Skip to content
MPLADSTracker

MPLADS report card · Rajya Sabha

Shri Abdul Wahab

Rajya SabhaIUMLTerm 2021–2027Kerala

MP score68/10039th of 235 in the Rajya Sabha
1st of 11 from Kerala

Allocated limit

₹31.27 Cr

Median ₹14.70 Cr

Fund utilisation

86%

₹27.01 Cr recommended · 374 works
Above median (70%)

Paid to vendors

₹9.87 Cr

32% of allocation
Above median (25%)

Works completed

132

35% of recommended
Above median (26%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP374 works

    ₹27.01 Cr · 86% of the ₹31.27 Cr allocated

  2. Sanctioned by the district249 works

    67% sanctioned · took 6.2 months on average (due within 45 days)

  3. Completed132 works

    ₹8.79 Cr final cost · 9.7 months from recommendation on average

125 works are still awaiting sanction, 120 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 374 works worth ₹27.01 Cr, a fund utilisation of 86%, higher than 71% of Rajya Sabha MPs.
  • The district has sanctioned 249 of them, taking 6.2 months on average.
  • ₹9.87 Cr has been paid to vendors, 32% of the allocation.
  • 132 works are complete, typically 9.7 months after recommendation. 117 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 127 vendors. The largest received 5.8%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 68/100: finishing works counts most

  1. Works completed 30%35Completed ÷ recommended works.
  2. Spending efficiency 20%89Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%86Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%89Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%32Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SML ISUZU LTD, 5.8% of payments across 127 vendors.

District sanction speed

62/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%62Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

374 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of road, retaining wall and drainage at Janathapadi Padikkunnu PVS school- Pattarakka link road or pathway, Ward no. 24, Nilambur Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #260707

    ₹28.0 L Sanctioned · 31 Oct 2026Rec. 21 Jan 2026
  • Construction of Side protection and road at Christian church -Lulu mall colony road/pathway, Ward No.19, Pothukkal Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #323865

    ₹15.0 L Sanctioned · 31 Oct 2026Rec. 22 Oct 2026
  • Construction of Vadakkeparamb road or pathway, ward no.16, Manjeri Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #325409

    ₹80,000 Awaiting sanction · 1 daysRec. 31 Oct 2026
  • Construction of Vetekkode Harijan Nagar road or pathway, ward No.16, Manjeri Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #325464

    ₹1.3 L Awaiting sanction · 1 daysRec. 31 Oct 2026
  • Construction of Thekkechala road or pathway, ward No.16, Manjeri Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #325465

    ₹2.9 L Awaiting sanction · 1 daysRec. 31 Oct 2026
  • Purchasing of Smart TV for AMLPS Pullancheri, Manjeri Municipality

    Education & librariesPurchase of smart boards, visual display units and projectors· Malappuram· #288726

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 24 Jun 2026
  • Construction of Perumunda SC Nagar road or pathway, Ward No. 13, Chaliyar Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #325200

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Mattakadu XIME College road or pathway, ward no.12, Kalamassery Municipality

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #182236

    ₹15.0 L Sanctioned · 29 Oct 2026Rec. 16 Mar 2025
  • Setting up of High mast light at E Ahmed Sahib Memmorial ground, Ward No. 12, Karulai Panchayat

    Electricity & lightingLighting of public spaces· Malappuram· #288727

    ₹5.3 L Sanctioned · 29 Oct 2026Rec. 24 Jun 2026
  • Construction of Myladi school kunnu road or pathway, Ward No.10, Chaliyar Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #323864

    ₹10.0 L Sanctioned · 29 Oct 2026Rec. 22 Oct 2026
  • Construction of Pelathodi road or pathway, Ward No.23, Kodur Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #321692

    ₹3.0 L Sanctioned · 28 Oct 2026Rec. 12 Oct 2026
  • Installation of UWSS Pipeline at Malaparamb area, Ward No.15, Anakayam Panchayat

    Drinking waterProviding supply pipelines for drinking water· Malappuram· #324739

    ₹5.0 L Awaiting sanction · 4 daysRec. 28 Oct 2026
  • Setting up of Minimast light at Eriyad Collegepadi, Ward No. 07, Thiruvali Panchayat

    Electricity & lightingLighting of public spaces· Malappuram· #220991

    ₹2.2 L Completed 24 Oct 2026Rec. 22 Jul 2025Paid ₹2.2 L
  • Setting up of Low mast light at Kumbala town in Kumbala - Badiyidukka road, Ward no.22, Kumbala Panchayat

    Electricity & lightingLighting of public spaces· Kasaragod· #182020

    ₹2.0 L Sanctioned · 22 Oct 2026Rec. 15 Mar 2025
  • Construction of Kandungal Ayyapankunn Chenniparamb road or pathway, Ward no 14, Kodiyathur Panchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #220580

    ₹10.0 L Sanctioned · 22 Oct 2026Rec. 21 Jul 2025

Rajya Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Abdul Wahab86%32%13268
2Smt. P. T. Usha74%32%5465
3Smt. Jebi Mather Hisham69%25%5265
4Dr. John Brittas94%29%4063
5Shri A. A. Rahim52%29%3361
6Dr. V. Sivadasan98%12%3460
7Shri Jose K. Mani77%19%4559
8Shri Sandosh Kumar P68%26%4059
9Shri P. P. Suneer70%17%2255
10Shri Haris Beeran87%17%2054
11Shri C. Sadanandan Master94%0%020

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.