Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Ashok Singh

Rajya SabhaINCTerm 2024–2030Madhya Pradesh

MP score32/100142nd of 235 in the Rajya Sabha
7th of 10 from Madhya Pradesh
  • Works waiting for sanction

    49 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

36%

₹5.32 Cr recommended · 115 works
Below median (70%)

Paid to vendors

₹1.90 Cr

13% of allocation
Below median (25%)

Works completed

13

11% of recommended
Below median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP115 works

    ₹5.32 Cr · 36% of the ₹14.70 Cr allocated

  2. Sanctioned by the district44 works

    38% sanctioned · took 4.1 months on average (due within 45 days)

  3. Completed13 works

    ₹61.5 L final cost · 9.7 months from recommendation on average

71 works are still awaiting sanction, 49 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 115 works worth ₹5.32 Cr, a fund utilisation of 36%, higher than 26% of Rajya Sabha MPs.
  • The district has sanctioned 44 of them, taking 4.1 months on average.
  • ₹1.90 Cr has been paid to vendors, 13% of the allocation.
  • 13 works are complete, typically 9.7 months after recommendation. 5 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 39 vendors. The largest received 9.9%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 32/100: finishing works counts most

  1. Works completed 30%11Completed ÷ recommended works.
  2. Spending efficiency 20%32Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%36Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%38Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%13Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: GRAM PANCHAYAT AMODA, 9.9% of payments across 39 vendors.

District sanction speed

66/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%66Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

121 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of boundary walls of Muktidham Gram Patewari gram Panchayat Patewari janpad panchayat pohari district shivpuri

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Shivpuri· #279740

    ₹5.0 L Completed 30 Oct 2026Rec. 6 May 2026Paid ₹5.0 L
  • Construction of CC roads at Gram Nurabad bangali colony gram panchayat nurabad janpad panchayat morena District Morena

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Morena· #284200

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 28 May 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Shivpuri· #324923

    ₹1.9 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #324926

    ₹1.9 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Installation New Transformer

    Electricity & lightingSetting up public non-conventional energy plants· Gwalior· #324962

    ₹3.0 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322327

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322336

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322337

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322339

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322342

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322344

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322346

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322348

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322351

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026
  • GI WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTER PUMP AND 900x20 NEW TYRES MODEL -12

    Drinking waterPurchase of mobile water tankers· Gwalior· #322353

    ₹1.9 L Awaiting sanction · 10 daysRec. 22 Oct 2026

Rajya Sabha MPs from Madhya Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Dr. Kavita Patidar86%68%14573
2Smt. Sumitra Balmik95%87%6265
3Shri Vivek K. Tankha86%54%12755
4Shri Balyogi Umeshnath58%33%1245
5Smt. Maya Naroliya78%52%1643
6Shri Banshilal Gurjar42%32%1042
7Shri Ashok Singh36%13%1332
8Shri Rajneesh Kumar Agrawal18%0%05
9Shri Mahesh Kewat0%0%00
10Shri Tarun Chugh0%0%00

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.