MPLADS report card · 18th Lok Sabha

Kali Charan Singh

Lok SabhaBJPChatra · Jharkhand

MP score43/100427th of 542 in the 18th Lok Sabha
7th of 14 from Jharkhand

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

74%

₹10.81 Cr recommended · 517 works
About the median

Paid to vendors

₹5.72 Cr

39% of allocation
Above median (37%)

Works completed

77

15% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP517 works

    ₹10.81 Cr · 74% of the ₹14.70 Cr allocated

  2. Sanctioned by the district465 works

    90% sanctioned · took 3.1 months on average (due within 45 days)

  3. Completed77 works

    ₹1.99 Cr final cost · 8.1 months from recommendation on average

52 works are still awaiting sanction, 49 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 517 works worth ₹10.81 Cr, a fund utilisation of 74%, higher than 46% of 18th Lok Sabha MPs.
  • The district has sanctioned 465 of them, taking 3.1 months on average.
  • ₹5.72 Cr has been paid to vendors, 39% of the allocation.
  • 77 works are complete, typically 8.1 months after recommendation. 55 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 8 vendors. The largest received 50%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 43/100: finishing works counts most

  1. Works completed 30%15Completed ÷ recommended works.
  2. Spending efficiency 20%35Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%74Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%71Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%39Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    63
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: District Engineer, 50% of payments across 8 vendors.

District sanction speed

88/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%88Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

517 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • construction of Vivah Mandap near Bazar vill-pashar, Panchait-Kasmar, Block-Tarhasi

    Community buildings & public spacesConstruction of community centers and community halls· Palamu· #244592

    ₹2.5 L Sanctioned · 23 Oct 2026Rec. 29 Oct 2025
  • construction of Smshan Shed on the bank of Amanat Nadi Basguru, vill-Sonpura, Panchait-Sonpura, Block-Tarhasi

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Palamu· #244599

    ₹2.5 L Sanctioned · 23 Oct 2026Rec. 29 Oct 2025
  • construction of Sirhi in Chhath Ghat vill-Harauhop, Panchait-balubhang, Block-Bariyatu

    Irrigation, flood & environmentRenovation of ponds and lakes· Latehar· #320650

    ₹2.5 L Awaiting sanction · 25 daysRec. 7 Oct 2026
  • construction of Chabutra with Shed near Samudayak Bhawan vill-Hernhoppa, Panchait-Balubhang, Block-Bariyatu

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Latehar· #312518

    ₹2.5 L Sanctioned · 3 Oct 2026Rec. 5 Sep 2026
  • construction of P.C.C. Road from house of Biro Ram to house of Manoj Bhuiyan vill-Sitadih, Panchait-Kothas, Block-Leslganj

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Palamu· #258539

    ₹3.0 L Completed 29 Sept 2026Rec. 10 Jan 2026Paid ₹3.0 L
  • construction of Boundrywal of Sabri Asharam in vill-Shonsh, Panchait-Leshligunj, Block-Lesliganj

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Palamu· #269030

    ₹2.5 L Completed 29 Sept 2026Rec. 17 Feb 2026Paid ₹2.5 L
  • construction of Shed near Belgada chouk vill-Belgada, Panchait-Serandag, Block-Simaria

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chatra· #318740

    ₹2.5 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • renovation of Samudaik Bhawan in Sael Bagicha, vill-Seal Bagicha, panchait-Chiridiri, Block-Kanhachati

    Community buildings & public spacesRetrofitting in essential lifeline buildings· Chatra· #318741

    ₹14.0 L Awaiting sanction · 34 daysRec. 28 Sep 2026
  • construction of shed near Devi Mandap vill-Bhang, Panchait-Masiyatu, Blok-Balumath

    Community buildings & public spacesConstruction of community centers and community halls· Latehar· #258543

    ₹2.5 L Sanctioned · 24 Sept 2026Rec. 10 Jan 2026
  • construction of Sirhi in Chhath Ghat vill-Kuti, panchait-Banasari, Block-Simaria

    Irrigation, flood & environmentRenovation of ponds and lakes· Chatra· #312521

    ₹2.5 L Awaiting sanction · 57 daysRec. 5 Sep 2026
  • construction of shed in Smashan Ghat vill-Phulsu, panchait-Phulsu, Block_bariyatu

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Latehar· #312524

    ₹2.5 L Awaiting sanction · 57 daysRec. 5 Sep 2026
  • construction of Smshan Shed vill-Hendehas, panchait-Rud, Block-Garu

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Latehar· #246674

    ₹2.5 L Sanctioned · 1 Sept 2026Rec. 7 Nov 2025
  • construction of Chabutra with shed Near Mandar vill-Tapej, Panchait-Dewaria, Block-Chatra

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chatra· #307150

    ₹2.0 L Awaiting sanction · 70 daysRec. 23 Aug 2026
  • construction of Chabutra with Shed near devi mandap Vill-Kanaudi, Panchait-Lem, Block-Chatra

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chatra· #307151

    ₹2.0 L Awaiting sanction · 70 daysRec. 23 Aug 2026
  • construction of Chabutra with Shed in Yadav Tola vill-Maramdiri, Panchait-Lem, Block-Chatra

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Chatra· #307152

    ₹2.0 L Awaiting sanction · 70 daysRec. 23 Aug 2026

18th Lok Sabha MPs from Jharkhand

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Sukhdeo Bhagat · Lohardaga93%83%20880
2Vishnu Dayal Ram · Palamu76%57%12163
3Nalin Soren · Dumka96%70%10656
4Dulu Mahato · Dhanbad99%47%5749
5Shri Chandra Prakash Choudhary · Giridih92%42%6147
6Annpurna Devi · Kodarma73%25%8744
7Kali Charan Singh · Chatra74%39%7743
8Kali Charan Munda · Khunti95%70%3139
9Sanjay Seth · Ranchi83%60%4936
10Bidyut Baran Mahato · Jamshedpur76%58%534
11Vijay Kumar Hansdak · Rajmahal71%23%020
12Manish Jaiswal · Hazaribagh90%0%019

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.