Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Masthan Rao Yadav Beedha

Rajya SabhaTDPTerm 2024–2028Andhra Pradesh

MP score67/10041st of 235 in the Rajya Sabha
3rd of 12 from Andhra Pradesh

Allocated limit

₹17.13 Cr

Median ₹14.70 Cr

Fund utilisation

84%

₹14.46 Cr recommended · 129 works
Above median (70%)

Paid to vendors

₹3.91 Cr

23% of allocation
Below median (25%)

Works completed

45

35% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP129 works

    ₹14.46 Cr · 84% of the ₹17.13 Cr allocated

  2. Sanctioned by the district124 works

    96% sanctioned · took 35 days on average (due within 45 days)

  3. Completed45 works

    ₹3.30 Cr final cost · 8.8 months from recommendation on average

5 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 129 works worth ₹14.46 Cr, a fund utilisation of 84%, higher than 68% of Rajya Sabha MPs.
  • The district has sanctioned 124 of them, taking 35 days on average.
  • ₹3.91 Cr has been paid to vendors, 23% of the allocation.
  • 45 works are complete, typically 8.8 months after recommendation. 43 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 30 vendors. The largest received 13%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 67/100: finishing works counts most

  1. Works completed 30%35Completed ÷ recommended works.
  2. Spending efficiency 20%84Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%23Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Chejarla Suresh Reddy, 13% of payments across 30 vendors.

District sanction speed

99/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%99Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

129 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Providing 80 Nos Bunker Beds to Social Welfare Girls Hostel No.1, Kavali, SPSR Nellore District

    Education & librariesPurchase of furniture and fixtures for educational purposes· Sri Potti Sriramulu Nellore· #316863

    ₹12.0 L Sanctioned · 13 Oct 2026Rec. 22 Sep 2026
  • Providing 80 Nos Bunker Beds to Social Welfare Girls Hostel No.2, Kavali, SPSR Nellore District

    Education & librariesPurchase of furniture and fixtures for educational purposes· Sri Potti Sriramulu Nellore· #316864

    ₹12.0 L Sanctioned · 13 Oct 2026Rec. 22 Sep 2026
  • Construction of Shed For RO Plant at Mangalapur Village in Mangalapur GP of Gudur Mandal, SPSR Nellore District

    Drinking waterInstalling community drinking water plants· Sri Potti Sriramulu Nellore· #301127

    ₹5.0 L Sanctioned · 12 Oct 2026Rec. 4 Aug 2026
  • Providing RO Plant machinery and Water Connection to RO Plant at Mangalapur Village in Mangalapur GP of Gudur Mandal

    Drinking waterInstalling community drinking water plants· Sri Potti Sriramulu Nellore· #301128

    ₹3.0 L Sanctioned · 12 Oct 2026Rec. 4 Aug 2026
  • Laying of internal CC road from Morla Ramanamma (H) to Morla Prasad Coconut Plantation in Gandavaram G.P of Kodavalur Mandal, SPSR Nellore District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #313938

    ₹5.0 L Sanctioned · 12 Oct 2026Rec. 10 Sep 2026
  • Providing RO Palnt in Gandurupalli(V) in Gilakapadu GP in Rapur Mandal, SPSR Nellore District

    Drinking waterInstalling community drinking water plants· Sri Potti Sriramulu Nellore· #316861

    ₹6.0 L Sanctioned · 12 Oct 2026Rec. 22 Sep 2026
  • Laying of Internal CC Road From Manam Venkateswarlu House to Badvel Subhashini House and Shaik Amerjan House to Shaik Sabhu Saheb House at Gandavaram GP of Kodavalur Mandal, SPSR Nellore District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sri Potti Sriramulu Nellore· #316862

    ₹4.0 L Sanctioned · 12 Oct 2026Rec. 22 Sep 2026
  • Construction of CC Road to Hindhu Smasana Vatika in Panduvva village of Undi Mandal, West Godavari District

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· West Godavari· #313936

    ₹11.0 L Sanctioned · 29 Sept 2026Rec. 10 Sep 2026
  • Augmentation of PWS Scheme to Andalamala of Konduru GP in Vakadu Mandal

    Drinking waterProviding supply pipelines for drinking water· Tirupati· #218000

    ₹5.0 L Completed 25 Sept 2026Rec. 14 Jul 2025Paid ₹5.0 L
  • Extension of Pipeline and providing new FHTCs to Andalamala of Konduru GP in Vakadu Mandal

    Drinking waterProviding supply pipelines for drinking water· Tirupati· #218001

    ₹5.0 L Completed 25 Sept 2026Rec. 14 Jul 2025Paid ₹5.0 L
  • Construction of Compound Wall to PHC Allipuram (2nd Division), in SPS Nellore District

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sri Potti Sriramulu Nellore· #313937

    ₹25.0 L Sanctioned · 24 Sept 2026Rec. 10 Sep 2026
  • Providing Borewell, Pumpset and RO Plant shelter for RO Plant in Tamidapadu Vilage of Katepalli GP in Vinjamur, SPSR Nelllore District

    Drinking waterInstalling community drinking water plants· Sri Potti Sriramulu Nellore· #316866

    ₹5.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026
  • Providing RO Plant Machinery in Tamidapadu village of Katepalli GP in Vinjamur Mandal, SPSR Nellore District

    Drinking waterInstalling community drinking water plants· Sri Potti Sriramulu Nellore· #316867

    ₹3.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026
  • Construction of Community Pial at Mahalakshmamma Temple in Upputuru (V), Nellore Rural (M)

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sri Potti Sriramulu Nellore· #200660

    ₹2.0 L Completed 19 Sept 2026Rec. 18 May 2025Paid ₹2.0 L
  • Construction of Community Pial at ST Colony of Kandamuru (V), Nellore Rural (M)

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sri Potti Sriramulu Nellore· #200666

    ₹3.9 L Completed 19 Sept 2026Rec. 18 May 2025Paid ₹3.9 L

Rajya Sabha MPs from Andhra Pradesh

Ranked by MP score

Compare

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.