Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
89%
₹13.05 Cr recommended · 179 works
Above median (76%)
Paid to vendors
₹6.48 Cr
44% of allocation
Above median (37%)
Works completed
19
11% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP179 works
₹13.05 Cr · 89% of the ₹14.70 Cr allocated
- Sanctioned by the district121 works
68% sanctioned · took 7.4 months on average (due within 45 days)
- Completed19 works
₹1.46 Cr final cost · 11.8 months from recommendation on average
58 works are still awaiting sanction, 16 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 179 works worth ₹13.05 Cr, a fund utilisation of 89%, higher than 72% of 18th Lok Sabha MPs.
- The district has sanctioned 121 of them, taking 7.4 months on average.
- ₹6.48 Cr has been paid to vendors, 44% of the allocation.
- 19 works are complete, typically 11.8 months after recommendation. 6 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 24 vendors. The largest received 23%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 40/100: finishing works counts most
- Works completed 30%11Completed ÷ recommended works.
- Spending efficiency 20%23Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%89Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%32Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%44Paid to vendors ÷ allocated limit.
- Vendor diversity 10%96How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Lakshya Contruction, 23% of payments across 24 vendors.
District sanction speed
67/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%67Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
179 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Gram Kauniya me Shyamcharan ke makan se Mulli Ahirwar ke makan tak CC Road nirman hetu.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahoba· #293395
₹10.0 L Work partially Completed · 28 Oct 2026Rec. 9 Jul 2026Paid ₹6.0 LGram panchayat pahariya (mahoba) me narsingh ke bade se santram ke bade tak cc road nirman hetu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahoba· #293425
₹10.0 L Work partially Completed · 28 Oct 2026Rec. 9 Jul 2026Paid ₹6.0 LPanchayat Bhawan se Main Raod Ghutai Belataal Raod ki taraf 155 mtr CC Road Nirman Hetu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahoba· #286562
₹10.0 L Work partially Completed · 23 Oct 2026Rec. 18 Jun 2026Paid ₹6.0 LGram bachhechhar kalan me panchayat bhawan se Mahipat ke makan ki taraf 150 mtr CC nirman hetu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahoba· #296972
₹10.0 L Work partially Completed · 23 Oct 2026Rec. 19 Jul 2026Paid ₹6.0 LGram sabuwa me santosh kumar pandit ji ke ghar ke pass hand pump lagwane hetu
Drinking waterInstalling hand pumps· Mahoba· #317048
₹90,000 Awaiting sanction · 16 daysRec. 16 Oct 2026Gram Bapretha me Raghvendra rajput putra badriprasad ke ghar ke pass hand pump lagwane hetu
Drinking waterInstalling hand pumps· Mahoba· #317049
₹90,000 Awaiting sanction · 16 daysRec. 16 Oct 2026Gram Roshanpura me ratan singh Rajput putra mathura prasad ke ghar ke pass hand pump lagwane hetu
Drinking waterInstalling hand pumps· Mahoba· #317050
₹90,000 Awaiting sanction · 16 daysRec. 16 Oct 2026Charkhari Ramnagar me gaud baba sthan pr hand pump lagwane hetu
Drinking waterInstalling hand pumps· Mahoba· #317051
₹90,000 Awaiting sanction · 16 daysRec. 16 Oct 2026gram ajnar me NH road ke pass yatri Pratikshalaya nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321505
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram Indrahata me NH road ke pass yatri shade nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321506
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram Budhwara me tirahe m ke pass yatri shade nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321507
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram syavan me tirahe ke pass yatri shade nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321508
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram nagara dang me tirahe ke pass yatri shade nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321509
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram devaganpura me gate ke pass yatri shade nirman hetu
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Mahoba· #321510
₹8.1 L Awaiting sanction · 16 daysRec. 16 Oct 2026Gram kankua me main road se chetan ram ke makan ki taraf 63 mtr CC road nirman hetu
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahoba· #322119
₹3.5 L Awaiting sanction · 16 daysRec. 16 Oct 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.