Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Devusinh Jesingbhai Chauhan

Lok SabhaBJPKheda · Gujarat

MP score61/100203rd of 542 in the 18th Lok Sabha
18th of 26 from Gujarat
Also an MP in the 17th Lok Sabha Then: 84% utilisation, 403 works completed, score 81.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

98%

₹14.47 Cr recommended · 796 works
Above median (76%)

Paid to vendors

₹6.27 Cr

43% of allocation
Above median (37%)

Works completed

265

33% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP796 works

    ₹14.47 Cr · 98% of the ₹14.70 Cr allocated

  2. Sanctioned by the district497 works

    62% sanctioned · took 3.3 months on average (due within 45 days)

  3. Completed265 works

    ₹4.72 Cr final cost · 9.2 months from recommendation on average

299 works are still awaiting sanction, 226 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 796 works worth ₹14.47 Cr, a fund utilisation of 98%, higher than 90% of 18th Lok Sabha MPs.
  • The district has sanctioned 497 of them, taking 3.3 months on average.
  • ₹6.27 Cr has been paid to vendors, 43% of the allocation.
  • 265 works are complete, typically 9.2 months after recommendation. 123 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 166 vendors. The largest received 2.5%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 61/100: finishing works counts most

  1. Works completed 30%33Completed ÷ recommended works.
  2. Spending efficiency 20%75Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%46Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%43Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BHUVALDI GRAM PANCHAYAT, 2.5% of payments across 166 vendors.

District sanction speed

77/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%77Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

796 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Paver Block work in Pravinbhai Himmatbhai Faliya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303705

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work in Vishnubhai Kishabhai Faliya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303706

    ₹80,000 Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work in Jashbhai Prabhubhai Patel Faliya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303707

    ₹80,000 Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work in Chhotabhai Muljibhai Faliya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303709

    ₹70,000 Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work from Maheshbhai house to Chabutari area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303711

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work from Swaminarayan Temple towards Bhagol area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303712

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • CC Road work near Primary school

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303713

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • CC road work from NH 48 towards Shankrachary nagar

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303714

    ₹4.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Remaining CC road work in Naal area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303715

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work from Main road Towards Ramdevpir Temple area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303717

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work in Madhavbag Society at Marala road From Rinkeshbhai Rashmikant house towards Babubhai Valjibhai house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303718

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • CC road work from main road towards Mahilapura area

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303720

    ₹3.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work from vijaybhai natubhai house to ratilal ishvarbhai's house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303721

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • Paver Block work from Dashrathbhai somabhai's house towards swarupbhai atabhai's house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303722

    ₹1.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026
  • CC road work in Bhathapur from Main road to Punambhai Ishwarbhai's house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kheda· #303723

    ₹2.0 L Sanctioned · 30 Oct 2026Rec. 13 Aug 2026

18th Lok Sabha MPs from Gujarat

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1C R Patil · Navsari83%48%27881
2Bharatbhai Manubhai Sutariya · Amreli90%47%20076
3Mansukhbhai Dhanjibhai Vasava · Bharuch81%47%23171
4Bharatsinhji Shankarji Dabhi · Patan88%57%16271
5Rajeshbhai Naranbhai Chudasama · Junagadh98%41%15771
6Mukeshkumar Chandrakaant Dalal · Surat83%29%10969
7Shobhanaben Mahendrasinh Baraiya · Sabarkantha77%43%13167
8Parshottambhai Rupala · Rajkot91%30%11567
9Dhaval Laxmanbhai Patel · Valsad64%30%7866
10Mitesh Rameshbhai Bakabhai Patel · Anand83%53%26765
11Dr. Mansukh Mandaviya · Porbandar96%28%8264
12Jaswantsinh Sumanbhai Bhabhor · Dahod90%21%9964

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.