25th of 40 from Bihar
Allocated limit
₹18.52 Cr
Median ₹14.70 Cr
Fund utilisation
100%
₹18.50 Cr recommended · 207 works
Above median (76%)
Paid to vendors
₹13.28 Cr
72% of allocation
Above median (37%)
Works completed
98
47% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP207 works
₹18.50 Cr · 100% of the ₹18.52 Cr allocated
- Sanctioned by the district155 works
75% sanctioned · took 2.9 months on average (due within 45 days)
- Completed98 works
₹9.72 Cr final cost · 7.4 months from recommendation on average
52 works are still awaiting sanction, 49 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 207 works worth ₹18.50 Cr, a fund utilisation of 100%, higher than 98% of 18th Lok Sabha MPs.
- The district has sanctioned 155 of them, taking 2.9 months on average.
- ₹13.28 Cr has been paid to vendors, 72% of the allocation.
- 98 works are complete, typically 7.4 months after recommendation. 29 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Sports & fitness.
- Payments went to 11 vendors. The largest received 32%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 64/100: finishing works counts most
- Works completed 30%47Completed ÷ recommended works.
- Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%30Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%72Paid to vendors ÷ allocated limit.
- Vendor diversity 10%85How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: ASSISTANT ENGINEER RAMGARH, 32% of payments across 11 vendors.
District sanction speed
82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
207 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Install tube-well infront of mahadev a2z at Baraura
Drinking waterInstalling tube-wells and borewells· Kaimur· #325001
₹2.4 L Awaiting sanction · 3 daysRec. 29 Oct 2026Construction of toilet and bathroom with nali at Mahuar Stadium
Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #283429
₹14.9 L Sanctioned · 28 Oct 2026Rec. 24 May 2026Development of Playfield at Pipria
Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #283010
₹1.0 L Sanctioned · 23 Oct 2026Rec. 24 May 2026Install Tubewell near RadhaRani Gaushala at Udhpura, Durgawati
Drinking waterInstalling tube-wells and borewells· Kaimur· #323778
₹2.4 L Awaiting sanction · 11 daysRec. 21 Oct 2026Additional Work for the Construction of a Platform at a Public Place Beside the Bridge in Bahpura
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Kaimur· #323779
₹2.7 L Awaiting sanction · 11 daysRec. 21 Oct 2026Construction of boundry wall of community building at Khamidaura
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kaimur· #289958
₹4.5 L Sanctioned · 16 Oct 2026Rec. 29 Jun 2026Install Tubewell at GNM training centre old sadar hospital campus, buxar
Drinking waterInstalling tube-wells and borewells· Buxar· #315789
₹3.0 L Sanctioned · 30 Sept 2026Rec. 17 Sep 2026Construction of road from Ambedkar chauk-Nai Bazar road to aashirvad marriage hall
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292383
₹15.0 L Sanctioned · 17 Sept 2026Rec. 6 Jul 2026Install high mast light near Dinara Hospital
Electricity & lightingStreet lights· Rohtas· #280923
₹7.0 L Sanctioned · 14 Sept 2026Rec. 15 May 2026Construction of road from Itadhi-Buxar road to Santosh Yadav house at Hukaha
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292382
₹15.0 L Physical Inspection · 3 Sept 2026Rec. 6 Jul 2026Paid ₹15.0 LBeautification of existing Community hall(Turha Bhawan) at Brahmpur Ward no-9
Community buildings & public spacesConstruction of community centers and community halls· Buxar· #292384
₹8.0 L Sanctioned · 3 Sept 2026Rec. 6 Jul 2026Construction of PCC from Rajendra prasad singh house to late rajendra sipahi house via saroj kumar singh house at Sikraul
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #289155
₹10.0 L Physical Inspection · 19 Aug 2026Rec. 25 Jun 2026Paid ₹10.0 LInstall tube-well at mahuar stadium, mahuar
Drinking waterInstalling tube-wells and borewells· Kaimur· #302044
₹2.4 L Awaiting sanction · 79 daysRec. 14 Aug 2026Development of mahuar stadium
Sports & fitnessDevelopment of playfields and sports grounds· Kaimur· #302045
₹40,000 Awaiting sanction · 79 daysRec. 14 Aug 2026Construction of road from Manager sah house to ghucha yadav house at Rajapur benilal dera
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Buxar· #292381
₹10.0 L Physical Inspection · 13 Aug 2026Rec. 6 Jul 2026Paid ₹10.0 L
18th Lok Sabha MPs from Bihar
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Raj Bhushan Choudhary · Muzaffarpur | 97% | 81% | 80 | 81 |
| 2 | Giridhari Yadav · Banka | 98% | 79% | 94 | 81 |
| 3 | Rajesh Verma · Khagaria | 56% | 52% | 67 | 79 |
| 4 | Jitan Ram Manjhi · Gaya | 77% | 46% | 194 | 78 |
| 5 | Arun Bharti · Jamui | 92% | 74% | 270 | 77 |
| 6 | Kaushalendra Kumar · Nalanda | 57% | 37% | 118 | 76 |
| 7 | Smt Veena Devi · Vaishali | 100% | 89% | 30 | 76 |
| 8 | Radha Mohan Singh · Purvi Champaran | 89% | 47% | 68 | 74 |
| 9 | Vijaylakshmi Devi · Siwan | 97% | 95% | 95 | 74 |
| 10 | Ravi Shankar Prasad · Patna Sahib | 48% | 40% | 60 | 72 |
| 11 | Dr Mohammad Jawed · Kishanganj | 89% | 65% | 130 | 72 |
| 12 | Ajay Kumar Mandal · Bhagalpur | 58% | 54% | 59 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.