Skip to content
MPLADSTracker
RSP

MPLADS report card · 18th Lok Sabha

Shri NK Premachandran

Lok SabhaRSPKollam · Kerala

MP score62/100196th of 542 in the 18th Lok Sabha
6th of 20 from Kerala
Also an MP in the 17th Lok Sabha Then: 86% utilisation, 54 works completed, score 86.

Allocated limit

₹17.15 Cr

Median ₹14.70 Cr

Fund utilisation

77%

₹13.24 Cr recommended · 197 works
About the median

Paid to vendors

₹7.13 Cr

42% of allocation
Above median (37%)

Works completed

78

40% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP197 works

    ₹13.24 Cr · 77% of the ₹17.15 Cr allocated

  2. Sanctioned by the district187 works

    95% sanctioned · took 3.0 months on average (due within 45 days)

  3. Completed78 works

    ₹4.66 Cr final cost · 10.7 months from recommendation on average

10 works are still awaiting sanction, 8 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 197 works worth ₹13.24 Cr, a fund utilisation of 77%, higher than 52% of 18th Lok Sabha MPs.
  • The district has sanctioned 187 of them, taking 3.0 months on average.
  • ₹7.13 Cr has been paid to vendors, 42% of the allocation.
  • 78 works are complete, typically 10.7 months after recommendation. 57 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 57 vendors. The largest received 9.6%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 62/100: finishing works counts most

  1. Works completed 30%40Completed ÷ recommended works.
  2. Spending efficiency 20%65Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%77Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%73Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%42Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SML ISUZU LTD, 9.6% of payments across 57 vendors.

District sanction speed

91/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%91Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

197 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Science Lab for High School section in Ayyan Koikkal Govt Higher Secondary School in Thevalakkara Gramapanchayat at Chavara Constituency

    Education & librariesSetting up of laboratories· Kollam· #324264

    ₹8.1 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • Installation of Minimast light Motorized in front of Sri Chavarukavu Temple Road at Town Ward Anchal GP Punalur Constituency

    Electricity & lightingLighting of public spaces· Kollam· #324265

    ₹3.4 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • Concreting of slab over the KIP canal from Jawahar drinking water supply scheme to South, Mullikkala Thekku Ward 10, Thevalakkara GP at Chavara Constituency

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Kollam· #176678

    ₹4.9 L Completed 23 Sept 2026Rec. 20 Feb 2025Paid ₹4.9 L
  • Concreting of Kotheri-Krishnanada-Valiya Kattuvila road Uliyanad ward 2, Chirakkara Grama Panchayat in Chathannur Constituency

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #220972

    ₹7.7 L Completed 19 Sept 2026Rec. 22 Jul 2025Paid ₹7.7 L
  • Installation of Minimast light (Motorized) at the road near Gurunagappan Temple, Chirakkarathazham, Chirakkara Grama Panchayat, Chathannur Constituency

    Electricity & lightingLighting of public spaces· Kollam· #227024

    ₹3.3 L Completed 19 Sept 2026Rec. 14 Aug 2025Paid ₹3.3 L
  • Installation of Minimast light (Motorized) at Mottorkunnu Junction Attoorkonam Ward Velinalloor Gramapanchayat Chadayamangalam Constituency

    Electricity & lightingLighting of public spaces· Kollam· #243538

    ₹3.4 L Completed 11 Sept 2026Rec. 24 Oct 2025Paid ₹3.4 L
  • Installtion of Minimast light (Motorized) at Mathayimukku Junction Paramkodu Ward No 2 Elamadu Gramapanchayat in Chadayamangalam Constituency

    Electricity & lightingLighting of public spaces· Kollam· #243936

    ₹3.4 L Completed 11 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 L
  • Installation of Minimastlight (Motorized) in front of Cherukulam Jamath Kavadam Chunda Ward at Ittiva Gramapanchayat Chadayamangaam Constituency

    Electricity & lightingLighting of public spaces· Kollam· #243940

    ₹3.4 L Completed 11 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 L
  • Installation of Minimast light (motorized) on the road in the front of Vellathankonam Sree Subramanya Swamy Temple in Kurakkode ward of Chithara panchayat in Chadayamangalam Constituency

    Electricity & lightingLighting of public spaces· Kollam· #243942

    ₹3.4 L Completed 10 Sept 2026Rec. 25 Oct 2025Paid ₹3.4 L
  • Construction of Mini hall in the first floor Perumpuzha Public Library and reading room, Elampalloor Panchayat in Kundara Constituency

    Community buildings & public spacesConstruction of community centers and community halls· Kollam· #282666

    ₹12.0 L Sanctioned · 9 Sept 2026Rec. 21 May 2026
  • Construction of Protection wall and concreting of road at Vadavana Ela road in Kalari Junction in Elampalloor Grama Panchayat at Kundara Constituency

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #296129

    ₹8.0 L Sanctioned · 9 Sept 2026Rec. 17 Jul 2026
  • Concreting of the Mulakuvila Neelakonam road in Atturkonam ward Velinalloor Grama Panchayat Chadayamangalam Constituency

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #301134

    ₹10.0 L Sanctioned · 9 Sept 2026Rec. 4 Aug 2026
  • Construction of Building for Anganwadi No. 41, Padinjattekara Ward 23, Thevalakara Gramapanchayat, Chavara Constituency

    Education & librariesConstruction of buildings for crèches and anganwadies· Kollam· #143793

    ₹13.4 L Completed 5 Sept 2026Rec. 26 Sep 2024Paid ₹13.4 L
  • Concreting of road in Thazhemuzhi Poovott Ela Road in Kanjirampaara Ward 7, Pooyapally Gramapanchayat at Chathanoor Constituency

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #176680

    ₹4.0 L Completed 5 Sept 2026Rec. 20 Feb 2025Paid ₹4.0 L
  • Thachacodu to Panayam Sree Mahadeva Temple road at Neelammal in Karavalur Grama Panchayat side wall construction

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #185231

    ₹8.1 L Completed 5 Sept 2026Rec. 21 Mar 2025Paid ₹8.1 L

18th Lok Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Adv Dean Kuriakose · Idukki95%42%10273
2Vellalath Kochukrishnan Nair Sreekandan · Palakkad92%32%12371
3Dr Shashi Tharoor · Thiruvananthapuram68%30%5467
4Adv K Francis George · Kottayam98%23%8965
5K Radhakrishnan · Alathur98%21%3062
6Shri NK Premachandran · Kollam77%42%7862
7Shri Hibi Eden · Ernakulam92%19%2961
8Shri Kumbakudi Sudhakaran · Kannur80%19%8161
9Shri Suresh Kodikunnil · Mavelikkara78%26%7060
10K. C Venugopal · Alappuzha64%37%4558
11Shri Benny Behanan · Chalakudy80%20%3658
12Dr. M.P Abdussamad Samadani · Ponnani97%16%6257

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.