7th of 11 from Kerala
Allocated limit
₹12.43 Cr
Median ₹14.70 Cr
Fund utilisation
77%
₹9.62 Cr recommended · 190 works
Above median (70%)
Paid to vendors
₹2.42 Cr
19% of allocation
Below median (25%)
Works completed
45
24% of recommended
Below median (26%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP190 works
₹9.62 Cr · 77% of the ₹12.43 Cr allocated
- Sanctioned by the district107 works
56% sanctioned · took 7.0 months on average (due within 45 days)
- Completed45 works
₹1.77 Cr final cost · 16.1 months from recommendation on average
83 works are still awaiting sanction, 73 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 190 works worth ₹9.62 Cr, a fund utilisation of 77%, higher than 57% of Rajya Sabha MPs.
- The district has sanctioned 107 of them, taking 7.0 months on average.
- ₹2.42 Cr has been paid to vendors, 19% of the allocation.
- 45 works are complete, typically 16.1 months after recommendation. 41 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 43 vendors. The largest received 8.7%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 59/100: finishing works counts most
- Works completed 30%24Completed ÷ recommended works.
- Spending efficiency 20%73Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%77Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%91Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%19Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: VE Commercial Vehicles Ltd, 8.7% of payments across 43 vendors.
District sanction speed
55/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%55Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
190 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of Vakkethara – Chettikkary Colony Road (Cat: SC)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kottayam· #158029
₹9.5 L Completed 28 Oct 2026Rec. 11 Dec 2024Paid ₹9.5 LConstruction of Kuttikkal Puthukootty Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #202215
₹3.9 L Completed 27 Oct 2026Rec. 21 May 2025Paid ₹3.9 LConstruction of Ambittampotti – Mahilasamajam Puzha Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #158027
₹5.0 L Completed 26 Oct 2026Rec. 11 Dec 2024Paid ₹5.0 LConstruction of Kolakandam Varadempadam Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #202199
₹6.0 L Physical Inspection · 24 Oct 2026Rec. 21 May 2025Paid ₹6.0 LConstruction of Cheruserikunnu Menamparambu Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kottayam· #323799
₹4.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026Construction of Punnathura Pazhayapally Thiruvambady Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kottayam· #202225
₹4.4 L Completed 16 Oct 2026Rec. 21 May 2025Paid ₹4.4 LCompletion of Pottadi ST Unnathi Road Cat ST
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #244505
₹4.0 L Sanctioned · 16 Oct 2026Rec. 29 Oct 2025Completion of Karimba ST Unnathi Road Cat ST
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #244506
₹4.0 L Sanctioned · 16 Oct 2026Rec. 29 Oct 2025Completion of Construction of Maridom Public Library Building and other related works
Education & librariesConstruction of public libraries and reading rooms· Kottayam· #320381
₹10.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Installation of Mini Mast Light at Karimbumkala
Electricity & lightingLighting of public spaces· Kottayam· #320383
₹2.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Installation of Mini Mast Light at Uravupuram Madrasapady
Electricity & lightingLighting of public spaces· Malappuram· #320385
₹2.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Construction of Neezhukad - Aniyellam Parambu Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #320386
₹5.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Installation of Mini Mast Light at Thenmala Eco Toursim Damsite
Electricity & lightingLighting of public spaces· Kollam· #320387
₹2.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026Installation of Mini Mast Light at Vallichira Cherukara Junction
Electricity & lightingLighting of public spaces· Kottayam· #160442
₹1.9 L Completed 5 Oct 2026Rec. 20 Dec 2024Paid ₹1.9 LInstallation of Mini Mast Light at Nechipuzhoor Elapozhuthu Temple area
Electricity & lightingLighting of public spaces· Kottayam· #172454
₹1.9 L Completed 5 Oct 2026Rec. 4 Feb 2025Paid ₹1.9 L
Rajya Sabha MPs from Kerala
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Abdul Wahab | 86% | 32% | 132 | 68 |
| 2 | Smt. P. T. Usha | 74% | 32% | 54 | 65 |
| 3 | Smt. Jebi Mather Hisham | 69% | 25% | 52 | 65 |
| 4 | Dr. John Brittas | 94% | 29% | 40 | 63 |
| 5 | Shri A. A. Rahim | 52% | 29% | 33 | 61 |
| 6 | Dr. V. Sivadasan | 98% | 12% | 34 | 60 |
| 7 | Shri Jose K. Mani | 77% | 19% | 45 | 59 |
| 8 | Shri Sandosh Kumar P | 68% | 26% | 40 | 59 |
| 9 | Shri P. P. Suneer | 70% | 17% | 22 | 55 |
| 10 | Shri Haris Beeran | 87% | 17% | 20 | 54 |
| 11 | Shri C. Sadanandan Master | 94% | 0% | 0 | 20 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.