Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Devusinh Jesingbhai Chauhan

Lok SabhaKheda · Gujarat

MP score81/100324th of 539 in the 17th Lok Sabha
23rd of 26 from Gujarat
Re-elected to the 18th Lok Sabha Then: 98% utilisation, 265 works completed, score 61.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

84%

₹8.23 Cr recommended · 425 works
Below median (98%)

Paid to vendors

₹7.10 Cr

72% of allocation
Below median (88%)

Works completed

403

95% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP425 works

    ₹8.23 Cr · 84% of the ₹9.81 Cr allocated

  2. Sanctioned by the district425 works

    100% sanctioned · took 6.1 months on average (due within 45 days)

  3. Completed403 works

    ₹7.06 Cr final cost · 15.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 425 works worth ₹8.23 Cr, a fund utilisation of 84%, higher than 8.4% of 17th Lok Sabha MPs.
  • The district has sanctioned 425 of them, taking 6.1 months on average.
  • ₹7.10 Cr has been paid to vendors, 72% of the allocation.
  • 403 works are complete, typically 15.8 months after recommendation. 85 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 215 vendors. The largest received 2.8%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 81/100: finishing works counts most

  1. Works completed 30%95Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%21Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%72Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DG CONSTRUCTION, 2.8% of payments across 215 vendors.

District sanction speed

78/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%78Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

425 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Paver Block Road Work At Rinchhol Tambe Sonpura Raghri Mataji Mandir Chowk Nearby Area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #57453

    ₹2.9 L Completed 27 Sept 2026Rec. 6 Dec 2023Paid ₹2.9 L
  • Construction of Paver Block Work at Verai Mataji Mandir Faliya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #34990

    ₹49,940 Completed 25 Sept 2026Rec. 9 Oct 2023Paid ₹49,940
  • Construction of C.C Road Work At Dumral Balmandir to Pithai Mataji Mandir

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #34997

    ₹1.3 L Completed 25 Sept 2026Rec. 9 Oct 2023Paid ₹1.3 L
  • In Rohitwas, Behind bus stand

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #40819

    ₹2.0 L Completed 25 Sept 2026Rec. 26 Oct 2023Paid ₹2.0 L
  • Nearby Swaminarayan Mandir Road Devlopment Work (2022-23)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #16086

    ₹2.0 L Completed 24 Sept 2026Rec. 4 Sep 2023Paid ₹2.0 L
  • Year : 2022-23 General Grant Protection wall work of crematorium at Khambhali village

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Kheda· #18061

    ₹1.5 L Completed 18 Sept 2026Rec. 8 Sep 2023Paid ₹1.5 L
  • Year : 2022-23 General Grant CC road work in Baliadev area at Virol village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #18063

    ₹98,135 Completed 18 Sept 2026Rec. 8 Sep 2023Paid ₹98,135
  • 10.003 - Construction of culverts and bridges, Vehra Upar Kalabhai Babbabhai House Area, Remark _ Slap Drain

    Roads & bridgesConstruction of culverts and bridges· Kheda· #97459

    ₹2.9 L Completed 18 Sept 2026Rec. 5 Feb 2024Paid ₹2.9 L
  • Construction of Creamatorium at Nayaka Village

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Kheda· #76081

    ₹4.0 L Completed 10 Sept 2026Rec. 4 Jan 2024Paid ₹4.0 L
  • Year : 2022-23 General Grant CC road work from the main road towards Ravjibhai Manibhai's house at Jalbhai's Muwadi village under Rudan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #18083

    ₹98,226 Completed 6 Aug 2026Rec. 8 Sep 2023Paid ₹98,226
  • Year : 2022-23 General Grant CC road work missing link from the main road towards vagha talavadi at Jalbhai's Muwadi village under Rudan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #18084

    ₹98,090 Completed 6 Aug 2026Rec. 8 Sep 2023Paid ₹98,090
  • Year : 2022-23 General Grant Paver block work from the main road towards the house of Balabhai Ravjibhai at Jalbhai's Muwadi village under Rudan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #18085

    ₹49,310 Completed 6 Aug 2026Rec. 8 Sep 2023Paid ₹49,310
  • Sr- 14, Construction of C.C Work, Vinubhai Bhikhabhai Dabhi House towards Main Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #41367

    ₹99,979 Completed 31 Jul 2026Rec. 28 Oct 2023Paid ₹99,979
  • Year : 2022-23 General Grant Installing tube-well and related work of Panchayat's main bore in kanjoda village

    Drinking waterInstalling tube-wells and borewells· Kheda· #16056

    ₹2.5 L Completed 30 Jul 2026Rec. 4 Sep 2023Paid ₹2.5 L
  • (Year 2022-23) General Work scheduled cast Construction of CC road work in Valmiki Vas at Hatnoli village of Nadiad taluka.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #17890

    ₹1.9 L Completed 30 Jul 2026Rec. 8 Sep 2023Paid ₹1.9 L

17th Lok Sabha MPs from Gujarat

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Dr K C Patel · Valsad98%98%29898
2C R Patil · Navsari97%92%15097
3Shri Mohanbhai Kalyanji Kundariya · Rajkot100%100%26594
4Dipsinh Shankarsinh Rathod · Sabarkantha96%88%19593
5Hasmukh Bhai Soma Bhai Patel · Ahmedabad East92%87%14692
6Naranbhai Bhikhabhai Kachhadiya · Amreli93%84%22591
7Bharatiben Dhirubhai Shyal · Bhavnagar89%83%32691
8Bharatsinhji Shankarji Dabhi · Patan94%84%19791
9Smt Shardaben Anilbhai Patel · Mahesana100%87%40991
10Smt Poonamben Hematbhai Maadam · Jamnagar66%64%24590
11Parbatbhai Savabhai Patel · Banaskantha97%87%12390
12Smt Gitaben Vajesingbhai Rathva · Chhota Udaipur95%85%29889

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.