6th of 20 from Kerala
Allocated limit
₹17.15 Cr
Median ₹14.70 Cr
Fund utilisation
77%
₹13.24 Cr recommended · 197 works
About the median
Paid to vendors
₹7.13 Cr
42% of allocation
Above median (37%)
Works completed
78
40% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP197 works
₹13.24 Cr · 77% of the ₹17.15 Cr allocated
- Sanctioned by the district187 works
95% sanctioned · took 3.0 months on average (due within 45 days)
- Completed78 works
₹4.66 Cr final cost · 10.7 months from recommendation on average
10 works are still awaiting sanction, 8 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 197 works worth ₹13.24 Cr, a fund utilisation of 77%, higher than 52% of 18th Lok Sabha MPs.
- The district has sanctioned 187 of them, taking 3.0 months on average.
- ₹7.13 Cr has been paid to vendors, 42% of the allocation.
- 78 works are complete, typically 10.7 months after recommendation. 57 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 57 vendors. The largest received 9.6%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 62/100: finishing works counts most
- Works completed 30%40Completed ÷ recommended works.
- Spending efficiency 20%65Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%77Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%73Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%42Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: SML ISUZU LTD, 9.6% of payments across 57 vendors.
District sanction speed
91/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%91Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
197 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Science Lab for High School section in Ayyan Koikkal Govt Higher Secondary School in Thevalakkara Gramapanchayat at Chavara Constituency
Education & librariesSetting up of laboratories· Kollam· #324264
₹8.1 L Awaiting sanction · 9 daysRec. 23 Oct 2026Installation of Minimast light Motorized in front of Sri Chavarukavu Temple Road at Town Ward Anchal GP Punalur Constituency
Electricity & lightingLighting of public spaces· Kollam· #324265
₹3.4 L Awaiting sanction · 9 daysRec. 23 Oct 2026Concreting of slab over the KIP canal from Jawahar drinking water supply scheme to South, Mullikkala Thekku Ward 10, Thevalakkara GP at Chavara Constituency
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Kollam· #176678
₹4.9 L Completed 23 Sept 2026Rec. 20 Feb 2025Paid ₹4.9 LConcreting of Kotheri-Krishnanada-Valiya Kattuvila road Uliyanad ward 2, Chirakkara Grama Panchayat in Chathannur Constituency
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #220972
₹7.7 L Completed 19 Sept 2026Rec. 22 Jul 2025Paid ₹7.7 LInstallation of Minimast light (Motorized) at the road near Gurunagappan Temple, Chirakkarathazham, Chirakkara Grama Panchayat, Chathannur Constituency
Electricity & lightingLighting of public spaces· Kollam· #227024
₹3.3 L Completed 19 Sept 2026Rec. 14 Aug 2025Paid ₹3.3 LInstallation of Minimast light (Motorized) at Mottorkunnu Junction Attoorkonam Ward Velinalloor Gramapanchayat Chadayamangalam Constituency
Electricity & lightingLighting of public spaces· Kollam· #243538
₹3.4 L Completed 11 Sept 2026Rec. 24 Oct 2025Paid ₹3.4 LInstalltion of Minimast light (Motorized) at Mathayimukku Junction Paramkodu Ward No 2 Elamadu Gramapanchayat in Chadayamangalam Constituency
Electricity & lightingLighting of public spaces· Kollam· #243936
₹3.4 L Completed 11 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 LInstallation of Minimastlight (Motorized) in front of Cherukulam Jamath Kavadam Chunda Ward at Ittiva Gramapanchayat Chadayamangaam Constituency
Electricity & lightingLighting of public spaces· Kollam· #243940
₹3.4 L Completed 11 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 LInstallation of Minimast light (motorized) on the road in the front of Vellathankonam Sree Subramanya Swamy Temple in Kurakkode ward of Chithara panchayat in Chadayamangalam Constituency
Electricity & lightingLighting of public spaces· Kollam· #243942
₹3.4 L Completed 10 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 LConstruction of Mini hall in the first floor Perumpuzha Public Library and reading room, Elampalloor Panchayat in Kundara Constituency
Community buildings & public spacesConstruction of community centers and community halls· Kollam· #282666
₹12.0 L Sanctioned · 9 Sept 2026Rec. 21 May 2026Construction of Protection wall and concreting of road at Vadavana Ela road in Kalari Junction in Elampalloor Grama Panchayat at Kundara Constituency
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #296129
₹8.0 L Sanctioned · 9 Sept 2026Rec. 17 Jul 2026Concreting of the Mulakuvila Neelakonam road in Atturkonam ward Velinalloor Grama Panchayat Chadayamangalam Constituency
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #301134
₹10.0 L Sanctioned · 9 Sept 2026Rec. 4 Aug 2026Construction of Building for Anganwadi No. 41, Padinjattekara Ward 23, Thevalakara Gramapanchayat, Chavara Constituency
Education & librariesConstruction of buildings for crèches and anganwadies· Kollam· #143793
₹13.4 L Completed 5 Sept 2026Rec. 26 Sep 2024Paid ₹13.4 LConcreting of road in Thazhemuzhi Poovott Ela Road in Kanjirampaara Ward 7, Pooyapally Gramapanchayat at Chathanoor Constituency
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #176680
₹4.0 L Completed 5 Sept 2026Rec. 20 Feb 2025Paid ₹4.0 LThachacodu to Panayam Sree Mahadeva Temple road at Neelammal in Karavalur Grama Panchayat side wall construction
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #185231
₹8.1 L Completed 5 Sept 2026Rec. 21 Mar 2025Paid ₹8.1 L
18th Lok Sabha MPs from Kerala
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Adv Dean Kuriakose · Idukki | 95% | 42% | 102 | 73 |
| 2 | Vellalath Kochukrishnan Nair Sreekandan · Palakkad | 92% | 32% | 123 | 71 |
| 3 | Dr Shashi Tharoor · Thiruvananthapuram | 68% | 30% | 54 | 67 |
| 4 | Adv K Francis George · Kottayam | 98% | 23% | 89 | 65 |
| 5 | K Radhakrishnan · Alathur | 98% | 21% | 30 | 62 |
| 6 | Shri NK Premachandran · Kollam | 77% | 42% | 78 | 62 |
| 7 | Shri Hibi Eden · Ernakulam | 92% | 19% | 29 | 61 |
| 8 | Shri Kumbakudi Sudhakaran · Kannur | 80% | 19% | 81 | 61 |
| 9 | Shri Suresh Kodikunnil · Mavelikkara | 78% | 26% | 70 | 60 |
| 10 | K. C Venugopal · Alappuzha | 64% | 37% | 45 | 58 |
| 11 | Shri Benny Behanan · Chalakudy | 80% | 20% | 36 | 58 |
| 12 | Dr. M.P Abdussamad Samadani · Ponnani | 97% | 16% | 62 | 57 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.