Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
73%
₹10.78 Cr recommended · 82 works
About the median
Paid to vendors
₹8.71 Cr
59% of allocation
Above median (37%)
Works completed
55
67% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP82 works
₹10.78 Cr · 73% of the ₹14.70 Cr allocated
- Sanctioned by the district78 works
95% sanctioned · took 6.1 months on average (due within 45 days)
- Completed55 works
₹6.02 Cr final cost · 7.1 months from recommendation on average
4 works are still awaiting sanction, 4 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 82 works worth ₹10.78 Cr, a fund utilisation of 73%, higher than 45% of 18th Lok Sabha MPs.
- The district has sanctioned 78 of them, taking 6.1 months on average.
- ₹8.71 Cr has been paid to vendors, 59% of the allocation.
- 55 works are complete, typically 7.1 months after recommendation. 18 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Education & libraries.
- Payments went to 48 vendors. The largest received 9.3%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 66/100: finishing works counts most
- Works completed 30%67Completed ÷ recommended works.
- Spending efficiency 20%69Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%73Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%33Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%59Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: P P CONSTRUCTION, 9.3% of payments across 48 vendors.
District sanction speed
76/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%76Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
82 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of 10,000 lit OHT with borewell and motor at ward no.04 in Thuraiyur Municipality
Drinking waterConstruction of water tanks· Tiruchirappalli· #254365
₹12.0 L Completed 13 Oct 2026Rec. 16 Dec 2025Paid ₹12.0 LSupply of a High Jump landing mat and all associated equipment to the Sports Stadium under the Perambalur District Sports Division, Perambalur District
Sports & fitnessProviding sports equipment, except consumable items· Perambalur· #299426
₹3.6 L Sanctioned · 5 Oct 2026Rec. 17 Aug 2026Providing Reverse Osmosis Plant 1000LPH in Sports Stadium under the Perambalur District Sports Division, Perambalur District
Drinking waterInstalling community drinking water plants· Perambalur· #299427
₹8.9 L Sanctioned · 5 Oct 2026Rec. 17 Aug 2026Construction of Bus shelter near PHC in Thandalaiputhur pt Musiri PU
Community buildings & public spacesConstruction of bus-sheds or bus-stops· Tiruchirappalli· #303375
₹10.0 L Sanctioned · 28 Sept 2026Rec. 17 Aug 2026Providing CC road at umar nagar kannika parameswari koil street unicode 1640025018 and trichy main road chathiram back side road unicode 1640032006 areas in Lalgudi Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Tiruchirappalli· #254361
₹10.0 L Physical Inspection · 11 Sept 2026Rec. 16 Dec 2025Paid ₹9.9 LConstruction of girls toilet at kanakiliyanallur GHSS in Kanakiliyanallur pt Pullambadi PU
Sanitation & drainageConstruction of public toilets and bathrooms· Tiruchirappalli· #254362
₹12.0 L Sanctioned · 11 Sept 2026Rec. 16 Dec 2025Construction of crematon shed at nadupatti in Pachaperumalpatti pt Uppiliyapuram PU
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Tiruchirappalli· #254363
₹6.2 L Sanctioned · 11 Sept 2026Rec. 16 Dec 2025Construction of crematon shed at p.kallanguthu in Pachaperumalpatti pt Uppiliyapuram PU
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Tiruchirappalli· #254364
₹4.6 L Sanctioned · 11 Sept 2026Rec. 16 Dec 2025Construction of 30,000 lit OHT at melakunnupatti in Kunnupatti pt Thuraiyur PU
Drinking waterConstruction of water tanks· Tiruchirappalli· #254366
₹19.7 L Physical Inspection · 11 Sept 2026Rec. 16 Dec 2025Paid ₹19.6 LConstruction of Drainage from karuppu kovil to mariyamman kovil at sangampatti in Kottaiyur Pt Thuraiyur PU
Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Tiruchirappalli· #286119
₹9.8 L Sanctioned · 11 Sept 2026Rec. 16 Jun 2026Construction of Ladies Toilet (1 Unit) at Valadi Govt. HSc School in Valadi Pt. in Lalgudi Union
Sanitation & drainageConstruction of toilet blocks· Tiruchirappalli· #222969
₹12.0 L Physical Inspection · 10 Sept 2026Rec. 26 Aug 2025Paid ₹11.8 LProviding CC road with drainage at ward no.04 mangala mariyamman koil street in Poolambadi TP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Perambalur· #254368
₹17.0 L Physical Inspection · 8 Sept 2026Rec. 16 Dec 2025Paid ₹17.0 LInstallation of R.O Plant at Aringar Anna Govt.Hr.Sec.School in Pachaperumalpatti Pt Uppiliyapuram PU
Drinking waterInstalling community drinking water plants· Tiruchirappalli· #286120
₹3.0 L Sanctioned · 8 Sept 2026Rec. 16 Jun 2026Costruction of Boys toilet (1 unit) for peruvalapur Govt.Hr.Sec.School in Peruvalapur Pt Pullambadi PU
Sanitation & drainageConstruction of toilet blocks· Tiruchirappalli· #286124
₹12.0 L Vendor Identification · 8 Sept 2026Rec. 16 Jun 2026Construction of PDS at ward no.22 (old ward no.15) then kallar street in Musiri Municioality
Community buildings & public spacesConstruction of buildings for community cultural activities· Tiruchirappalli· #303377
₹13.5 L Sanctioned · 8 Sept 2026Rec. 17 Aug 2026
18th Lok Sabha MPs from Tamil Nadu
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Dr Rani Sri Kumar · Tenkasi | 88% | 66% | 117 | 83 |
| 2 | V S Matheswaran · Namakkal | 79% | 62% | 150 | 82 |
| 3 | Tharaniventhan M S · Arani | 94% | 67% | 203 | 81 |
| 4 | Manickam Tagore B · Virudhunagar | 65% | 63% | 69 | 80 |
| 5 | Ganesan Selvam · Kancheepuram | 91% | 59% | 278 | 80 |
| 6 | CN Annadurai · Tiruvannamalai | 71% | 62% | 175 | 79 |
| 7 | K Subbarayan · Tiruppur | 94% | 57% | 65 | 76 |
| 8 | Gopinath K · Krishnagiri | 57% | 34% | 67 | 76 |
| 9 | Robert Bruce C · Tirunelveli | 95% | 49% | 76 | 76 |
| 10 | K E Prakash · Erode | 78% | 59% | 141 | 75 |
| 11 | M.K. Vishnuprasad · Cuddalore | 70% | 53% | 74 | 74 |
| 12 | Murasoli S · Thanjavur | 97% | 54% | 48 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.