Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Smt. Sumitra Balmik

Rajya SabhaBJPTerm 2022–2028Madhya Pradesh

MP score65/10047th of 235 in the Rajya Sabha
2nd of 10 from Madhya Pradesh

Allocated limit

₹19.61 Cr

Median ₹14.70 Cr

Fund utilisation

95%

₹18.66 Cr recommended · 178 works
Above median (70%)

Paid to vendors

₹16.99 Cr

87% of allocation
Above median (25%)

Works completed

62

35% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP178 works

    ₹18.66 Cr · 95% of the ₹19.61 Cr allocated

  2. Sanctioned by the district145 works

    81% sanctioned · took 3.3 months on average (due within 45 days)

  3. Completed62 works

    ₹7.60 Cr final cost · 16.3 months from recommendation on average

33 works are still awaiting sanction, 33 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 178 works worth ₹18.66 Cr, a fund utilisation of 95%, higher than 82% of Rajya Sabha MPs.
  • The district has sanctioned 145 of them, taking 3.3 months on average.
  • ₹16.99 Cr has been paid to vendors, 87% of the allocation.
  • 62 works are complete, typically 16.3 months after recommendation. 53 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 131 vendors. The largest received 5.9%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 65/100: finishing works counts most

  1. Works completed 30%35Completed ÷ recommended works.
  2. Spending efficiency 20%45Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%95Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%82Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%87Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MS MANMOHAN SINGH KSHATRI, 5.9% of payments across 131 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

180 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of community Hall in ward no.8 Dham Mohalla near Hinglaj Temple

    Community buildings & public spacesConstruction of community centers and community halls· Panna· #289242

    ₹20.0 L Vendor Identification · 16 Sept 2026Rec. 25 Jun 2026Paid ₹12.0 L
  • Setting up electric connection and installation of high tension electric lines in developmental block Shahpura

    Electricity & lightingImprovement of electricity distribution infrastructure· Dindori· #315382

    ₹25.0 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Construction of Culvert in village Bhattadeva near the school

    Roads & bridgesConstruction of culverts and bridges· Damoh· #289237

    ₹15.0 L Vendor Identification · 4 Aug 2026Rec. 25 Jun 2026Paid ₹10.0 L
  • Construction of CC Road in Village Deori from PWD road to Shantidham

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #293122

    ₹25.0 L Vendor Identification · 3 Aug 2026Rec. 8 Jul 2026Paid ₹24.0 L
  • Construction of Link Road in GP Kulhor near the house of Jagdish towards the main road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #293119

    ₹10.0 L Physical Inspection · 29 Jul 2026Rec. 8 Jul 2026Paid ₹10.0 L
  • CC Road construction in Gram Panchayat Luhari khasra no 58/1

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #293120

    ₹25.0 L Vendor Identification · 28 Jul 2026Rec. 8 Jul 2026Paid ₹24.1 L
  • Connectivity road from Sadar Banjare's house towards Kadarpura village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Guna· #289248

    ₹20.0 L Vendor Identification · 24 Jul 2026Rec. 25 Jun 2026Paid ₹10.0 L
  • Construction of connecting road in village dolatpura to the farmland o Hakam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283872

    ₹10.0 L Work partially Completed · 9 Jul 2026Rec. 26 May 2026Paid ₹7.0 L
  • Construction of connecting road in GP Mani Khedi in Village Kalapeepal (From the house of Ratan towards Bagasi Jod)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283876

    ₹10.0 L Work partially Completed · 9 Jul 2026Rec. 26 May 2026Paid ₹7.0 L
  • Construction of link road with drainage in village Bhidari Khurd approach road to GP Bhidari Khurd

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #283902

    ₹10.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹8.0 L
  • Construction of drain using RCC hume Pipe from the house of the Kanju Choudhary towards the house of Jyoti Choubey in GP Sukha

    Sanitation & drainageProviding drains and gutters for public drainage· Jabalpur· #283916

    ₹15.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹14.0 L
  • Construction of Drainage - RCC Hume Pipe from the house of Prabhu Gond to the house of Balram Gond

    Sanitation & drainageProviding drains and gutters for public drainage· Jabalpur· #283918

    ₹20.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹19.0 L
  • Construction of CC Road from the house of Tikaram Yadav to the house of Kapil Tiwari

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jabalpur· #283920

    ₹15.0 L Vendor Identification · 30 Jun 2026Rec. 26 May 2026Paid ₹14.0 L
  • Construction of Culvert in GP Arjunkhedi on the drain inside the village

    Roads & bridgesConstruction of culverts and bridges· Bhopal· #283698

    ₹10.0 L Work partially Completed · 29 Jun 2026Rec. 25 May 2026Paid ₹7.0 L
  • Development of connecting road in village Chatahedi from main road to Himmat Baba . Gram Panchayat - Chatahedi, Janpad - Berasia

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhopal· #283697

    ₹20.0 L Physical Inspection · 25 Jun 2026Rec. 25 May 2026Paid ₹20.0 L

Rajya Sabha MPs from Madhya Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Dr. Kavita Patidar86%68%14573
2Smt. Sumitra Balmik95%87%6265
3Shri Vivek K. Tankha86%54%12755
4Shri Balyogi Umeshnath58%33%1245
5Smt. Maya Naroliya78%52%1643
6Shri Banshilal Gurjar42%32%1042
7Shri Ashok Singh36%13%1332
8Shri Rajneesh Kumar Agrawal18%0%05
9Shri Mahesh Kewat0%0%00
10Shri Tarun Chugh0%0%00

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.