Bharatiben Dhirubhai Shyal

Lok SabhaBhavnagar · Gujarat

MP score91/100134th of 539 in the 17th Lok Sabha
7th of 26 from Gujarat

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

89%

₹8.69 Cr recommended · 369 works
Below median (98%)

Paid to vendors

₹8.15 Cr

83% of allocation
Below median (88%)

Works completed

326

88% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP369 works

    ₹8.69 Cr · 89% of the ₹9.81 Cr allocated

  2. Sanctioned by the district369 works

    100% sanctioned · took 5.2 months on average (due within 45 days)

  3. Completed326 works

    ₹7.69 Cr final cost · 12.1 months from recommendation on average

In plain words

What the numbers say

  • Recommended 369 works worth ₹8.69 Cr, a fund utilisation of 89%, higher than 15% of 17th Lok Sabha MPs.
  • The district has sanctioned 369 of them, taking 5.2 months on average.
  • ₹8.15 Cr has been paid to vendors, 83% of the allocation.
  • 326 works are complete, typically 12.1 months after recommendation. 306 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 231 vendors. The largest received 3.0%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 91/100: finishing works counts most

  1. Works completed 30%88Completed ÷ recommended works.
  2. Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%89Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%94Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%83Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: J B GOHIL, 3.0% of payments across 231 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

369 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • For the work of constructing Dr. Babasaheb Ambedkar Hall on Veerawali Road

    Community buildings & public spacesConstruction of community centers and community halls· Botad· #35911

    ₹3.9 L Completed 17 Sept 2026Rec. 11 Oct 2023Paid ₹3.9 L
  • Construction of roads

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Botad· #40246

    ₹2.0 L Completed 17 Sept 2026Rec. 25 Oct 2023Paid ₹2.0 L
  • Construction of roads

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Botad· #40249

    ₹2.0 L Completed 17 Sept 2026Rec. 25 Oct 2023Paid ₹2.0 L
  • Construction of roads, approach roads peving blok

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Botad· #40284

    ₹2.0 L Completed 17 Sept 2026Rec. 25 Oct 2023Paid ₹2.0 L
  • For the work of No-33 of Pre Casta Benches

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Botad· #99771

    ₹97,212 Completed 17 Sept 2026Rec. 8 Feb 2024Paid ₹97,212
  • khatli and stainless steel naami khatli

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Botad· #127496

    ₹85,000 Completed 17 Sept 2026Rec. 13 Mar 2024Paid ₹85,000
  • Construction of benches in public

    Irrigation, flood & environmentConstruction of public irrigation facilities· Bhavnagar· #33295

    ₹0 Completed 27 Mar 2026Rec. 6 Oct 2023
  • Pre.Cast benches work 15

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Bhavnagar· #58929

    ₹0 Completed 27 Mar 2026Rec. 8 Dec 2023
  • Pre.Cast benches work 15

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Bhavnagar· #59455

    ₹0 Completed 27 Mar 2026Rec. 9 Dec 2023
  • A cremation pyre and steel at Fariadka village

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Bhavnagar· #107485

    ₹75,380 Completed 2 Mar 2026Rec. 17 Feb 2024Paid ₹75,380
  • CC For the work of the road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhavnagar· #107554

    ₹2.3 L Completed 21 Feb 2026Rec. 17 Feb 2024Paid ₹2.3 L
  • For the work of women bathing at Dalit Samaj Cemetery

    Sanitation & drainageConstruction of public toilets and bathrooms· Bhavnagar· #48905

    ₹3.1 L Completed 20 Feb 2026Rec. 11 Nov 2023Paid ₹3.1 L
  • prescast- benches no-40

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Bhavnagar· #72847

    ₹1.2 L Completed 20 Feb 2026Rec. 1 Jan 2024Paid ₹1.2 L
  • Pavig Block in Desainagar Bazar area

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Bhavnagar· #98640

    ₹36,000 Completed 20 Feb 2026Rec. 15 Mar 2024Paid ₹36,000
  • Construction of rooms a high school room

    Education & librariesConstruction of rooms and halls in school and colleges· Bhavnagar· #107563

    ₹5.0 L Completed 20 Feb 2026Rec. 17 Feb 2024Paid ₹5.0 L

17th Lok Sabha MPs from Gujarat

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Dr K C Patel · Valsad98%98%29898
2C R Patil · Navsari97%92%15097
3Shri Mohanbhai Kalyanji Kundariya · Rajkot100%100%26594
4Dipsinh Shankarsinh Rathod · Sabarkantha96%88%19593
5Hasmukh Bhai Soma Bhai Patel · Ahmedabad East92%87%14692
6Naranbhai Bhikhabhai Kachhadiya · Amreli93%84%22591
7Bharatiben Dhirubhai Shyal · Bhavnagar89%83%32691
8Bharatsinhji Shankarji Dabhi · Patan94%84%19791
9Smt Shardaben Anilbhai Patel · Mahesana100%87%40991
10Smt Poonamben Hematbhai Maadam · Jamnagar66%64%24590
11Parbatbhai Savabhai Patel · Banaskantha97%87%12390
12Smt Gitaben Vajesingbhai Rathva · Chhota Udaipur95%85%29889

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.