Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Dr K C Patel

Lok SabhaST seatValsad · Gujarat

MP score98/1009th of 539 in the 17th Lok Sabha
1st of 26 from Gujarat

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹9.64 Cr recommended · 298 works
About the median

Paid to vendors

₹9.64 Cr

98% of allocation
Above median (88%)

Works completed

298

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP298 works

    ₹9.64 Cr · 98% of the ₹9.81 Cr allocated

  2. Sanctioned by the district298 works

    100% sanctioned · took 42 days on average (due within 45 days)

  3. Completed298 works

    ₹9.64 Cr final cost · 11.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 298 works worth ₹9.64 Cr, a fund utilisation of 98%, higher than 52% of 17th Lok Sabha MPs.
  • The district has sanctioned 298 of them, taking 42 days on average.
  • ₹9.64 Cr has been paid to vendors, 98% of the allocation.
  • 298 works are complete, typically 11.9 months after recommendation. 273 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 240 vendors. The largest received 2.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 98/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%92Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%98Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Jaynesh H Patel, 2.2% of payments across 240 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

298 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Paver block work in Patel faliya at Darapada village.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dangs· #77798

    ₹5.0 L Completed 26 Mar 2026Rec. 8 Jan 2024Paid ₹5.0 L
  • Drainage work for 900 mm from to Tetu faliya at Borigawantha village.

    Sanitation & drainageProviding drains and gutters for public drainage· Dangs· #77794

    ₹5.0 L Completed 7 Mar 2026Rec. 8 Jan 2024Paid ₹5.0 L
  • Work on procuring fully equipped (AC) Ambulance BS6 vehicle for Valsad Raktdan Kendra to treat sickle cell patients

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Valsad· #105857

    ₹15.0 L Completed 6 Feb 2026Rec. 15 Feb 2024Paid ₹15.0 L
  • Construction of sheet shed on public space in Desai faliya at Nadgadhari village

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Navsari· #105589

    ₹3.0 L Completed 16 Jan 2026Rec. 15 Feb 2024Paid ₹3.0 L
  • Road work to Keshubhai's house from the main road at Chorwani village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Navsari· #78499

    ₹2.5 L Completed 23 Dec 2025Rec. 9 Jan 2024Paid ₹2.5 L
  • Construction of pickup stand on main road at Hanamatmal village

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Valsad· #78678

    ₹3.5 L Completed 16 Dec 2025Rec. 9 Jan 2024Paid ₹3.5 L
  • Construction of pickup stand at Bopi village

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Valsad· #78707

    ₹3.5 L Completed 16 Dec 2025Rec. 9 Jan 2024Paid ₹3.5 L
  • Water tank with bore near Dungarpada gulab Patkar's house at Manda village.

    Drinking waterConstruction of water tanks· Valsad· #77920

    ₹2.5 L Completed 16 Oct 2025Rec. 8 Jan 2024Paid ₹2.5 L
  • Cultural Stage work in Shanwarpada Primary School at Manda village

    Community buildings & public spacesConstruction of buildings for community cultural activities· Valsad· #77921

    ₹2.5 L Completed 16 Oct 2025Rec. 8 Jan 2024Paid ₹2.5 L
  • C.C.T.V. and WiFi connectivity With the accompanying facility from Angam Road and Sanjan Udwa Road at Sanjan village.

    Safety & securityProviding CCTV camera system for security of public areas· Valsad· #77932

    ₹4.9 L Completed 10 Oct 2025Rec. 8 Jan 2024Paid ₹4.9 L
  • C.C.T.V. and WiFi connectivity With the accompanying facility on station road and Nargol road, Umargam road, Bhilad road at Sanjan village.

    Safety & securityProviding CCTV camera system for security of public areas· Valsad· #77933

    ₹4.9 L Completed 10 Oct 2025Rec. 8 Jan 2024Paid ₹4.9 L
  • L.E.D. Highmost Tower work in Piru faliya, Mandir faliya at Dhamdachi village.

    Electricity & lightingStreet lights· Valsad· #77370

    ₹2.4 L Completed 26 Sept 2025Rec. 8 Jan 2024Paid ₹2.4 L
  • Solar light work with pole at Sakarpatal village.

    Electricity & lightingLighting of public spaces· Dangs· #77805

    ₹4.9 L Completed 26 Sept 2025Rec. 8 Jan 2024Paid ₹4.9 L
  • Solar light work with pole in Manmodi Group Gram Panchayat

    Electricity & lightingLighting of public spaces· Dangs· #77808

    ₹4.9 L Completed 26 Sept 2025Rec. 8 Jan 2024Paid ₹4.9 L
  • Paverblock work in Suryadarshan Society at Teethal village

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Valsad· #77479

    ₹2.5 L Completed 25 Sept 2025Rec. 8 Jan 2024Paid ₹2.5 L

17th Lok Sabha MPs from Gujarat

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Dr K C Patel · Valsad98%98%29898
2C R Patil · Navsari97%92%15097
3Shri Mohanbhai Kalyanji Kundariya · Rajkot100%100%26594
4Dipsinh Shankarsinh Rathod · Sabarkantha96%88%19593
5Hasmukh Bhai Soma Bhai Patel · Ahmedabad East92%87%14692
6Naranbhai Bhikhabhai Kachhadiya · Amreli93%84%22591
7Bharatiben Dhirubhai Shyal · Bhavnagar89%83%32691
8Bharatsinhji Shankarji Dabhi · Patan94%84%19791
9Smt Shardaben Anilbhai Patel · Mahesana100%87%40991
10Smt Poonamben Hematbhai Maadam · Jamnagar66%64%24590
11Parbatbhai Savabhai Patel · Banaskantha97%87%12390
12Smt Gitaben Vajesingbhai Rathva · Chhota Udaipur95%85%29889

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.