Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Akhilesh Yadav

Lok SabhaSPKannauj · Uttar Pradesh

MP score51/100338th of 542 in the 18th Lok Sabha
60th of 80 from Uttar Pradesh
  • Works waiting for sanction

    132 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

96%

₹14.14 Cr recommended · 253 works
Above median (76%)

Paid to vendors

₹3.88 Cr

26% of allocation
Below median (37%)

Works completed

40

16% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP253 works

    ₹14.14 Cr · 96% of the ₹14.70 Cr allocated

  2. Sanctioned by the district119 works

    47% sanctioned · took 6.0 months on average (due within 45 days)

  3. Completed40 works

    ₹91.3 L final cost · 9.0 months from recommendation on average

134 works are still awaiting sanction, 132 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 253 works worth ₹14.14 Cr, a fund utilisation of 96%, higher than 85% of 18th Lok Sabha MPs.
  • The district has sanctioned 119 of them, taking 6.0 months on average.
  • ₹3.88 Cr has been paid to vendors, 26% of the allocation.
  • 40 works are complete, typically 9.0 months after recommendation. 40 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 29 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 51/100: finishing works counts most

  1. Works completed 30%16Completed ÷ recommended works.
  2. Spending efficiency 20%24Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%26Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MS BHARTIYA CONSTRUCTION, 21% of payments across 29 vendors.

District sanction speed

52/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%52Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

253 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • installation of a water cooler at Adarsh Bal Vikas Inter College Bhatpuri Road Kaimpur, Saurikh

    Drinking waterInstalling community drinking water plants· Kannauj· #283177

    ₹4.0 L Sanctioned · 7 Oct 2026Rec. 23 May 2026
  • Please find attached the list of 10 High Mask lights

    Electricity & lightingLighting of public spaces· Kannauj· #287586

    ₹23.2 L Sanctioned · 7 Oct 2026Rec. 20 Jun 2026
  • Please install 2 solar light and 1 high mask light

    Electricity & lightingLighting of public spaces· Kannauj· #288846

    ₹2.7 L Sanctioned · 7 Oct 2026Rec. 24 Jun 2026
  • please find attached the list of 29 solar light for 20000 each and high mask light of 232000 each

    Electricity & lightingLighting of public spaces· Kannauj· #294670

    ₹12.8 L Sanctioned · 7 Oct 2026Rec. 13 Jul 2026
  • 86 Meter cc road to be constructed from the house of satyam katiyaar to the house of pramod yadav

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannauj· #288833

    ₹13.8 L Sanctioned · 5 Oct 2026Rec. 24 Jun 2026
  • Construction of a CC road covering a distance of approximately 150 meters from the field of Shri Batham to the field of Shri Om Narayan in Village Daya ka Purva (Hamlet: Sisahi), Rasulabad Assembly Constituency, Kanpur Dehat District, Uttar Pradesh.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Dehat· #319741

    ₹12.0 L Awaiting sanction · 30 daysRec. 2 Oct 2026
  • Construction of a CC road from the main road to the house of Shri Sanju in village Daya ka Purva (hamlet of Sisahi), Rasoolabad Assembly constituency, Kanpur Dehat district, Uttar Pradesh approximate length 50 meters.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Dehat· #319742

    ₹4.0 L Awaiting sanction · 30 daysRec. 2 Oct 2026
  • PLease find attached the list of word 6 high mast lights and 12 solar lights to be installed

    Electricity & lightingLighting of public spaces· Auraiya· #293516

    ₹29.4 L Sanctioned · 28 Sept 2026Rec. 9 Jul 2026
  • Construction of a CC road approximately 170 meters in length and 3.40 meters in width extending from the house of Shri Rajendra Shankhwar to the house of Shri Laljit in Lagartha hamlet (part of Gram Sabha Malikpur Akaudiya, Tehsil Derapur, Assembly Constituency Rasulabad, District Kanpur Dehat, Uttar Pradesh.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Dehat· #314329

    ₹13.6 L Awaiting sanction · 51 daysRec. 11 Sep 2026
  • Construction of a CC road (approximately 260 meters in length and 3.70 meters in width) from the house of Shri Gauri Shankar Rajput to the house of Shri Vijay Singh in Gram Sabha Khanpur Rasulabad (Hamlet: Nauvan Purva), Tehsil Deshpur, District Kanpur Dehat, Uttar Pradesh.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Dehat· #314330

    ₹20.8 L Awaiting sanction · 51 daysRec. 11 Sep 2026
  • booth no 256 gram Dai Tala rawatpur From the house of Shri Siyaram to the house of radhey lal CC road construction 350 Meter Rajendra Bahadur Rajpoot 9415477854

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Dehat· #176848

    ₹24.5 L Sanctioned · 7 Sept 2026Rec. 21 Feb 2025
  • construction of a boundary wall for the Ambedkar Park located in Village Kava Block Airwa Katra Tehsil: Bidhuna, District: Auraiya, U.P.). The proposal for this has already been uploaded to the portal. Please take the necessary action.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Auraiya· #312668

    ₹5.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026
  • Construction of a CC road from the main road to Gandhi Park in Gram Sabha Bhadaipur, Development Block Airwa Katra, Vidhan Sabha constituency Bidhuna, District Auraiya, U.P. (approximate length: 200 meters).

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Auraiya· #312669

    ₹16.0 L Awaiting sanction · 57 daysRec. 5 Sep 2026
  • A solar light near the educational institution of Premanand Lok Kalyan Seva Samiti in Indargarh, Kannauj district, Uttar Pradesh.A solar light near the home of Shri Abhinay Mishra son of Shyam Shankar in village Haseran, Kannauj district Uttar Pradesh

    Electricity & lightingLighting of public spaces· Kannauj· #312670

    ₹40,200 Awaiting sanction · 57 daysRec. 5 Sep 2026
  • Please arrange for the installation of a water cooler (with RO) at Village Patti, Post Sakrava, District Kannauj, Uttar Pradesh.

    Drinking waterInstalling community drinking water plants· Kannauj· #312671

    ₹3.5 L Awaiting sanction · 57 daysRec. 5 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.