Payments concentrated with one vendor
63% of vendor payments went to MANNAT CONSTRUCTION.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
85%
₹12.54 Cr recommended · 204 works
Above median (76%)
Paid to vendors
₹9.10 Cr
62% of allocation
Above median (37%)
Works completed
151
74% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP204 works
₹12.54 Cr · 85% of the ₹14.70 Cr allocated
- Sanctioned by the district192 works
94% sanctioned · took 43 days on average (due within 45 days)
- Completed151 works
₹6.28 Cr final cost · 10.3 months from recommendation on average
12 works are still awaiting sanction, 1 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 204 works worth ₹12.54 Cr, a fund utilisation of 85%, higher than 66% of 18th Lok Sabha MPs.
- The district has sanctioned 192 of them, taking 43 days on average.
- ₹9.10 Cr has been paid to vendors, 62% of the allocation.
- 151 works are complete, typically 10.3 months after recommendation. 99 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 19 vendors. The largest received 63%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 69/100: finishing works counts most
- Works completed 30%74Completed ÷ recommended works.
- Spending efficiency 20%69Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%85Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%66Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%62Paid to vendors ÷ allocated limit.
- Vendor diversity 10%46How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MANNAT CONSTRUCTION, 63% of payments across 19 vendors.
District sanction speed
100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
204 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
BLOCK PISWAN KE GRAM PANCHAYAT HADIRA ME KARAN YADAV KE MAKAN SE SHRI RAM KE MAKAN TAK INTERLAKING NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323810
₹10.2 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026NAGAR PANCHAYAT BARWAR ME MOHALLA ROSHAN NAGAR ME C C ROAD KE AAGE SE GRAM PAIKIPUR KE MAJARA KIRARPUR FAKIRAPUR KI OR KHADANJA NIRNAM KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323822
₹31.5 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK MOHAMMDI KE GRAM MUNDAGALIB ME DESHRAJ KE MAKAN SE SOSAETY KI OR INTERLAKING AUR NALI NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323828
₹9.5 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK PASGAWAN KE GRAM SUKHWASA ME MOHAMMDI ROAD SE SRI KRASHAN YADAV KE MAKAN TAK INTERLAKING AUR NALI NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323833
₹7.7 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK PASGAWAN KE GRAM PANCHAYAT MOHAMMDPUR TAJPUR ME BAKKAULLA KE KHET SE SHUKHETA PUL KI OR KHADANJA NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323837
₹24.2 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK PASGWAN GRAM BARKERWA KE MAJRA SHANKARPUR ME PRADEEP VISHWAKARMA KE MAKAN SE MANOJ VISHWAKARMA KE MAKAN TAK INTERLOKING AUR NALI NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323841
₹3.0 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK MOHAMMDI KE GRAM PACHTAUR DEHUWA SAMPARK MARG PAR KHADANJA NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323842
₹30.2 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK PASGAWAN KE GRAM SAHAB GANJ GRANT KE MAJRA CHEDI PUR ME HABIB KE MAKAN SE RIYAJUL KE MAKAN TAK INTERLAKING AUR NALI NIRNAM KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323844
₹4.0 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK BEHJAM KE GRAM LAKHA KE MAJRA KODAIYA ME RAM KUMAR KE MAKAN SE RAM SAGAR KE MAKAN TAK INTERLAKING NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheri· #323846
₹5.0 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026BLOCK MAHOLI KE GRAM MUDAHUSA ME SHYAM SUNDER KE MAKAN SE DEVENDRA VERMA KE MAKAN TAK INTERLAKING AUR NALI NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323850
₹12.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026BLOCK PISWAN KE SEJKHURD ME GOVERDHAN LAL RATAURE KE MAKAN SE PURANI BAZAR TAK INTERLAKING AUR NALI NIRNAM KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323851
₹6.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026BLOCK PISWAN KE GRAM SARIYAPUR KE MAJRA RANGUEYA ME MAIN ROAD SE BABLU KE MAKAN TAK INTERLAKING AUR PULIYA NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323853
₹11.3 L Awaiting sanction · 10 daysRec. 22 Oct 2026BLOCK PISWAN KE GRAM SEJKHURD ME PASCHIM BAZAR SE SHIV MANDIR TAK INTERLAKING AUR NALI NIRMAN KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323854
₹14.6 L Awaiting sanction · 10 daysRec. 22 Oct 2026BLOCK MISHRIK KE GRAM TEDDWA ME PRATHMIK VIDYALAYA TEDDWA SE PYARE BHARGAWA KE GHAR TAK INTERLAKING KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323856
₹4.3 L Awaiting sanction · 10 daysRec. 22 Oct 2026BLOCK MISHRIK KE GRAM TEDDVA ME RAM RATAN KI DUKAN SE GURUPAL SINGH KE GHAR TAK INTERLAKING KARYA
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sitapur· #323857
₹9.1 L Awaiting sanction · 10 daysRec. 22 Oct 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.