Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Jyotirmay Singh Mahato

Lok SabhaPurulia · West Bengal

MP score72/100429th of 539 in the 17th Lok Sabha
40th of 42 from West Bengal
Re-elected to the 18th Lok Sabha Then: 41% utilisation, 40 works completed, score 51.

Allocated limit

₹9.28 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹9.28 Cr recommended · 131 works
About the median

Paid to vendors

₹5.16 Cr

56% of allocation
Below median (88%)

Works completed

61

47% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP131 works

    ₹9.28 Cr · 100% of the ₹9.28 Cr allocated

  2. Sanctioned by the district131 works

    100% sanctioned · took 13.1 months on average (due within 45 days)

  3. Completed61 works

    ₹4.10 Cr final cost · 26.1 months from recommendation on average

In plain words

What the numbers say

  • Recommended 131 works worth ₹9.28 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 131 of them, taking 13.1 months on average.
  • ₹5.16 Cr has been paid to vendors, 56% of the allocation.
  • 61 works are complete, typically 26.1 months after recommendation. 61 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 8 vendors. The largest received 48%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 72/100: finishing works counts most

  1. Works completed 30%47Completed ÷ recommended works.
  2. Spending efficiency 20%79Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%56Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    65
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SOUMENDRA NATH MANNA, 48% of payments across 8 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

131 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning.

    Electricity & lightingLighting of public spaces· Purulia· #106690

    ₹5.0 L Completed 8 Oct 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Solar water Treatment Plant and Drinking water:1 HP Solar Water Pump,SPVModule:1200Wp,Module Mounting Structure:Set,Controller:1No,1HP Submersible Water Pump with pipe-1 set,Water Storage Tank-Capacity 3000 Ltr.2 Nos,Cable & Accessories: 1 ste,Tap 4 Nos,including boring 250 to 300 ft.

    Drinking waterProviding supply pipelines for drinking water· Purulia· #112112

    ₹8.0 L Completed 8 Oct 2026Rec. 22 Feb 2024Paid ₹8.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning

    Electricity & lightingLighting of public spaces· Purulia· #117919

    ₹5.0 L Completed 8 Oct 2026Rec. 1 Mar 2024Paid ₹5.0 L
  • GIRLS TOILET

    Education & librariesConstruction of rooms and halls in school and colleges· Purulia· #106457

    ₹4.3 L Completed 6 Oct 2026Rec. 16 Feb 2024Paid ₹4.3 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning.

    Electricity & lightingLighting of public spaces· Purulia· #106646

    ₹5.0 L Completed 6 Oct 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning.

    Electricity & lightingLighting of public spaces· Purulia· #106649

    ₹5.0 L Completed 6 Oct 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning

    Electricity & lightingLighting of public spaces· Purulia· #106691

    ₹5.0 L Completed 6 Oct 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning

    Electricity & lightingLighting of public spaces· Purulia· #106724

    ₹5.0 L Completed 6 Oct 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • BOUNDARY

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Purulia· #108921

    ₹11.9 L Completed 6 Oct 2026Rec. 19 Feb 2024Paid ₹11.9 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning

    Electricity & lightingLighting of public spaces· Purulia· #111586

    ₹5.0 L Completed 6 Oct 2026Rec. 22 Feb 2024Paid ₹5.0 L
  • Deep Tube well with Connection Underground pipeline and supply line toilets and bathroom of hostel campus.

    Drinking waterInstalling tube-wells and borewells· Purulia· #113413

    ₹9.6 L Completed 6 Oct 2026Rec. 23 Feb 2024Paid ₹9.6 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning.

    Electricity & lightingLighting of public spaces· Purulia· #106687

    ₹5.0 L Completed 3 Sept 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning

    Electricity & lightingLighting of public spaces· Purulia· #106725

    ₹5.0 L Completed 3 Sept 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Boundary Wall

    Education & librariesConstruction of rooms and halls in school and colleges· Purulia· #110959

    ₹20.0 L Completed 3 Sept 2026Rec. 21 Feb 2024Paid ₹20.0 L
  • Solar High Mast Tower Light: Luminaries 4 nos. 80 watt LED base light, four arm Bracket & Pole: 12 Mtr. with each complete with Panel Box & all accessories including timer switch, foundation, and erection & commissioning.

    Electricity & lightingLighting of public spaces· Purulia· #106647

    ₹5.0 L Completed 23 Jul 2026Rec. 16 Feb 2024Paid ₹5.0 L

17th Lok Sabha MPs from West Bengal

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kalyan Banerjee · Sreerampur100%98%11199
2Ms Mimi Chakraborty · Jadavpur100%96%25097
3Shri Abhishek Banerjee · Diamond Harbour100%97%14997
4Ms Mahua Moitra · Krishnanagar100%100%2797
5Pratima Mondal · Joynagar100%97%14096
6Smt Sajda Ahmed · Uluberia96%96%18096
7Smt Locket Chatterjee · Hooghly100%100%30796
8Smt Satabdi Roy (Banerjee) · Birbhum100%99%12795
9Shri Kunar Hembram · Jhargram100%100%3195
10Dr Sukanta Majumdar · Balurghat94%82%33695
11Asit Kumar Mal · Bolpur100%100%5594
12Shri Deepak (Dev) Adhikari · Ghatal93%87%19594

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.