MPLADS report card · 18th Lok Sabha

Rodmal Nagar

Lok SabhaBJPRajgarh · Madhya Pradesh

MP score54/100303rd of 542 in the 18th Lok Sabha
12th of 29 from Madhya Pradesh
Also an MP in the 17th Lok Sabha Then: 99% utilisation, 285 works completed, score 78.
  • Payments concentrated with one vendor

    53% of vendor payments went to MP Agro Biaora.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹14.65 Cr recommended · 355 works
Above median (76%)

Paid to vendors

₹9.55 Cr

65% of allocation
Above median (37%)

Works completed

54

15% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP355 works

    ₹14.65 Cr · 100% of the ₹14.70 Cr allocated

  2. Sanctioned by the district279 works

    79% sanctioned · took 5.0 months on average (due within 45 days)

  3. Completed54 works

    ₹3.60 Cr final cost · 5.8 months from recommendation on average

76 works are still awaiting sanction, 76 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 355 works worth ₹14.65 Cr, a fund utilisation of 100%, higher than 96% of 18th Lok Sabha MPs.
  • The district has sanctioned 279 of them, taking 5.0 months on average.
  • ₹9.55 Cr has been paid to vendors, 65% of the allocation.
  • 54 works are complete, typically 5.8 months after recommendation. 52 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Sports & fitness.
  • Payments went to 11 vendors. The largest received 53%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 54/100: finishing works counts most

  1. Works completed 30%15Completed ÷ recommended works.
  2. Spending efficiency 20%38Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%65Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    59
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MP Agro Biaora, 53% of payments across 11 vendors.

District sanction speed

73/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%73Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

355 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • open gym 14 item (air swing walker, leg press, surf board, rover, cross trainer, sitted puller, push up bar, parellal bar, solder builder, seat up board, standing and sitting twister, chest pullar, fabricated matal slide, fabricated matal double swing)

    Sports & fitnessInstallation of fixed garden gym equipment· Shajapur· #287376

    ₹9.1 L Sanctioned · 29 Oct 2026Rec. 19 Jun 2026
  • open gym 14 item (air swing walker, leg press, surf board, rover, cross trainer, sitted puller, push up bar, parellal bar, solder builder, seat up board, standing and sitting twister, chest pullar, fabricated matal slide, fabricated matal double swing)

    Sports & fitnessInstallation of fixed garden gym equipment· Shajapur· #287377

    ₹9.1 L Sanctioned · 29 Oct 2026Rec. 19 Jun 2026
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286969

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286970

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286971

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286972

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286973

    ₹63,635 Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹63,635
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286974

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286975

    ₹1.9 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.9 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286976

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286977

    ₹1.3 L Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹1.3 L
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286978

    ₹63,635 Work partially Completed · 21 Aug 2026Rec. 19 Jun 2026Paid ₹63,635
  • pre cost concreate re imformed bench with armrest three seater

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #286979

    ₹63,635 Vendor Identification · 21 Aug 2026Rec. 19 Jun 2026
  • pre cast concreat re inforced bench with armrest (three seater)

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #287292

    ₹1.3 L Vendor Identification · 21 Aug 2026Rec. 19 Jun 2026
  • pre cast concreat re inforced bench with armrest (three seater)

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Rajgarh· #287293

    ₹1.3 L Vendor Identification · 21 Aug 2026Rec. 19 Jun 2026

18th Lok Sabha MPs from Madhya Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Durga Das Uikey · Betul99%57%28875
2Gyaneshwar Patil · Khandwa87%58%23373
3Dr. Lata Wankhede · Sagar97%75%11373
4Jyotiraditya M. Scindia · Guna62%38%4673
5Shri Anil Firojiya · Ujjain68%56%16071
6Bharti Pardhi · Balaghat82%61%11571
7Savitri Thakur · Dhar95%64%17968
8Rahul Singh Lodhi · Damoh54%45%18867
9Shankar Lalwani · Indore94%55%14567
10Dr. Rajesh Mishra · Sidhi92%72%17259
11Alok Sharma · Bhopal85%49%2455
12Rodmal Nagar · Rajgarh100%65%5454

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.