Allocated limit
₹15.44 Cr
Median ₹14.70 Cr
Fund utilisation
82%
₹12.63 Cr recommended · 180 works
Above median (76%)
Paid to vendors
₹9.46 Cr
61% of allocation
Above median (37%)
Works completed
115
64% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP180 works
₹12.63 Cr · 82% of the ₹15.44 Cr allocated
- Sanctioned by the district160 works
89% sanctioned · took 51 days on average (due within 45 days)
- Completed115 works
₹5.26 Cr final cost · 7.1 months from recommendation on average
20 works are still awaiting sanction, 8 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 180 works worth ₹12.63 Cr, a fund utilisation of 82%, higher than 59% of 18th Lok Sabha MPs.
- The district has sanctioned 160 of them, taking 51 days on average.
- ₹9.46 Cr has been paid to vendors, 61% of the allocation.
- 115 works are complete, typically 7.1 months after recommendation. 114 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 46 vendors. The largest received 42%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 71/100: finishing works counts most
- Works completed 30%64Completed ÷ recommended works.
- Spending efficiency 20%56Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%82Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%99Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%61Paid to vendors ÷ allocated limit.
- Vendor diversity 10%72How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: DEVESH KUMAR PATLE, 42% of payments across 46 vendors.
District sanction speed
97/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%97Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
180 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
GRAM MATE KE AAMA AMRAHI SE TEERANLAL BAHE KE GHAR TAK 200 METER ROAD NIRMAN.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balaghat· #325523
₹6.0 L Awaiting sanction · 0 daysRec. 1 Nov 2026GRAM BANDRI, JP LALBARRA MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #269812
₹2.0 L Completed 30 Oct 2026Rec. 20 Feb 2026Paid ₹2.0 LGRAM KANKI, JP LALBARRA MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #269813
₹2.0 L Completed 30 Oct 2026Rec. 20 Feb 2026Paid ₹2.0 LGRAM KHAIRGAON GRAM PANCHYAT CHHINDLAI JP LALBARRA MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #272008
₹2.0 L Completed 30 Oct 2026Rec. 3 Mar 2026Paid ₹2.0 LDumrahi jamjhodi nala me stopdam nirman karya.
Irrigation, flood & environmentConstruction of public irrigation facilities· Balaghat· #324823
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026Boditola se dshiyantola marg par Slab Culvert Nirman karya.
Roads & bridgesConstruction of culverts and bridges· Balaghat· #324824
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026shodhandongari marg par Slab Culvert nirman karya.
Roads & bridgesConstruction of culverts and bridges· Balaghat· #324825
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026Rajma se suklutola marg par Slab Culvert nirman karya.
Roads & bridgesConstruction of culverts and bridges· Balaghat· #324826
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026Mowala se talabtola marg me Slab Culvert nirman karya.
Roads & bridgesConstruction of culverts and bridges· Balaghat· #324827
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026mohanpur shantidham marg me Slab Culvert nirman karya.
Roads & bridgesConstruction of culverts and bridges· Balaghat· #324828
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026Gram panchayat mohanpur ke gram sukaldand nala me slab culvert nirman karya.
Irrigation, flood & environmentConstruction of public irrigation facilities· Balaghat· #324829
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026Bakhuji dumar nala me stopdam nirman karya.
Irrigation, flood & environmentConstruction of public irrigation facilities· Balaghat· #324831
₹25.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM AGRI, JP KATANGI MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #269767
₹2.0 L Completed 29 Oct 2026Rec. 20 Feb 2026Paid ₹2.0 LGRAM KAMTHI, JP KATANGI MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #269769
₹2.0 L Completed 29 Oct 2026Rec. 20 Feb 2026Paid ₹2.0 LGRAM KALIMATI, JP KATANGI MEIN G.I. WATER TANKER MOUNTED ON TWO WHEEL TRACTOR TRAILER CAPACITY 5000 LITER WITH FIRE FIGHTING PUMP
Drinking waterPurchase of mobile water tankers· Balaghat· #269770
₹2.0 L Completed 29 Oct 2026Rec. 20 Feb 2026Paid ₹2.0 L
18th Lok Sabha MPs from Madhya Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Durga Das Uikey · Betul | 99% | 57% | 288 | 75 |
| 2 | Gyaneshwar Patil · Khandwa | 87% | 58% | 233 | 73 |
| 3 | Dr. Lata Wankhede · Sagar | 97% | 75% | 113 | 73 |
| 4 | Jyotiraditya M. Scindia · Guna | 62% | 38% | 46 | 73 |
| 5 | Shri Anil Firojiya · Ujjain | 68% | 56% | 160 | 71 |
| 6 | Bharti Pardhi · Balaghat | 82% | 61% | 115 | 71 |
| 7 | Savitri Thakur · Dhar | 95% | 64% | 179 | 68 |
| 8 | Rahul Singh Lodhi · Damoh | 54% | 45% | 188 | 67 |
| 9 | Shankar Lalwani · Indore | 94% | 55% | 145 | 67 |
| 10 | Dr. Rajesh Mishra · Sidhi | 92% | 72% | 172 | 59 |
| 11 | Alok Sharma · Bhopal | 85% | 49% | 24 | 55 |
| 12 | Rodmal Nagar · Rajgarh | 100% | 65% | 54 | 54 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.