Allocated limit
₹19.61 Cr
Median ₹14.70 Cr
Fund utilisation
95%
₹18.66 Cr recommended · 178 works
Above median (70%)
Paid to vendors
₹16.99 Cr
87% of allocation
Above median (25%)
Works completed
62
35% of recommended
Above median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP178 works
₹18.66 Cr · 95% of the ₹19.61 Cr allocated
- Sanctioned by the district145 works
81% sanctioned · took 3.3 months on average (due within 45 days)
- Completed62 works
₹7.60 Cr final cost · 16.3 months from recommendation on average
33 works are still awaiting sanction, 33 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 178 works worth ₹18.66 Cr, a fund utilisation of 95%, higher than 82% of Rajya Sabha MPs.
- The district has sanctioned 145 of them, taking 3.3 months on average.
- ₹16.99 Cr has been paid to vendors, 87% of the allocation.
- 62 works are complete, typically 16.3 months after recommendation. 53 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 131 vendors. The largest received 5.9%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 65/100: finishing works counts most
- Works completed 30%35Completed ÷ recommended works.
- Spending efficiency 20%45Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%95Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%82Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%87Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MS MANMOHAN SINGH KSHATRI, 5.9% of payments across 131 vendors.
District sanction speed
82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
180 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of community Hall in ward no.8 Dham Mohalla near Hinglaj Temple
Community buildings & public spacesConstruction of community centers and community halls· Panna· #289242
₹20.0 L Vendor Identification · 16 Sept 2026Rec. 25 Jun 2026Paid ₹12.0 LSetting up electric connection and installation of high tension electric lines in developmental block Shahpura
Electricity & lightingImprovement of electricity distribution infrastructure· Dindori· #315382
₹25.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026Construction of Culvert in village Bhattadeva near the school
Roads & bridgesConstruction of culverts and bridges· Damoh· #289237
₹15.0 L Vendor Identification · 4 Aug 2026Rec. 25 Jun 2026Paid ₹10.0 LConstruction of CC Road in Village Deori from PWD road to Shantidham
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #293122
₹25.0 L Vendor Identification · 3 Aug 2026Rec. 8 Jul 2026Paid ₹24.0 LConstruction of Link Road in GP Kulhor near the house of Jagdish towards the main road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #293119
₹10.0 L Physical Inspection · 29 Jul 2026Rec. 8 Jul 2026Paid ₹10.0 LCC Road construction in Gram Panchayat Luhari khasra no 58/1
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #293120
₹25.0 L Vendor Identification · 28 Jul 2026Rec. 8 Jul 2026Paid ₹24.1 LConnectivity road from Sadar Banjare's house towards Kadarpura village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guna· #289248
₹20.0 L Vendor Identification · 24 Jul 2026Rec. 25 Jun 2026Paid ₹10.0 LConstruction of connecting road in village dolatpura to the farmland o Hakam
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283872
₹10.0 L Work partially Completed · 9 Jul 2026Rec. 26 May 2026Paid ₹7.0 LConstruction of connecting road in GP Mani Khedi in Village Kalapeepal (From the house of Ratan towards Bagasi Jod)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283876
₹10.0 L Work partially Completed · 9 Jul 2026Rec. 26 May 2026Paid ₹7.0 LConstruction of link road with drainage in village Bhidari Khurd approach road to GP Bhidari Khurd
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #283902
₹10.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹8.0 LConstruction of drain using RCC hume Pipe from the house of the Kanju Choudhary towards the house of Jyoti Choubey in GP Sukha
Sanitation & drainageProviding drains and gutters for public drainage· Jabalpur· #283916
₹15.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹14.0 LConstruction of Drainage - RCC Hume Pipe from the house of Prabhu Gond to the house of Balram Gond
Sanitation & drainageProviding drains and gutters for public drainage· Jabalpur· #283918
₹20.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹19.0 LConstruction of CC Road from the house of Tikaram Yadav to the house of Kapil Tiwari
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #283920
₹15.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹14.0 LConstruction of Culvert in GP Arjunkhedi on the drain inside the village
Roads & bridgesConstruction of culverts and bridges· Bhopal· #283698
₹10.0 L Work partially Completed · 29 Jun 2026Rec. 25 May 2026Paid ₹7.0 LDevelopment of connecting road in village Chatahedi from main road to Himmat Baba . Gram Panchayat - Chatahedi, Janpad - Berasia
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283697
₹20.0 L Physical Inspection · 25 Jun 2026Rec. 25 May 2026Paid ₹20.0 L
Rajya Sabha MPs from Madhya Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr. Kavita Patidar | 86% | 68% | 145 | 73 |
| 2 | Smt. Sumitra Balmik | 95% | 87% | 62 | 65 |
| 3 | Shri Vivek K. Tankha | 86% | 54% | 127 | 55 |
| 4 | Shri Balyogi Umeshnath | 58% | 33% | 12 | 45 |
| 5 | Smt. Maya Naroliya | 78% | 52% | 16 | 43 |
| 6 | Shri Banshilal Gurjar | 42% | 32% | 10 | 42 |
| 7 | Shri Ashok Singh | 36% | 13% | 13 | 32 |
| 8 | Shri Rajneesh Kumar Agrawal | 18% | 0% | 0 | 5 |
| 9 | Shri Mahesh Kewat | 0% | 0% | 0 | 0 |
| 10 | Shri Tarun Chugh | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.