Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Vivek Thakur

Lok SabhaBJPNawada · Bihar

MP score36/100466th of 542 in the 18th Lok Sabha
35th of 40 from Bihar
  • Works waiting for sanction

    42 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

  • Payments concentrated with one vendor

    73% of vendor payments went to ASSISTANT ENGINEER LAEO SHEIKHURA BARBIGHA.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

59%

₹8.64 Cr recommended · 96 works
Below median (76%)

Paid to vendors

₹1.90 Cr

13% of allocation
Below median (37%)

Works completed

6

6.3% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP96 works

    ₹8.64 Cr · 59% of the ₹14.70 Cr allocated

  2. Sanctioned by the district43 works

    45% sanctioned · took 44 days on average (due within 45 days)

  3. Completed6 works

    ₹57.0 L final cost · 4.8 months from recommendation on average

53 works are still awaiting sanction, 42 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 96 works worth ₹8.64 Cr, a fund utilisation of 59%, higher than 21% of 18th Lok Sabha MPs.
  • The district has sanctioned 43 of them, taking 44 days on average.
  • ₹1.90 Cr has been paid to vendors, 13% of the allocation.
  • 6 works are complete, typically 4.8 months after recommendation. 6 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 4 vendors. The largest received 73%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 36/100: finishing works counts most

  1. Works completed 30%6Completed ÷ recommended works.
  2. Spending efficiency 20%30Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%59Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%13Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    34
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ASSISTANT ENGINEER LAEO SHEIKHURA BARBIGHA, 73% of payments across 4 vendors.

District sanction speed

78/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%78Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

96 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Sheikhpura· #321932

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Sheikhpura· #321933

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Sheikhpura· #321934

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Zila Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #321937

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #321938

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #321939

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #321940

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #322098

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #322099

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #322100

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Setting up of PUSA STFR METER (Soil Testing and Fertilizer Recommendation Machine) in Prakhand Krishi Karyalay

    Education & librariesSetting up of soil testing laboratories· Nawada· #322101

    ₹1.5 L Awaiting sanction · 19 daysRec. 13 Oct 2026
  • Sheikhopur Sarai Block ke Gram Panchayat Onma ke Gram Onma mai school se Manoj Singh ke Dairy tak Soling aur PCC Road Nirman Karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sheikhpura· #285168

    ₹7.0 L Completed 10 Oct 2026Rec. 19 Jun 2026Paid ₹7.0 L
  • Gram Panchayat Onma ke Gram Chamarbigha mein Pul se Rajendra Ravidas ke ghar hote hue Raju Mistry ke ghar tak nali brick soling aur PCC Road Nirman Karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sheikhpura· #285170

    ₹15.0 L Completed 10 Oct 2026Rec. 19 Jun 2026Paid ₹15.0 L
  • Gram Panchayat Audhey ke Gram Gosaimadhi mein chhath ghat ka nirman karya

    Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Sheikhpura· #285181

    ₹8.5 L Completed 10 Oct 2026Rec. 19 Jun 2026Paid ₹8.5 L
  • Gram Panchayat kosra ke gram kosra mein ashok singh ke ghar se markandey singh ke dalan hote hue sanjay pandey ke ghar tak PCC Road Nirman Karya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sheikhpura· #285187

    ₹7.5 L Completed 10 Oct 2026Rec. 19 Jun 2026Paid ₹7.5 L

18th Lok Sabha MPs from Bihar

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Raj Bhushan Choudhary · Muzaffarpur97%81%8081
2Giridhari Yadav · Banka98%79%9481
3Rajesh Verma · Khagaria56%52%6779
4Jitan Ram Manjhi · Gaya77%46%19478
5Arun Bharti · Jamui92%74%27077
6Kaushalendra Kumar · Nalanda57%37%11876
7Smt Veena Devi · Vaishali100%89%3076
8Radha Mohan Singh · Purvi Champaran89%47%6874
9Vijaylakshmi Devi · Siwan97%95%9574
10Ravi Shankar Prasad · Patna Sahib48%40%6072
11Dr Mohammad Jawed · Kishanganj89%65%13072
12Ajay Kumar Mandal · Bhagalpur58%54%5971

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.