Skip to content
MPLADSTracker
NOM

MPLADS report card · Rajya Sabha

Shri V. Vijayendra Prasad

Rajya SabhaNOMNominatedTerm 2022–2028Andhra Pradesh

MP score60/10071st of 235 in the Rajya Sabha
4th of 12 from Andhra Pradesh

Allocated limit

₹19.61 Cr

Median ₹14.70 Cr

Fund utilisation

89%

₹17.49 Cr recommended · 198 works
Above median (70%)

Paid to vendors

₹9.94 Cr

51% of allocation
Above median (25%)

Works completed

79

40% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP198 works

    ₹17.49 Cr · 89% of the ₹19.61 Cr allocated

  2. Sanctioned by the district181 works

    91% sanctioned · took 2.9 months on average (due within 45 days)

  3. Completed79 works

    ₹6.87 Cr final cost · 7.2 months from recommendation on average

17 works are still awaiting sanction, 17 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 198 works worth ₹17.49 Cr, a fund utilisation of 89%, higher than 73% of Rajya Sabha MPs.
  • The district has sanctioned 181 of them, taking 2.9 months on average.
  • ₹9.94 Cr has been paid to vendors, 51% of the allocation.
  • 79 works are complete, typically 7.2 months after recommendation. 33 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 30 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 60/100: finishing works counts most

  1. Works completed 30%40Completed ÷ recommended works.
  2. Spending efficiency 20%69Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%89Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%42Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%51Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GOLLA SURESH KUMAR, 21% of payments across 30 vendors.

District sanction speed

89/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%89Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

199 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Community hall near Sitaramaanjaneya temple,Gopalpur,Hanamkonda

    Community buildings & public spacesConstruction of community centers and community halls· Hanumakonda· #189863

    ₹50.0 L Sanctioned · 29 Sept 2026Rec. 7 Apr 2025
  • Providing 10mt Octagonal Hi-Mast LED flood lights near goshala Sripada chaya Ashramam in Panchadevpad

    Electricity & lightingLighting of public spaces· Narayanpet· #296653

    ₹3.0 L Sanctioned · 26 Sept 2026Rec. 18 Jul 2026
  • Providing Granite flooring to steps 1st and 2nd floor of Community hall near Datta temple in Panchadevpad

    Community buildings & public spacesConstruction of community centers and community halls· Narayanpet· #296655

    ₹4.5 L Sanctioned · 26 Sept 2026Rec. 18 Jul 2026
  • Laying of CC Road from Telugu Balaiah plot to Gante Pedda Narasappa and Providing gate to school in Katrevpally

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Narayanpet· #296660

    ₹2.5 L Sanctioned · 26 Sept 2026Rec. 18 Jul 2026
  • Providing railing to steps and waranda to 1st and 2nd floor of Community hall near datta temple in Panchadevpad

    Community buildings & public spacesConstruction of community centers and community halls· Narayanpet· #296663

    ₹4.0 L Sanctioned · 26 Sept 2026Rec. 18 Jul 2026
  • Construction of Community CC Road from Peruru Rambabu house to peruru Venkata Satyanarayana house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #257646

    ₹4.9 L Completed 10 Sept 2026Rec. 6 Jan 2026Paid ₹4.9 L
  • Construction of Community CC Road from Peruru Venkata satyanarayana house to Indupalli Veera Venkata satayanarayana house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #257647

    ₹4.9 L Completed 10 Sept 2026Rec. 6 Jan 2026Paid ₹4.9 L
  • Construction of Community CC road from Indupalli Veera Venkata Satyanarayana house to Peruru Rambabu field

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #257648

    ₹4.9 L Completed 10 Sept 2026Rec. 6 Jan 2026Paid ₹4.9 L
  • Construction Community CC Road from Peruru Rambabu field to Pasupuleti Maha Laxmi Rao house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #257649

    ₹4.9 L Completed 10 Sept 2026Rec. 6 Jan 2026Paid ₹4.9 L
  • Construction of Community CC road from Pasupuleti Maha Laxmi rao house to Mamidisetti Nagaraju field

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dr. B.R. Ambedkar Konaseema· #257650

    ₹4.9 L Completed 10 Sept 2026Rec. 6 Jan 2026Paid ₹4.9 L
  • Supply and installation of 50 kw Grid connected Solar PV power Plant near Nandini Goshala trust

    Electricity & lightingImprovement of electricity distribution infrastructure· Narayanpet· #313889

    ₹30.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026
  • Supply and installation of 50 kw Grid connected Solar PV power plant near Sri pada chaya Ashramam trust

    Electricity & lightingImprovement of electricity distribution infrastructure· Narayanpet· #313898

    ₹25.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026
  • Construction of CC road, Side drain and slab converts at ward 2 and 8 at makthal municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Narayanpet· #312416

    ₹10.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026
  • Providing Brickwork, Plastering and other amenities to common workshed

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Narayanpet· #312425

    ₹10.0 L Awaiting sanction · 58 daysRec. 4 Sep 2026
  • Providing lifts, ACs and other amenities to Community hall near Datta Temple in panchadevpad

    Community buildings & public spacesConstruction of community centers and community halls· Narayanpet· #287166

    ₹50.0 L Sanctioned · 24 Aug 2026Rec. 19 Jun 2026

Rajya Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.