Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Dipsinh Shankarsinh Rathod

Lok SabhaSabarkantha · Gujarat

MP score93/100106th of 539 in the 17th Lok Sabha
4th of 26 from Gujarat

Allocated limit

₹7.36 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹7.04 Cr recommended · 216 works
About the median

Paid to vendors

₹6.44 Cr

88% of allocation
About the median

Works completed

195

90% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP216 works

    ₹7.04 Cr · 96% of the ₹7.36 Cr allocated

  2. Sanctioned by the district215 works

    100% sanctioned · took 5.3 months on average (due within 45 days)

  3. Completed195 works

    ₹6.43 Cr final cost · 14.3 months from recommendation on average

1 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 216 works worth ₹7.04 Cr, a fund utilisation of 96%, higher than 34% of 17th Lok Sabha MPs.
  • The district has sanctioned 215 of them, taking 5.3 months on average.
  • ₹6.44 Cr has been paid to vendors, 88% of the allocation.
  • 195 works are complete, typically 14.3 months after recommendation. 161 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Irrigation, flood & environment.
  • Payments went to 89 vendors. The largest received 16%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 93/100: finishing works counts most

  1. Works completed 30%90Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%83Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%88Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DEESHA CIVIL ENGINEERING DESIGN, 16% of payments across 89 vendors.

District sanction speed

82/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%82Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

216 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Kamalpur Village In Sheds Work in Panchavti.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Sabar Kantha· #54714

    ₹4.0 L Completed 24 Sept 2026Rec. 30 Nov 2023Paid ₹4.0 L
  • Working of Majur Kendra at Munpur village

    Community buildings & public spacesConstruction of community centers and community halls· Sabar Kantha· #75534

    ₹5.0 L Completed 27 Aug 2026Rec. 5 Jan 2024Paid ₹5.0 L
  • Sarsav Village In Protection Wall Work From Asari Popatbhai Sulji's farm Asari Popatbhai Sulji's farm at Sarsav village Protection wall work next to the asphalt Road Side.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sabar Kantha· #98239

    ₹4.8 L Completed 16 Jul 2026Rec. 6 Feb 2024Paid ₹4.8 L
  • Talod-Rojhad Village In Swaminarayan Mandir agal Block Work

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sabar Kantha· #25121

    ₹2.0 L Completed 6 Apr 2026Rec. 23 Sep 2023Paid ₹2.0 L
  • VijaynagarVillage Renovation of Ponds and Lake Work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54350

    ₹4.0 L Completed 13 Mar 2026Rec. 29 Nov 2023Paid ₹4.0 L
  • Poshina Village In (small Irrigation) Renovation of ponds and lake work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54705

    ₹5.0 L Completed 13 Mar 2026Rec. 30 Nov 2023Paid ₹5.0 L
  • Poshina Ratnpur Village In renovation Of Lake Work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66011

    ₹3.4 L Completed 13 Mar 2026Rec. 20 Dec 2023Paid ₹3.4 L
  • Kalchhavad Village In renovation Of Lake Work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66024

    ₹1.1 L Completed 13 Mar 2026Rec. 20 Dec 2023Paid ₹1.1 L
  • Limda Village In renovation Of Lake Work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66038

    ₹1.9 L Completed 27 Feb 2026Rec. 20 Dec 2023Paid ₹1.9 L
  • Work of prayer hall and compound wall in Santok Kripa Hostel run by Sri Santok Kripa Education Trust at Prantij village.

    Education & librariesConstruction of rooms and halls in school and colleges· Sabar Kantha· #67133

    ₹7.0 L Completed 24 Feb 2026Rec. 21 Dec 2023Paid ₹7.0 L
  • Construction of new rooms at Santok Krupa Hostel (Bakshipanch) at Prantij village.

    Education & librariesConstruction of rooms and halls in school and colleges· Sabar Kantha· #67134

    ₹4.1 L Completed 24 Feb 2026Rec. 21 Dec 2023Paid ₹4.1 L
  • ??????? ???? ????? ????? ???? ?????????? ?????? ???.

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Sabar Kantha· #6497

    ₹4.0 L Completed 29 Jan 2026Rec. 27 Jul 2023Paid ₹4.0 L
  • Ganer Village Renovation Of Ponds and lake work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #54199

    ₹2.5 L Completed 29 Jan 2026Rec. 29 Nov 2023Paid ₹2.5 L
  • Bordi Village In renovation Of Lake Work.

    Irrigation, flood & environmentRenovation of ponds and lakes· Sabar Kantha· #66029

    ₹2.2 L Completed 29 Jan 2026Rec. 20 Dec 2023Paid ₹2.2 L
  • ????? ???? ????????? ???? ???????? ??? ??? ??.??. ?????? ???.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Sabar Kantha· #6498

    ₹3.5 L Completed 1 Dec 2025Rec. 27 Jul 2023Paid ₹3.5 L

17th Lok Sabha MPs from Gujarat

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Dr K C Patel · Valsad98%98%29898
2C R Patil · Navsari97%92%15097
3Shri Mohanbhai Kalyanji Kundariya · Rajkot100%100%26594
4Dipsinh Shankarsinh Rathod · Sabarkantha96%88%19593
5Hasmukh Bhai Soma Bhai Patel · Ahmedabad East92%87%14692
6Naranbhai Bhikhabhai Kachhadiya · Amreli93%84%22591
7Bharatiben Dhirubhai Shyal · Bhavnagar89%83%32691
8Bharatsinhji Shankarji Dabhi · Patan94%84%19791
9Smt Shardaben Anilbhai Patel · Mahesana100%87%40991
10Smt Poonamben Hematbhai Maadam · Jamnagar66%64%24590
11Parbatbhai Savabhai Patel · Banaskantha97%87%12390
12Smt Gitaben Vajesingbhai Rathva · Chhota Udaipur95%85%29889

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.