MPLADS report card · 17th Lok Sabha

Smt Locket Chatterjee

Lok SabhaHooghly · West Bengal

MP score96/10040th of 539 in the 17th Lok Sabha
7th of 42 from West Bengal
  • Payments concentrated with one vendor

    53% of vendor payments went to EVANA ELECTRICALS PRIVATE LIMITED.

Allocated limit

₹9.77 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.77 Cr recommended · 307 works
About the median

Paid to vendors

₹9.77 Cr

100% of allocation
Above median (88%)

Works completed

307

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP307 works

    ₹9.77 Cr · 100% of the ₹9.77 Cr allocated

  2. Sanctioned by the district307 works

    100% sanctioned · took 43 days on average (due within 45 days)

  3. Completed307 works

    ₹9.77 Cr final cost · 16.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 307 works worth ₹9.77 Cr, a fund utilisation of 100%, higher than 100% of 17th Lok Sabha MPs.
  • The district has sanctioned 307 of them, taking 43 days on average.
  • ₹9.77 Cr has been paid to vendors, 100% of the allocation.
  • 307 works are complete, typically 16.8 months after recommendation. 307 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 6 vendors. The largest received 53%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 96/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    59
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: EVANA ELECTRICALS PRIVATE LIMITED, 53% of payments across 6 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

307 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Girls Tiolet at Goswami Malipara Girls High School Within G Malipara GP Under Polba Dadpur Dev. Block

    Sanitation & drainageConstruction of toilet blocks· Hooghly· #125850

    ₹3.5 L Completed 10 Sept 2026Rec. 12 Mar 2024Paid ₹3.5 L
  • Construction of Girls Tiolet at Birpala Adibasi Primary School Within Akna GP Under Polba Dadpur Dev. Block

    Sanitation & drainageConstruction of toilet blocks· Hooghly· #125851

    ₹2.7 L Completed 10 Sept 2026Rec. 12 Mar 2024Paid ₹2.7 L
  • Construction of Boundarywall at Danrpur J.K.S High School Within Babnan GP Under Polba Dadpur Dev. Block

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Hooghly· #125849

    ₹7.4 L Completed 9 Sept 2026Rec. 12 Mar 2024Paid ₹7.4 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63115

    ₹2.6 L Completed 15 Oct 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Installation 25 nos 6 meter solar 15 W DC LED Street light Non Integrated haveing lumen output minimum 1900 LM with battery pack 12.8v Lifepo4 24ah( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided)

    Electricity & lightingLighting of public spaces· Hooghly· #63117

    ₹14.9 L Completed 15 Oct 2025Rec. 15 Dec 2023Paid ₹14.9 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63113

    ₹2.6 L Completed 25 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63114

    ₹2.6 L Completed 25 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63087

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63088

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63089

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63090

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63092

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63093

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63097

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L
  • Intallation of 8 meter solar semi high mast with 4x 30W DC food light semi Integrated haveing lumen output minimum 4200x 4=16800 LM with battery pack Lifepo4 30ah x 4 nos12.8 v with 400wp panel. ( LM 79 report from NABL, & Design reports, brand's TDS & OEM'S to be provided

    Electricity & lightingLighting of public spaces· Hooghly· #63098

    ₹2.6 L Completed 18 Sept 2025Rec. 15 Dec 2023Paid ₹2.6 L

17th Lok Sabha MPs from West Bengal

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kalyan Banerjee · Sreerampur100%98%11199
2Ms Mimi Chakraborty · Jadavpur100%96%25097
3Shri Abhishek Banerjee · Diamond Harbour100%97%14997
4Ms Mahua Moitra · Krishnanagar100%100%2797
5Pratima Mondal · Joynagar100%97%14096
6Smt Sajda Ahmed · Uluberia96%96%18096
7Smt Locket Chatterjee · Hooghly100%100%30796
8Smt Satabdi Roy (Banerjee) · Birbhum100%99%12795
9Shri Kunar Hembram · Jhargram100%100%3195
10Dr Sukanta Majumdar · Balurghat94%82%33695
11Asit Kumar Mal · Bolpur100%100%5594
12Shri Deepak (Dev) Adhikari · Ghatal93%87%19594

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.