MPLADS report card · Rajya Sabha
Shri Meda Raghunadha Reddy
Rajya Sabha
YSRCPTerm 2024–2030Andhra Pradesh
1st of 12 from Andhra Pradesh
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
100%
₹14.65 Cr recommended · 253 works
Above median (70%)
Paid to vendors
₹8.46 Cr
58% of allocation
Above median (25%)
Works completed
111
44% of recommended
Above median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP253 works
₹14.65 Cr · 100% of the ₹14.70 Cr allocated
- Sanctioned by the district241 works
95% sanctioned · took 54 days on average (due within 45 days)
- Completed111 works
₹6.43 Cr final cost · 8.4 months from recommendation on average
12 works are still awaiting sanction, 12 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 253 works worth ₹14.65 Cr, a fund utilisation of 100%, higher than 95% of Rajya Sabha MPs.
- The district has sanctioned 241 of them, taking 54 days on average.
- ₹8.46 Cr has been paid to vendors, 58% of the allocation.
- 111 works are complete, typically 8.4 months after recommendation. 110 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 56 vendors. The largest received 7.9%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 74/100: finishing works counts most
- Works completed 30%44Completed ÷ recommended works.
- Spending efficiency 20%76Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%58Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SRI NELCO ENTERPRISES, 7.9% of payments across 56 vendors.
District sanction speed
96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
253 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Meeting Hall at Primary Health Center at Madhavaram Village of Tadepalligudem Mandal
Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· West Godavari· #290007
₹20.0 L Sanctioned · 7 Oct 2026Rec. 29 Jun 2026Road From Seethapuram H.W to Pitchigunta colony of Rachagudipalle Village, Vontimitta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300646
₹5.0 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of RO Plant and shed at Chintarajupalle Village, Vontimitta Mandal
Drinking waterInstalling community drinking water plants· Y.S.R. Kadapa· #300647
₹6.5 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of RO Plant and shed at Nadimpally (Vi), Vontimitta Mandal
Drinking waterInstalling community drinking water plants· Y.S.R. Kadapa· #300648
₹6.5 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of RO Plant and shed at Rachapally Village, Vontimitta Mandal
Drinking waterInstalling community drinking water plants· Y.S.R. Kadapa· #300649
₹6.5 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of RO Plant and shed at Gangaperooru Village, Vontimitta Mandal
Drinking waterInstalling community drinking water plants· Y.S.R. Kadapa· #300650
₹6.5 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of CC Drain from E. Narayana House to UP School at Ibrahimpet Village, Gangaperuru GP, Vontimitta Mandal
Sanitation & drainageProviding drains and gutters for public drainage· Y.S.R. Kadapa· #300651
₹5.0 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing of CC Road from Sachivalayam Back side to Main Road. Rachapally Village, Vontimitta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300653
₹8.0 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Providing CC Road from Dontarapally BT Road to Near to Gopal Swamy Temple at Dovantarapalli village, Gollappali GP, Pennaperuru, Vontimitta Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300654
₹5.0 L Sanctioned · 7 Oct 2026Rec. 7 Aug 2026Formation of the Slab Culvert at Gundu Subba Reddy Mango Garden of Nagireddypalli Grama Panchayat of Nandalur Mandal
Roads & bridgesConstruction of culverts and bridges· Y.S.R. Kadapa· #300658
₹4.8 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026Formation of the Slab Culvert at Isukupalli to Harijanawada of Nagireddypalli Grama Panchayat of Nandalur Mandal
Roads & bridgesConstruction of culverts and bridges· Y.S.R. Kadapa· #300659
₹4.8 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026Formation of metal Road from Bridge to Prathap Naidu Peddakona fields of Balarajupalli (V) in Rollamadugu Grama Panchayat of Rajampet Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300662
₹4.8 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026Formation of metal road from Reninthala Arundathi wada R.Buduguntapalli Panchayat CC Road to Temple Road to Reninthala Village of Rajampet Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300663
₹3.5 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026Formation of metal road from Bathulaiah Temple to Naramrajupalli gravel road to Sheshamambapuram Panchayat Balireddygaripalli (V) of Rajampet Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300664
₹4.0 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026Formation of metal road from Nayuni Nageswar Naidu agricultural fields to R&B road at Mittamedapalli Panchayat Mittamedapalli Village of Rajampet Mandal
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Y.S.R. Kadapa· #300665
₹4.0 L Sanctioned · 7 Oct 2026Rec. 6 Aug 2026
Rajya Sabha MPs from Andhra Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Meda Raghunadha Reddy | 100% | 58% | 111 | 74 |
| 2 | Shri Ryaga Krishnaiah | 90% | 41% | 35 | 69 |
| 3 | Shri Masthan Rao Yadav Beedha | 84% | 23% | 45 | 67 |
| 4 | Shri V. Vijayendra Prasad | 89% | 51% | 79 | 60 |
| 5 | Shri Yerram Venkata Subba Reddy | 68% | 26% | 38 | 50 |
| 6 | Shri Golla Baburao | 36% | 17% | 5 | 36 |
| 7 | Shri S Niranjan Reddy | 27% | 14% | 3 | 29 |
| 8 | Shri Paka Venkata Satyanarayana | 60% | 12% | 1 | 19 |
| 9 | Shri Vijay Chintakayala | 52% | 0% | 0 | 11 |
| 10 | Shri Sana Sathish Babu | 18% | 0% | 0 | 5 |
| 11 | Shri Bhashyam Rama Krishna | 16% | 0% | 0 | 4 |
| 12 | Shri Lingamaneni Ramesh | 13% | 0% | 0 | 3 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.