6th of 14 from Jharkhand
Payments concentrated with one vendor
54% of vendor payments went to EXECUTIVE ENGINER NREP GIRIDIH.
Allocated limit
₹16.67 Cr
Median ₹14.70 Cr
Fund utilisation
73%
₹12.12 Cr recommended · 392 works
About the median
Paid to vendors
₹4.21 Cr
25% of allocation
Below median (37%)
Works completed
87
22% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP392 works
₹12.12 Cr · 73% of the ₹16.67 Cr allocated
- Sanctioned by the district302 works
77% sanctioned · took 5.4 months on average (due within 45 days)
- Completed87 works
₹2.53 Cr final cost · 11.0 months from recommendation on average
90 works are still awaiting sanction, 90 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 392 works worth ₹12.12 Cr, a fund utilisation of 73%, higher than 44% of 18th Lok Sabha MPs.
- The district has sanctioned 302 of them, taking 5.4 months on average.
- ₹4.21 Cr has been paid to vendors, 25% of the allocation.
- 87 works are complete, typically 11.0 months after recommendation. 35 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 5 vendors. The largest received 54%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 44/100: finishing works counts most
- Works completed 30%22Completed ÷ recommended works.
- Spending efficiency 20%60Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%73Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%40Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%25Paid to vendors ÷ allocated limit.
- Vendor diversity 10%57How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: EXECUTIVE ENGINER NREP GIRIDIH, 54% of payments across 5 vendors.
District sanction speed
70/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%70Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
392 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of paver blocks at Amnari Bazar Chowk, located in Bharajo Panchayat under Tatijharia Block.
Roads & bridgesConstruction of footpaths and pedestrian ways· Hazaribagh· #269506
₹4.0 L Completed 7 Oct 2026Rec. 19 Feb 2026Paid ₹4.0 LConstruction of paver block road from Narayan Mahato house to Jagdish Mahato house in village Dhirosingha of Panchayat Pindarsot under Jamua block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #230769
₹2.0 L Completed 5 Oct 2026Rec. 1 Sep 2025Paid ₹2.0 LConstruction of staircase ghat on the bank of the pond located in village Akhena of Adwara Panchayat under Bagodar block.
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Giridih· #229422
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Aug 2025Construction of paver blocks beside the Tola Nawadih Public Durga Mandap located in village Bangrakala of Panchayat Bangrakala under Birni block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #230801
₹3.0 L Sanctioned · 16 Sept 2026Rec. 1 Sep 2025Construction of a shed at the cremation ground in Koriadih Salaiya village, Bhalutand Panchayat, under Dhanwar Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289392
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a paver block road from the REO road in Nawada village (Maheshmarwa Panchayat, Dhanwar Block) to the house of Parmeshwar Rai.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289396
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a stepped ghat at Moglapahari Chabcha, located in Doranda village of South Doranda Panchayat within Dhanwar Block.
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Giridih· #289399
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a PCC road from the Bajrangbali Temple to the Lengraparas border in Santraydih village, Bandhi Panchayat, under Dhanwar Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289400
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a PCC road from the Sotiya transformer to Harihar Mahto house in Karudih village, Giridih Panchayat, under Dhanwar Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289401
₹4.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a paver block road from the house of Dayanand Singh to the house of Sachin Singh in Jeruwadih village, Ambatand Panchayat, Dhanwar Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289407
₹2.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a paver block road from Bhutu Singh house to the Khandidih metalled road in Khandidih village, Dhuraita Panchayat, Jamua Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289413
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a paver block road from the Reo Road to the Devi Mandap in Khariyodih village, Palmo Panchayat, Jamua Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289417
₹2.5 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a tiled platform near the Durga Temple in Bilotand village, Nekpura Panchayat, under Deori Block.
Community buildings & public spacesConstruction of platforms and passenger sheds at railway stations· Giridih· #289423
₹3.5 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of paver blocks next to the Shiva temple in village Rajmaniya, Kapilo Panchayat, under Birni Block.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289514
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026Construction of a paver block area in front of the Garangaghat Shiva Temple, located in the village of Chandauri (Chandauri Panchayat, Tisri Block).
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Giridih· #289582
₹3.0 L Sanctioned · 16 Sept 2026Rec. 26 Jun 2026
18th Lok Sabha MPs from Jharkhand
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Sukhdeo Bhagat · Lohardaga | 93% | 83% | 208 | 80 |
| 2 | Vishnu Dayal Ram · Palamu | 76% | 57% | 121 | 63 |
| 3 | Nalin Soren · Dumka | 96% | 70% | 106 | 56 |
| 4 | Dulu Mahato · Dhanbad | 99% | 47% | 57 | 49 |
| 5 | Shri Chandra Prakash Choudhary · Giridih | 92% | 42% | 61 | 47 |
| 6 | Annpurna Devi · Kodarma | 73% | 25% | 87 | 44 |
| 7 | Kali Charan Singh · Chatra | 74% | 39% | 77 | 43 |
| 8 | Kali Charan Munda · Khunti | 95% | 70% | 31 | 39 |
| 9 | Sanjay Seth · Ranchi | 83% | 60% | 49 | 36 |
| 10 | Bidyut Baran Mahato · Jamshedpur | 76% | 58% | 5 | 34 |
| 11 | Vijay Kumar Hansdak · Rajmahal | 71% | 23% | 0 | 20 |
| 12 | Manish Jaiswal · Hazaribagh | 90% | 0% | 0 | 19 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.