Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Aditya Yadav

Lok SabhaSPBadaun · Uttar Pradesh

MP score61/100197th of 542 in the 18th Lok Sabha
39th of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

87%

₹12.77 Cr recommended · 161 works
Above median (76%)

Paid to vendors

₹9.90 Cr

67% of allocation
Above median (37%)

Works completed

50

31% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP161 works

    ₹12.77 Cr · 87% of the ₹14.70 Cr allocated

  2. Sanctioned by the district129 works

    80% sanctioned · took 2.6 months on average (due within 45 days)

  3. Completed50 works

    ₹4.42 Cr final cost · 12.1 months from recommendation on average

32 works are still awaiting sanction, 32 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 161 works worth ₹12.77 Cr, a fund utilisation of 87%, higher than 67% of 18th Lok Sabha MPs.
  • The district has sanctioned 129 of them, taking 2.6 months on average.
  • ₹9.90 Cr has been paid to vendors, 67% of the allocation.
  • 50 works are complete, typically 12.1 months after recommendation. 50 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 9 vendors. The largest received 32%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 61/100: finishing works counts most

  1. Works completed 30%31Completed ÷ recommended works.
  2. Spending efficiency 20%45Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%67Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    85
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Jagdish Narayan, 32% of payments across 9 vendors.

District sanction speed

85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

161 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • gram mubarikpur block rajpura me rajesh ke ghar se ajaypal singh ke ghar ki or lagbhag 100 meter cc road and nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #255692

    ₹11.4 L Completed 5 Oct 2026Rec. 5 Jan 2026Paid ₹11.4 L
  • gram raipur block gunnaur me kunwarpal ke ghar se chamunda se hote hue atar singh ke ghar tak lagbhag 112 meter cc road and nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #255694

    ₹11.1 L Completed 5 Oct 2026Rec. 5 Jan 2026Paid ₹11.1 L
  • gram bichpuri block gunnaur me bichpuri se ghar himmat ke ghar se suresh ke ghar tak lagbhag 115 meter cc road and nali nirman karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #255695

    ₹13.8 L Completed 5 Oct 2026Rec. 5 Jan 2026Paid ₹13.8 L
  • Shripal ke ghar se lochan ke ghar tak interlocking and nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159258

    ₹19.5 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹19.5 L
  • Prathmik Vidyalaya se Pappu anaar singh ke ghar tak interlocking and nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159261

    ₹14.4 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹14.4 L
  • karkora hathiram baba me main road se mandir tak cc&nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159262

    ₹13.7 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹13.7 L
  • Sunil ke makan se Rakesh ke Ghar tak cc & nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159266

    ₹6.2 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹6.2 L
  • Nagla Dumayal me Prempal ke Makan se Charan Singh ke makan tak cc & Nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159267

    ₹13.2 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹13.2 L
  • Isampur Danda me holi chauk se Devi mandir tak interlocking and nali nirman

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sambhal· #159269

    ₹24.7 L Completed 19 Sept 2026Rec. 18 Dec 2024Paid ₹24.7 L
  • gram nadha ke rajkiya inter collage ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313045

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • gram manpur ke choudhary lakhan singh memorial kanya inter collage ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313046

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • salarpur ke gram ghanvehti mein radha krishna mandir ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313047

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • seheswan ke ahmadnagar asoli mein shiv mandir ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313048

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • dehgawa ke khirkwadi bhud mein main chourahe kailas ke ghar ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313049

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • islamnagar ke gram bhawanipur mein masjid ke pas sheetal jal pyau

    Drinking waterInstalling community drinking water plants· Budaun· #313050

    ₹3.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.