4th of 14 from Jharkhand
Payments concentrated with one vendor
67% of vendor payments went to BIRENDRA KUMAR MAHATO.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
99%
₹14.61 Cr recommended · 419 works
Above median (76%)
Paid to vendors
₹6.86 Cr
47% of allocation
Above median (37%)
Works completed
57
14% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP419 works
₹14.61 Cr · 99% of the ₹14.70 Cr allocated
- Sanctioned by the district317 works
76% sanctioned · took 3.2 months on average (due within 45 days)
- Completed57 works
₹2.15 Cr final cost · 5.9 months from recommendation on average
102 works are still awaiting sanction, 100 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 419 works worth ₹14.61 Cr, a fund utilisation of 99%, higher than 95% of 18th Lok Sabha MPs.
- The district has sanctioned 317 of them, taking 3.2 months on average.
- ₹6.86 Cr has been paid to vendors, 47% of the allocation.
- 57 works are complete, typically 5.9 months after recommendation. 57 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 6 vendors. The largest received 67%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 49/100: finishing works counts most
- Works completed 30%14Completed ÷ recommended works.
- Spending efficiency 20%31Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%47Paid to vendors ÷ allocated limit.
- Vendor diversity 10%41How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: BIRENDRA KUMAR MAHATO, 67% of payments across 6 vendors.
District sanction speed
80/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%80Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
419 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of PCC road and drain from Vinay Kumar Rajak house in Rajendra Nagar under Hansabatu Panchayat to Sri ram Sah house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #245549
₹5.3 L Sanctioned · 24 Sept 2026Rec. 3 Nov 2025PCC road construction from Dilip Gorai house to Prafulla Gorai house in Nawadih village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #255310
₹4.0 L Sanctioned · 24 Sept 2026Rec. 24 Dec 2025PCC road construction from Deshmukh Sahu house in Gumla Colony below to Basant Oraon house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #255311
₹3.5 L Sanctioned · 24 Sept 2026Rec. 24 Dec 2025PCC road construction from chhote mandal house of circus ground to CT Yadav house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #255312
₹3.5 L Sanctioned · 24 Sept 2026Rec. 24 Dec 2025Construction of PCC road from Healthy Centre of Tola Kenduadih to Vadwan under Ghatiyali East
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #255313
₹2.5 L Sanctioned · 24 Sept 2026Rec. 24 Dec 2025Construction of PCC road from Prabir Mukherjee shop in Bandha over Devgram to Bhuvan Maji house
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #259781
₹4.0 L Sanctioned · 24 Sept 2026Rec. 18 Jan 2026Construction of Ambedkar Bhawan at Katka Bauri Tola
Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Bokaro· #259782
₹4.0 L Sanctioned · 24 Sept 2026Rec. 18 Jan 2026Construction of PCC Path from Bandhdih Ashavihar Main Road to Shashti Temple Katka village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #259783
₹3.5 L Sanctioned · 24 Sept 2026Rec. 18 Jan 2026Construction of ghat at Keshav pond in Baghgoda village
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Bokaro· #259784
₹3.3 L Sanctioned · 24 Sept 2026Rec. 18 Jan 2026Road construction from Oreo Road to Sheetla Mata Temple in Gopdih village
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #260200
₹4.0 L Sanctioned · 24 Sept 2026Rec. 19 Jan 2026Construction of bathing ghat at Joshi Godia Talab in Devgram
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Bokaro· #260201
₹2.5 L Sanctioned · 24 Sept 2026Rec. 19 Jan 2026Construction of ghat under Jamuniyatad village niche kulhi talab
Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Bokaro· #260202
₹5.0 L Sanctioned · 24 Sept 2026Rec. 19 Jan 2026Construction of PCC Road from jamaitola in chaitatand to rautdih basti
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bokaro· #260627
₹4.5 L Sanctioned · 24 Sept 2026Rec. 21 Jan 2026Deep Boring near the utkramik high school in Shibutand
Drinking waterInstalling tube-wells and borewells· Bokaro· #261647
₹3.8 L Sanctioned · 24 Sept 2026Rec. 25 Jan 2026Deep Boring at Harijan Adivasi Tola of Santhaldih Jahera than
Drinking waterInstalling tube-wells and borewells· Bokaro· #261648
₹3.8 L Sanctioned · 24 Sept 2026Rec. 25 Jan 2026
18th Lok Sabha MPs from Jharkhand
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Sukhdeo Bhagat · Lohardaga | 93% | 83% | 208 | 80 |
| 2 | Vishnu Dayal Ram · Palamu | 76% | 57% | 121 | 63 |
| 3 | Nalin Soren · Dumka | 96% | 70% | 106 | 56 |
| 4 | Dulu Mahato · Dhanbad | 99% | 47% | 57 | 49 |
| 5 | Shri Chandra Prakash Choudhary · Giridih | 92% | 42% | 61 | 47 |
| 6 | Annpurna Devi · Kodarma | 73% | 25% | 87 | 44 |
| 7 | Kali Charan Singh · Chatra | 74% | 39% | 77 | 43 |
| 8 | Kali Charan Munda · Khunti | 95% | 70% | 31 | 39 |
| 9 | Sanjay Seth · Ranchi | 83% | 60% | 49 | 36 |
| 10 | Bidyut Baran Mahato · Jamshedpur | 76% | 58% | 5 | 34 |
| 11 | Vijay Kumar Hansdak · Rajmahal | 71% | 23% | 0 | 20 |
| 12 | Manish Jaiswal · Hazaribagh | 90% | 0% | 0 | 19 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.