank with a capacity of 30,000 liters in Poonachi Panchayat, Anthiyur Taluk, Erode District.

    Drinking waterConstruction of water tanks· Erode· #300168

    ₹19.0 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Construction of concrete road on Kumaran Karadu Cross Streets 1, 2, 3, and 4 in Ward No. 03 of Kasipalayam Town Panchayat, Gobichettipalayam, Erode District.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Erode· #300170

    ₹6.5 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Construction of a compound wall for the Government Girls Higher Secondary School in T.N. Palayam union, Gobi taluk, Erode district.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Erode· #300178

    ₹57.9 L Awaiting sanction · 74 daysRec. 19 Aug 2026
  • Installation of a borewell and equipment in Pudhu colony, Ward 11, Tiruppur Corporation

    Drinking waterInstalling tube-wells and borewells· Tiruppur· #263324

    ₹5.5 L Physical Inspection · 23 Jul 2026Rec. 30 Jan 2026Paid ₹5.5 L
  • Installation of a submersible electric motor in the borewell located in the Thanneer Pandhal Colony West and Veerappa Chettiyar Nagar areas of Tiruppur Corporation 11th ward

    Drinking waterInstalling tube-wells and borewells· Tiruppur· #263328

    ₹2.0 L Physical Inspection · 23 Jul 2026Rec. 30 Jan 2026Paid ₹2.0 L
  • Supply of New Borewell at Ward no.11, K.P.S Street,Shastri Street, Tiruppur Corporation.

    Drinking waterInstalling tube-wells and borewells· Tiruppur· #138567

    ₹10.0 L Physical Inspection · 23 Jun 2026Rec. 3 Sep 2024Paid ₹10.0 L
  • Laying of a new BT road replacing the damaged BT road opposite Aruljothi Nagar A1 Bakery in A. Periyapalayam panchayat, Uthukuli taluk, Tiruppur district.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tiruppur· #280760

    ₹12.1 L Awaiting sanction · 135 daysRec. 19 Jun 2026
  • Laying of BT road from Samathuvapuram Road to Periyakadu Thottam in Ward 4, Tiruppur Corporation.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tiruppur· #280763

    ₹24.0 L Awaiting sanction · 135 daysRec. 19 Jun 2026
  • Construction of kitchen, dining area, and compound wall at the community welfare hall in Nallathupalayam, Ward 6, Tiruppur Corporation.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Tiruppur· #280765

    ₹50.0 L Awaiting sanction · 135 daysRec. 19 Jun 2026
  • Construction of a building for the K.1173 Kuruvarettiyur Kumaran Handloom Weavers Cooperative Production and Sales Society in Kuruvarettiyur, Ammapet union, Anthiyur taluk, Erode district.

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Erode· #280767

    ₹13.9 L Awaiting sanction · 135 daysRec. 19 Jun 2026
  • Laying of BT Road in Ward No.01, Senthampalayam kulathu Veethi 4 th Kurukku theru Salangapalayam town panchayat, Erode district.

    Safety & securityConstruction of Government office buildings (Post office, Police station, Police chauki, etc.)· Erode· #280769

    ₹16.0 L Awaiting sanction · 135 daysRec. 19 Jun 2026
  • Construction of an overhead water tank with a capacity of 10,000 liters at Channakuzhi in Ayalur village, Gobi taluk, Erode district.

    Drinking waterConstruction of water tanks· Erode· #280771

    ₹7.5 L Awaiting sanction · 135 daysRec. 19 Jun 2026

18th Lok Sabha MPs from Tamil Nadu

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Dr Rani Sri Kumar · Tenkasi88%66%11783
2V S Matheswaran · Namakkal79%62%15082
3Tharaniventhan M S · Arani94%67%20381
4Manickam Tagore B · Virudhunagar65%63%6980
5Ganesan Selvam · Kancheepuram91%59%27880
6CN Annadurai · Tiruvannamalai71%62%17579
7K Subbarayan · Tiruppur94%57%6576
8Gopinath K · Krishnagiri57%34%6776
9Robert Bruce C · Tirunelveli95%49%7676
10K E Prakash · Erode78%59%14175
11M.K. Vishnuprasad · Cuddalore70%53%7474
12Murasoli S · Thanjavur97%54%4874

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.