MPLADS report card · 18th Lok Sabha

Sudhakar Singh

Lok SabhaRJDBuxar · Bihar

MP score64/100167th of 542 in the 18th Lok Sabha
25th of 40 from Bihar

Allocated limit

₹18.52 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹18.50 Cr recommended · 207 works
Above median (76%)

Paid to vendors

₹13.28 Cr

72% of allocation
Above median (37%)

Works completed

98

47% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP207 works

    ₹18.50 Cr · 100% of the ₹18.52 Cr allocated

  2. Sanctioned by the district155 works

    75% sanctioned · took 2.9 months on average (due within 45 days)

  3. Completed98 works

    ₹9.72 Cr final cost · 7.4 months from recommendation on average

52 works are still awaiting sanction, 49 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 207 works worth ₹18.50 Cr, a fund utilisation of 100%, higher than 98% of 18th Lok Sabha MPs.
  • The district has sanctioned 155 of them, taking 2.9 months on average.
  • ₹13.28 Cr has been paid to vendors, 72% of the allocation.
  • 98 works are complete, typically 7.4 months after recommendation. 29 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Sports & fitness.
  • Payments went to 11 vendors. The largest received 32%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 64/100: finishing works counts most

  1. Works completed 30%47Completed ÷ recommended works.
  2. Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%30Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%72Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    85
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ASSISTANT ENGINEER RAMGARH, 32% of payments across 11 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

207 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Install tube-well infront of mahadev a2z at Baraura

    Drinking waterInstalling tube-wells and borewells· Kaimur· #325001

    ₹2.4 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Construction of toilet and bathroom with nali at Mahuar Stadium

    Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #283429

    ₹14.9 L Sanctioned · 28 Oct 2026Rec. 24 May 2026
  • Development of Playfield at Pipria

    Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #283010

    ₹1.0 L Sanctioned · 23 Oct 2026Rec. 24 May 2026
  • Install Tubewell near RadhaRani Gaushala at Udhpura, Durgawati

    Drinking waterInstalling tube-wells and borewells· Kaimur· #323778

    ₹2.4 L Awaiting sanction · 11 daysRec. 21 Oct 2026
  • Additional Work for the Construction of a Platform at a Public Place Beside the Bridge in Bahpura

    Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Kaimur· #323779

    ₹2.7 L Awaiting sanction · 11 daysRec. 21 Oct 2026
  • Construction of boundry wall of community building at Khamidaura

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kaimur· #289958

    ₹4.5 L Sanctioned · 16 Oct 2026Rec. 29 Jun 2026
  • Install Tubewell at GNM training centre old sadar hospital campus, buxar

    Drinking waterInstalling tube-wells and borewells· Buxar· #315789

    ₹3.0 L Sanctioned · 30 Sept 2026Rec. 17 Sep 2026
  • Construction of road from Ambedkar chauk-Nai Bazar road to aashirvad marriage hall

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292383

    ₹15.0 L Sanctioned · 17 Sept 2026Rec. 6 Jul 2026
  • Install high mast light near Dinara Hospital

    Electricity & lightingStreet lights· Rohtas· #280923

    ₹7.0 L Sanctioned · 14 Sept 2026Rec. 15 May 2026
  • Construction of road from Itadhi-Buxar road to Santosh Yadav house at Hukaha

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292382

    ₹15.0 L Physical Inspection · 3 Sept 2026Rec. 6 Jul 2026Paid ₹15.0 L
  • Beautification of existing Community hall(Turha Bhawan) at Brahmpur Ward no-9

    Community buildings & public spacesConstruction of community centers and community halls· Buxar· #292384

    ₹8.0 L Sanctioned · 3 Sept 2026Rec. 6 Jul 2026
  • Construction of PCC from Rajendra prasad singh house to late rajendra sipahi house via saroj kumar singh house at Sikraul

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #289155

    ₹10.0 L Physical Inspection · 19 Aug 2026Rec. 25 Jun 2026Paid ₹10.0 L
  • Install tube-well at mahuar stadium, mahuar

    Drinking waterInstalling tube-wells and borewells· Kaimur· #302044

    ₹2.4 L Awaiting sanction · 79 daysRec. 14 Aug 2026
  • Development of mahuar stadium

    Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #302045

    ₹40,000 Awaiting sanction · 79 daysRec. 14 Aug 2026
  • Construction of road from Manager sah house to ghucha yadav house at Rajapur benilal dera

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292381

    ₹10.0 L Physical Inspection · 13 Aug 2026Rec. 6 Jul 2026Paid ₹10.0 L

18th Lok Sabha MPs from Bihar

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Raj Bhushan Choudhary · Muzaffarpur97%81%8081
2Giridhari Yadav · Banka98%79%9481
3Rajesh Verma · Khagaria56%52%6779
4Jitan Ram Manjhi · Gaya77%46%19478
5Arun Bharti · Jamui92%74%27077
6Kaushalendra Kumar · Nalanda57%37%11876
7Smt Veena Devi · Vaishali100%89%3076
8Radha Mohan Singh · Purvi Champaran89%47%6874
9Vijaylakshmi Devi · Siwan97%95%9574
10Ravi Shankar Prasad · Patna Sahib48%40%6072
11Dr Mohammad Jawed · Kishanganj89%65%13072
12Ajay Kumar Mandal · Bhagalpur58%54%5971

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.