10th of 40 from Bihar
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
48%
₹7.03 Cr recommended · 85 works
Below median (76%)
Paid to vendors
₹5.81 Cr
40% of allocation
Above median (37%)
Works completed
60
71% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP85 works
₹7.03 Cr · 48% of the ₹14.70 Cr allocated
- Sanctioned by the district75 works
88% sanctioned · took 42 days on average (due within 45 days)
- Completed60 works
₹5.15 Cr final cost · 4.0 months from recommendation on average
10 works are still awaiting sanction, 10 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 85 works worth ₹7.03 Cr, a fund utilisation of 48%, higher than 11% of 18th Lok Sabha MPs.
- The district has sanctioned 75 of them, taking 42 days on average.
- ₹5.81 Cr has been paid to vendors, 40% of the allocation.
- 60 works are complete, typically 4.0 months after recommendation. 60 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 6 vendors. The largest received 45%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 72/100: finishing works counts most
- Works completed 30%71Completed ÷ recommended works.
- Spending efficiency 20%89Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%48Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%40Paid to vendors ÷ allocated limit.
- Vendor diversity 10%69How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: ASSISTANT ENGINEER DIGHA, 45% of payments across 6 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
85 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Earth filling, brick soling, and PCC construction work from the Bajrangbali Temple (Ward No. 8) to the Shahjola premises in Masadhi (Masadhi Panchayat, Fatuha Block), within the Fatuha Assembly constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290260
₹3.5 L Sanctioned · 18 Sept 2026Rec. 29 Jun 2026Underground drainage and earth filling work in Chandravanshi Tola, Daulatpur village (Masadhi Panchayat, Fatuha Block), within the Fatuha Assembly constituency.
Sanitation & drainageProviding drains and gutters for public drainage· Patna· #290261
₹3.5 L Sanctioned · 18 Sept 2026Rec. 29 Jun 2026Construction of a PCC road at the Government Middle School (Golghar Park) in Ward No. 27, within the Bankipur Assembly constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290257
₹7.0 L Sanctioned · 2 Sept 2026Rec. 29 Jun 2026Construct a drain and a PCC road from Road No. 18, Ward No. 6 (under the Digha Assembly constituency) to Yash Home.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #309993
₹13.0 L Awaiting sanction · 63 daysRec. 30 Aug 2026Construction work for a drainage channel and PCC road from Dr. Neeraj Prakashs residence to Bablu Singhs residence in Ward No. 12 of Fatehpur Panchayat, within the Fatuha Assembly Constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284368
₹2.0 L Sanctioned · 18 Jul 2026Rec. 29 May 2026Construction of a PCC road in Ward No. 13 of Fatehpur Panchayat, within the Fatuha Assembly Constituency extending from HS1 (Patna-Gaya Road) to the residence of Shambhu Chaudhary.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284369
₹6.0 L Sanctioned · 18 Jul 2026Rec. 29 May 2026Construction of a PCC road in Ward No. 34 of the Kumhrar Assembly constituency within the Patna Sahib Lok Sabha constituency spanning from House No. CA37 to CA40.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284364
₹6.0 L Sanctioned · 7 Jul 2026Rec. 29 May 2026Construction of a drainage channel and PCC road from the existing paved road to the end of the street in Ward No. 6, Road No. 24E, under the Digha Assembly Constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284580
₹5.0 L Sanctioned · 7 Jul 2026Rec. 29 May 2026Construction of a drainage system and PCC road in Ward No 1 Panchvati Colony Digha Assembly Constituency extending from Atal Path to Narayan Jhas residence via Manoj Kumar Sumans residence.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #284581
₹12.0 L Sanctioned · 7 Jul 2026Rec. 29 May 2026Construction of an underground drain from the Sri Brahmasthan Panchayat Temple (Dariyapur Gola) to the Shanidev Temple in Ward No. 40, within the Bankipur Assembly constituency.
Sanitation & drainageProviding drains and gutters for public drainage· Patna· #290245
₹2.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026Construction of a drain and a PCC road from Pawan Ji's house to the area in front of Anand Ji's house in Ward No. 70, within the Patna Sahib Lok Sabha constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290246
₹7.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026Construction of a PCC path from Anil Ji's house towards Vijay Ji's house in Badi Pahadi (Ward No. 56), within the Patna Sahib Lok Sabha constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290247
₹7.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026Construction of a PCC road from Yash Home to Omkar Jha's house in Ward No. 6, Road No. 18, within the Digha Assembly constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290253
₹13.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026Construction of a PCC road from the 'Dera' to Uday Ji's house in Ward No. 6, Road No. 18/24, within the Patna Sahib Lok Sabha constituency.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Patna· #290254
₹8.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026Construction of a boundary wall and a gate with a grille around the Chhoti Pahadi Bandra Griha Community Hall in Ward No. 56, within the Patna Sahib Assembly constituency.
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Patna· #290258
₹7.0 L Awaiting sanction · 125 daysRec. 29 Jun 2026
18th Lok Sabha MPs from Bihar
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Raj Bhushan Choudhary · Muzaffarpur | 97% | 81% | 80 | 81 |
| 2 | Giridhari Yadav · Banka | 98% | 79% | 94 | 81 |
| 3 | Rajesh Verma · Khagaria | 56% | 52% | 67 | 79 |
| 4 | Jitan Ram Manjhi · Gaya | 77% | 46% | 194 | 78 |
| 5 | Arun Bharti · Jamui | 92% | 74% | 270 | 77 |
| 6 | Kaushalendra Kumar · Nalanda | 57% | 37% | 118 | 76 |
| 7 | Smt Veena Devi · Vaishali | 100% | 89% | 30 | 76 |
| 8 | Radha Mohan Singh · Purvi Champaran | 89% | 47% | 68 | 74 |
| 9 | Vijaylakshmi Devi · Siwan | 97% | 95% | 95 | 74 |
| 10 | Ravi Shankar Prasad · Patna Sahib | 48% | 40% | 60 | 72 |
| 11 | Dr Mohammad Jawed · Kishanganj | 89% | 65% | 130 | 72 |
| 12 | Ajay Kumar Mandal · Bhagalpur | 58% | 54% | 59 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.