4th of 26 from Gujarat
Allocated limit
₹7.36 Cr
Median ₹8.60 Cr
Fund utilisation
96%
₹7.04 Cr recommended · 216 works
About the median
Paid to vendors
₹6.44 Cr
88% of allocation
About the median
Works completed
195
90% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP216 works
₹7.04 Cr · 96% of the ₹7.36 Cr allocated
- Sanctioned by the district215 works
100% sanctioned · took 5.3 months on average (due within 45 days)
- Completed195 works
₹6.43 Cr final cost · 14.3 months from recommendation on average
1 works are still awaiting sanction, 1 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 216 works worth ₹7.04 Cr, a fund utilisation of 96%, higher than 34% of 17th Lok Sabha MPs.
- The district has sanctioned 215 of them, taking 5.3 months on average.
- ₹6.44 Cr has been paid to vendors, 88% of the allocation.
- 195 works are complete, typically 14.3 months after recommendation. 161 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Irrigation, flood & environment.
- Payments went to 89 vendors. The largest received 16%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 93/100: finishing works counts most
- Works completed 30%90Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%83Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%88Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: DEESHA CIVIL ENGINEERING DESIGN, 16% of payments across 89 vendors.
District sanction speed
82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
216 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Kamalpur Village In Sheds Work in Panchavti.
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sabar Kantha· #54714
₹4.0 L Completed 24 Sept 2026Rec. 30 Nov 2023Paid ₹4.0 LWorking of Majur Kendra at Munpur village
Community buildings & public spacesConstruction of community centers and community halls· Sabar Kantha· #75534
₹5.0 L Completed 27 Aug 2026Rec. 5 Jan 2024Paid ₹5.0 LSarsav Village In Protection Wall Work From Asari Popatbhai Sulji's farm Asari Popatbhai Sulji's farm at Sarsav village Protection wall work next to the asphalt Road Side.
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sabar Kantha· #98239
₹4.8 L Completed 16 Jul 2026Rec. 6 Feb 2024Paid ₹4.8 LTalod-Rojhad Village In Swaminarayan Mandir agal Block Work
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sabar Kantha· #25121
₹2.0 L Completed 6 Apr 2026Rec. 23 Sep 2023Paid ₹2.0 LVijaynagarVillage Renovation of Ponds and Lake Work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54350
₹4.0 L Completed 13 Mar 2026Rec. 29 Nov 2023Paid ₹4.0 LPoshina Village In (small Irrigation) Renovation of ponds and lake work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54705
₹5.0 L Completed 13 Mar 2026Rec. 30 Nov 2023Paid ₹5.0 LPoshina Ratnpur Village In renovation Of Lake Work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66011
₹3.4 L Completed 13 Mar 2026Rec. 20 Dec 2023Paid ₹3.4 LKalchhavad Village In renovation Of Lake Work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66024
₹1.1 L Completed 13 Mar 2026Rec. 20 Dec 2023Paid ₹1.1 LLimda Village In renovation Of Lake Work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66038
₹1.9 L Completed 27 Feb 2026Rec. 20 Dec 2023Paid ₹1.9 LWork of prayer hall and compound wall in Santok Kripa Hostel run by Sri Santok Kripa Education Trust at Prantij village.
Education & librariesConstruction of rooms and halls in school and colleges· Sabar Kantha· #67133
₹7.0 L Completed 24 Feb 2026Rec. 21 Dec 2023Paid ₹7.0 LConstruction of new rooms at Santok Krupa Hostel (Bakshipanch) at Prantij village.
Education & librariesConstruction of rooms and halls in school and colleges· Sabar Kantha· #67134
₹4.1 L Completed 24 Feb 2026Rec. 21 Dec 2023Paid ₹4.1 L??????? ???? ????? ????? ???? ?????????? ?????? ???.
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sabar Kantha· #6497
₹4.0 L Completed 29 Jan 2026Rec. 27 Jul 2023Paid ₹4.0 LGaner Village Renovation Of Ponds and lake work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54199
₹2.5 L Completed 29 Jan 2026Rec. 29 Nov 2023Paid ₹2.5 LBordi Village In renovation Of Lake Work.
Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66029
₹2.2 L Completed 29 Jan 2026Rec. 20 Dec 2023Paid ₹2.2 L????? ???? ????????? ???? ???????? ??? ??? ??.??. ?????? ???.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sabar Kantha· #6498
₹3.5 L Completed 1 Dec 2025Rec. 27 Jul 2023Paid ₹3.5 L
17th Lok Sabha MPs from Gujarat
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr K C Patel · Valsad | 98% | 98% | 298 | 98 |
| 2 | C R Patil · Navsari | 97% | 92% | 150 | 97 |
| 3 | Shri Mohanbhai Kalyanji Kundariya · Rajkot | 100% | 100% | 265 | 94 |
| 4 | Dipsinh Shankarsinh Rathod · Sabarkantha | 96% | 88% | 195 | 93 |
| 5 | Hasmukh Bhai Soma Bhai Patel · Ahmedabad East | 92% | 87% | 146 | 92 |
| 6 | Naranbhai Bhikhabhai Kachhadiya · Amreli | 93% | 84% | 225 | 91 |
| 7 | Bharatiben Dhirubhai Shyal · Bhavnagar | 89% | 83% | 326 | 91 |
| 8 | Bharatsinhji Shankarji Dabhi · Patan | 94% | 84% | 197 | 91 |
| 9 | Smt Shardaben Anilbhai Patel · Mahesana | 100% | 87% | 409 | 91 |
| 10 | Smt Poonamben Hematbhai Maadam · Jamnagar | 66% | 64% | 245 | 90 |
| 11 | Parbatbhai Savabhai Patel · Banaskantha | 97% | 87% | 123 | 90 |
| 12 | Smt Gitaben Vajesingbhai Rathva · Chhota Udaipur | 95% | 85% | 298 | 89 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.