Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
58%
₹8.45 Cr recommended · 80 works
Below median (70%)
Paid to vendors
₹4.80 Cr
33% of allocation
Above median (25%)
Works completed
12
15% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP80 works
₹8.45 Cr · 58% of the ₹14.70 Cr allocated
- Sanctioned by the district66 works
83% sanctioned · took 2.1 months on average (due within 45 days)
- Completed12 works
₹85.5 L final cost · 7.2 months from recommendation on average
14 works are still awaiting sanction, 11 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 80 works worth ₹8.45 Cr, a fund utilisation of 58%, higher than 38% of Rajya Sabha MPs.
- The district has sanctioned 66 of them, taking 2.1 months on average.
- ₹4.80 Cr has been paid to vendors, 33% of the allocation.
- 12 works are complete, typically 7.2 months after recommendation. 12 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Community buildings & public spaces.
- Payments went to 54 vendors. The largest received 7.3%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 45/100: finishing works counts most
- Works completed 30%15Completed ÷ recommended works.
- Spending efficiency 20%18Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%33Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: UJJAIN SMART CITY LTD, 7.3% of payments across 54 vendors.
District sanction speed
90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
80 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
ujjain nagar ke ward no 12 gousewa kunj ranjeet hanuman shiprapura ujjain ke samne road ke dusari taraf nalkoop khanan moter pump starter keval sahit
Drinking waterInstalling tube-wells and borewells· Ujjain· #322583
₹2.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026Madhav samaj kalyan shikshan samiti dwara sanchalit saraswati shishu mandir hs school me additional room nirman
Education & librariesConstruction of rooms and halls in school and colleges· Ujjain· #321925
₹10.0 L Awaiting sanction · 19 daysRec. 13 Oct 2026Ward no.9 Valmiki colony Sarangpur district Rajgarh me samudayik bhawan ke pratham tal per kaksha shouchalay bathroom nirman
Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Rajgarh· #320396
₹10.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Gram Karadwas me main road se banesingh ke ghar tak cement concrit road nirman
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #270355
₹6.0 L Completed 3 Sept 2026Rec. 23 Feb 2026Paid ₹6.0 LUjjain nagar ke ward no.5 me ekta convent school ke samne 1 nalkoop khanan moterpump starter kebal sahit
Drinking waterInstalling tube-wells and borewells· Ujjain· #311493
₹2.5 L Awaiting sanction · 60 daysRec. 2 Sep 2026Ujjain nagar ke ward 1 me chak bhitari colony me mojamkhedi ke kakad per sarvajanik nalkoop khanan moter pump starter kebal sahit
Drinking waterInstalling tube-wells and borewells· Ujjain· #311494
₹2.5 L Awaiting sanction · 60 daysRec. 2 Sep 2026Sadhvi sugnabaisa wellfaire foundation 03 gousewa kunj shiprapura ward 12 ki goushala me pashuo ke liye ashray gruh nirman
Agriculture & animal careConstruction of shelters for animals· Ujjain· #311495
₹20.0 L Awaiting sanction · 60 daysRec. 2 Sep 2026Gram panchayat karwa khedi janpad alot nathji ashram se MPEB road tak cement concrit road nirman
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ratlam· #294758
₹20.0 L Sanctioned · 10 Aug 2026Rec. 13 Jul 2026Gram karwakhedi janpad alot me nathji ashram ke pass shaskiya bhumi per peyjal hetu nalkoop khanan moterpump starter kebal sahit
Drinking waterInstalling tube-wells and borewells· Ratlam· #294757
₹2.5 L Sanctioned · 6 Aug 2026Rec. 13 Jul 2026Gram Khajuriya sadar me main road se shantidham tak cement concrit road nirman
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #257948
₹10.0 L Vendor Identification · 6 Jul 2026Rec. 8 Jan 2026Paid ₹6.0 LUjjain jhone 3 ward 25 chamunda mata mandir ke pichhe pol and adhunik street light sthapna
Electricity & lightingStreet lights· Ujjain· #257952
₹27.0 L Vendor Identification · 3 Jul 2026Rec. 8 Jan 2026Paid ₹15.0 LOutside R.D.Gardi medical college ujjain me 1 nalkoop khanan moterpump starter kebal sahit
Drinking waterInstalling tube-wells and borewells· Ujjain· #230121
₹2.5 L Vendor Identification · 22 Jun 2026Rec. 29 Aug 2025Paid ₹2.0 LGram devrundi gram panchayat baloda koran me pashuo ke liye ashray gruh nirman Devnarayan goushala
Agriculture & animal careConstruction of shelters for animals· Ujjain· #285778
₹12.0 L Awaiting sanction · 139 daysRec. 15 Jun 2026Gram narwar sc mohalla sanvariya nagar me samudayik samanya karya shed nirman
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ujjain· #263023
₹10.0 L Vendor Identification · 12 Jun 2026Rec. 29 Jan 2026Paid ₹6.0 Ljhone kramank 03 ward no.33 jaysinghpura me jagdish sharma ke makan se jitendra choudhari ke makan tak cement concrit road nirman
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ujjain· #283692
₹10.0 L Awaiting sanction · 160 daysRec. 25 May 2026
Rajya Sabha MPs from Madhya Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr. Kavita Patidar | 86% | 68% | 145 | 73 |
| 2 | Smt. Sumitra Balmik | 95% | 87% | 62 | 65 |
| 3 | Shri Vivek K. Tankha | 86% | 54% | 127 | 55 |
| 4 | Shri Balyogi Umeshnath | 58% | 33% | 12 | 45 |
| 5 | Smt. Maya Naroliya | 78% | 52% | 16 | 43 |
| 6 | Shri Banshilal Gurjar | 42% | 32% | 10 | 42 |
| 7 | Shri Ashok Singh | 36% | 13% | 13 | 32 |
| 8 | Shri Rajneesh Kumar Agrawal | 18% | 0% | 0 | 5 |
| 9 | Shri Mahesh Kewat | 0% | 0% | 0 | 0 |
| 10 | Shri Tarun Chugh | 0% | 0% | 0 | 0 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.