Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
42%
₹6.22 Cr recommended · 85 works
Below median (70%)
Paid to vendors
₹4.74 Cr
32% of allocation
Above median (25%)
Works completed
10
12% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP85 works
₹6.22 Cr · 42% of the ₹14.70 Cr allocated
- Sanctioned by the district72 works
85% sanctioned · took 3.1 months on average (due within 45 days)
- Completed10 works
₹1.06 Cr final cost · 13.0 months from recommendation on average
13 works are still awaiting sanction, 10 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 85 works worth ₹6.22 Cr, a fund utilisation of 42%, higher than 29% of Rajya Sabha MPs.
- The district has sanctioned 72 of them, taking 3.1 months on average.
- ₹4.74 Cr has been paid to vendors, 32% of the allocation.
- 10 works are complete, typically 13.0 months after recommendation. 10 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 21 vendors. The largest received 28%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 42/100: finishing works counts most
- Works completed 30%12Completed ÷ recommended works.
- Spending efficiency 20%22Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%42Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%32Paid to vendors ÷ allocated limit.
- Vendor diversity 10%90How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: CEO JANPAD PANCHAYAT MANDSAUR, 28% of payments across 21 vendors.
District sanction speed
87/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%87Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
85 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of a community tin shed near the school in Village Pirana, Bamori (refer to attached letter).
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Neemuch· #299204
₹8.0 L Sanctioned · 29 Oct 2026Rec. 27 Jul 2026word as attached letter Construction of a public tin shed near the Balaji Temple
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Neemuch· #317483
₹5.0 L Time Estimation · 28 Oct 2026Rec. 23 Sep 2026Construction of a culvert (construction of a culvert leading to the Harijan settlement, starting from Ghanshyam Adivasi's location)
Roads & bridgesConstruction of culverts and bridges· Bhopal· #285270
₹5.0 L Time Estimation · 8 Oct 2026Rec. 16 Jul 2026Construction of a public shed near the Balaji Mandir complex in Bhuniyakhedi village (work as per the attached letter)
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299175
₹7.0 L Vendor Identification · 28 Sept 2026Rec. 27 Jul 2026Paid ₹3.5 LConstruction of public tin sheds work as attached letter
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #303342
₹10.0 L Vendor Identification · 28 Sept 2026Rec. 12 Aug 2026Paid ₹5.0 LCC road construction (from Damarlal-ji's house to the Bawdi Puliya road), Dhariyakhedi village.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mandsaur· #303344
₹5.0 L Vendor Identification · 28 Sept 2026Rec. 12 Aug 2026Paid ₹2.5 LHigh-mast electric lights at the Semalyakaji and Jhaval intersections, and a high-mast light at Bada Ganpati Chowk in Satlakheda
Electricity & lightingStreet lights· Mandsaur· #317561
₹1.8 L Awaiting sanction · 38 daysRec. 24 Sep 2026as attached letter
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #279707
₹7.0 L Vendor Identification · 23 Sept 2026Rec. 6 May 2026Paid ₹3.5 LConstruction of community tin sheds work as attached letter
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299167
₹7.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹3.5 LCommunity Tin Shed Construction Village Jhawal work as attached letter
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299169
₹10.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹5.0 LConstruction of a cremation shed at the cremation ground near the mine in Village Daukhedi (as per the attached letter)
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299171
₹2.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹1.0 LConstruction of a community shed near the Balaji Temple complex in Village Mohammadpura (as per the attached letter).
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299172
₹5.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹2.5 LConstruction of a public shed at the cremation ground in Village Revas Devda (as per the attached letter).
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299174
₹4.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹2.0 LCommunity Shed Construction Village Changli
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299177
₹4.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹2.0 LConstruction of Community Tin Shed in Village Jhakarda (Work as per attached letter)
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Mandsaur· #299182
₹5.0 L Vendor Identification · 23 Sept 2026Rec. 27 Jul 2026Paid ₹2.5 L
Rajya Sabha MPs from Madhya Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr. Kavita Patidar | 86% | 68% | 145 | 73 |
| 2 | Smt. Sumitra Balmik | 95% | 87% | 62 | 65 |
| 3 | Shri Vivek K. Tankha | 86% | 54% | 127 | 55 |
| 4 | Shri Balyogi Umeshnath | 58% | 33% | 12 | 45 |
| 5 | Smt. Maya Naroliya | 78% | 52% | 16 | 43 |
| 6 | Shri Banshilal Gurjar | 42% | 32% | 10 | 42 |
| 7 | Shri Ashok Singh | 36% | 13% | 13 | 32 |
| 8 | Shri Rajneesh Kumar Agrawal | 18% | 0% | 0 | 5 |
| 9 | Shri Mahesh Kewat | 0% | 0% | 0 | 0 |
| 10 | Shri Tarun Chugh | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.