Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Sanjay Seth

Lok SabhaBJPRanchi · Jharkhand

MP score36/100467th of 542 in the 18th Lok Sabha
9th of 14 from Jharkhand
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 33 works completed, score 51.
  • Payments concentrated with one vendor

    81% of vendor payments went to AMIT KUMAR JUNIOR ENGINEER.

Allocated limit

₹14.71 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹12.18 Cr recommended · 180 works
Above median (76%)

Paid to vendors

₹8.86 Cr

60% of allocation
Above median (37%)

Works completed

49

27% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP180 works

    ₹12.18 Cr · 83% of the ₹14.71 Cr allocated

  2. Sanctioned by the district150 works

    83% sanctioned · took 2.1 months on average (due within 45 days)

  3. Completed49 works

    ₹2.96 Cr final cost · 13.0 months from recommendation on average

30 works are still awaiting sanction.

In plain words

What the numbers say

  • Recommended 180 works worth ₹12.18 Cr, a fund utilisation of 83%, higher than 61% of 18th Lok Sabha MPs.
  • The district has sanctioned 150 of them, taking 2.1 months on average.
  • ₹8.86 Cr has been paid to vendors, 60% of the allocation.
  • 49 works are complete, typically 13.0 months after recommendation.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 3 vendors. The largest received 81%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 36/100: finishing works counts most

  1. Works completed 30%27Completed ÷ recommended works.
  2. Spending efficiency 20%33Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%60Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    24
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AMIT KUMAR JUNIOR ENGINEER, 81% of payments across 3 vendors.

District sanction speed

97/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%97Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

180 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of PCC road in front of Ankur Nursery in Lalgutuwa Panchayat of Nagri Block, Ranchi, Jharkhand.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranchi· #319873

    ₹8.6 L Awaiting sanction · 29 daysRec. 3 Oct 2026
  • Deep Boring work near Dahsrath Mahto's house in Anand Vihar Tangratoli, Ward No.-5, Ranchi, Jharkhand

    Drinking waterInstalling tube-wells and borewells· Ranchi· #314977

    ₹4.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of Shed near R.K. Gupta's house at Rishabh Nagar, ward no.-38, Ranchi, Jharkhand

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ranchi· #314978

    ₹10.3 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of Shed on the ground opposite Don Bosco School in Hesag, Ward No.-52, Ranchi, Jharkhand

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ranchi· #314979

    ₹10.7 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Deep Boring in the ground opposite Van Van Bandhu Parishad under Ward No.-19, Ranchi, Jharkhand.

    Drinking waterInstalling tube-wells and borewells· Ranchi· #314980

    ₹3.1 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of Guard Wall and PCC road near the culvert built on the Patragonda, Kanke Dam side in Ward No.-1, Ranchi, Jharkhand.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranchi· #314981

    ₹5.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Installation of paver blocks at Maidan in Bukru village, under Barhu Panchayat of Kanke Block.

    Roads & bridgesConstruction of footpaths and pedestrian ways· Ranchi· #315525

    ₹8.3 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of PCC road in front of Pandit Deendayal Upadhyay Path of Ormanjhi Panchayat under Ormanjhi Block, Ranchi, Jharkhand.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranchi· #315526

    ₹5.3 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of a Dashakarma shed near the pond in Baridih village, Baridih Panchayat, Ormanjhi Block, Ranchi, Jharkhand.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ranchi· #315527

    ₹6.2 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of stairs in the pond located in village Pancha of Pancha Panchayat undr Ormanjhi block, Ranchi, Jharkhand.

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Ranchi· #315528

    ₹9.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of Shed in Ormanjhi village under Ormanjhi Panchayat, Ormanjhi block, Ranchi, Jharkhand.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ranchi· #315529

    ₹8.7 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of Shed in Bare village under Bare Panchayat in Burmu Block, Ranchi, Jharkhand.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Ranchi· #315530

    ₹10.7 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Beautification of the cremation ground in Chandaghasi village, under the Chandaghasi Panchayat in Namkum Block, Ranchi, Jharkhand.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ranchi· #315531

    ₹9.9 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of a PCC road near Sharma Niwas in Harinagar village, Tati West Panchayat, under Namkum Block, Ranchi, Jharkhand.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranchi· #315543

    ₹7.4 L Awaiting sanction · 43 daysRec. 19 Sep 2026
  • Construction of PCC road near Shankar Mahato's house in village Hartu under Silwai Panchayat of Namkum block, Ranchi, Jharkhand.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ranchi· #315544

    ₹6.7 L Awaiting sanction · 43 daysRec. 19 Sep 2026

18th Lok Sabha MPs from Jharkhand

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Sukhdeo Bhagat · Lohardaga93%83%20880
2Vishnu Dayal Ram · Palamu76%57%12163
3Nalin Soren · Dumka96%70%10656
4Dulu Mahato · Dhanbad99%47%5749
5Shri Chandra Prakash Choudhary · Giridih92%42%6147
6Annpurna Devi · Kodarma73%25%8744
7Kali Charan Singh · Chatra74%39%7743
8Kali Charan Munda · Khunti95%70%3139
9Sanjay Seth · Ranchi83%60%4936
10Bidyut Baran Mahato · Jamshedpur76%58%534
11Vijay Kumar Hansdak · Rajmahal71%23%020
12Manish Jaiswal · Hazaribagh90%0%019

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.